메뉴 건너뛰기




Volumn 17, Issue 1 SPEC. ISS., 1996, Pages 55-71

The incremental development process in cleanroom software engineering

Author keywords

Cleanroom software engineering; Incremental development; Software life cycle; Software process model

Indexed keywords

CLEAN ROOMS; COMPUTER SIMULATION; COMPUTER SOFTWARE; MANAGEMENT; PLANNING; PROBABILITY; QUALITY ASSURANCE; RELIABILITY; SPECIFICATIONS; STATISTICAL TESTS;

EID: 0030127416     PISSN: 01679236     EISSN: None     Source Type: Journal    
DOI: 10.1016/0167-9236(95)00022-4     Document Type: Article
Times cited : (12)

References (21)
  • 1
    • 0024012763 scopus 로고
    • A spiral model of software development and enhancement
    • May
    • B. Boehm, A Spiral Model of Software Development and Enhancement, Computer, May (1988) 61-72.
    • (1988) Computer , pp. 61-72
    • Boehm, B.1
  • 2
    • 85029987888 scopus 로고
    • Software process models: Some new directions
    • April (1994) 1-9 and May
    • B. Boehm, Software Process Models: Some New Directions, Journal of the Society for Software Quality, April (1994) 1-9 and May (1994) 1-14.
    • (1994) Journal of the Society for Software Quality , pp. 1-14
    • Boehm, B.1
  • 3
    • 0023327532 scopus 로고
    • No silver bullet: Essence and accidents of software engineering
    • April
    • F. Brooks, No Silver Bullet: Essence and Accidents of Software Engineering, Computer, April (1987) 10-19.
    • (1987) Computer , pp. 10-19
    • Brooks, F.1
  • 4
    • 0025510192 scopus 로고
    • Engineering software under statistical quality control
    • November
    • R. Cobb and H. Mills, Engineering Software Under Statistical Quality Control, IEEE Software, 7(6) November (1990).
    • (1990) IEEE Software , vol.7 , Issue.6
    • Cobb, R.1    Mills, H.2
  • 6
    • 0028320266 scopus 로고
    • Adopting cleanroom software engineering with a phased approach
    • P. Hausler, R. Linger and C. Trammell, Adopting Cleanroom Software Engineering with a Phased Approach, IBM Systems Journal, 33(1) (1994).
    • (1994) IBM Systems Journal , vol.33 , Issue.1
    • Hausler, P.1    Linger, R.2    Trammell, C.3
  • 7
    • 0027887676 scopus 로고
    • Box structure methods for systems development with objects
    • A. Hevner and H. Mills, Box Structure Methods for Systems Development with Objects, IBM Systems Journal, 32(2) (1993).
    • (1993) IBM Systems Journal , vol.32 , Issue.2
    • Hevner, A.1    Mills, H.2
  • 8
    • 0029271795 scopus 로고
    • Box-structured requirements determination methods
    • A. Hevner and H. Mills, Box-Structured Requirements Determination Methods, Decision Support Systems 13 (1995) 223-239.
    • (1995) Decision Support Systems , vol.13 , pp. 223-239
    • Hevner, A.1    Mills, H.2
  • 9
    • 0028391939 scopus 로고
    • Cleanroom process model
    • March
    • R. Linger, Cleanroom Process Model, IEEE Software, March (1994).
    • (1994) IEEE Software
    • Linger, R.1
  • 10
    • 0024136727 scopus 로고
    • A case study in cleanroom software engineering: The IBM cobol structuring facility
    • Los Alamitos, CA IEEE Computer Society Press
    • R. Linger and H. Mills, A Case Study in Cleanroom Software Engineering: The IBM COBOL Structuring Facility, Proc. 12th Annual Int. Computer Software and Applications Conf., Los Alamitos, CA (IEEE Computer Society Press, 1988).
    • (1988) Proc. 12th Annual Int. Computer Software and Applications Conf.
    • Linger, R.1    Mills, H.2
  • 13
    • 0005255513 scopus 로고
    • Top-down programming in large systems
    • R. Ruskin, Ed., Prentice Hall, Englewood Cliffs, NJ
    • H. Mills, Top-Down Programming in Large Systems, in: R. Ruskin, Ed., Debugging Techniques in Large Systems (Prentice Hall, Englewood Cliffs, NJ, 1971).
    • (1971) Debugging Techniques in Large Systems
    • Mills, H.1
  • 16
    • 84949081896 scopus 로고
    • Cleanroom reliability manager: A case study using cleanroom with box structures adl
    • IBM STARS CDRL 1940, May
    • J. Poore, H. Mills, S. Hopkins, and J. Whittaker, Cleanroom Reliability Manager: A Case Study Using Cleanroom with Box Structures ADL, Software Engineering Technology Report, IBM STARS CDRL 1940, May (1990).
    • (1990) Software Engineering Technology Report
    • Poore, J.1    Mills, H.2    Hopkins, S.3    Whittaker, J.4
  • 17
    • 0002080664 scopus 로고
    • Planning and certifying software system reliability
    • January
    • J. Poore, H. Mills, and D. Mutchler, Planning and Certifying Software System Reliability, IEEE Software, January (1993).
    • (1993) IEEE Software
    • Poore, J.1    Mills, H.2    Mutchler, D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.