메뉴 건너뛰기




Volumn 34, Issue 4, 1996, Pages 999-1021

Analysis of partial setup strategies for solving the operational planning problem in parallel machine electronic assembly systems

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; MACHINERY; OPTIMIZATION; PLANNING; SCHEDULING;

EID: 0030126973     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608904947     Document Type: Article
Times cited : (24)

References (23)
  • 2
    • 0025474221 scopus 로고
    • A state-of-the-art review of parallel machine scheduling research
    • Cheng, T. C. E. and Sin, C. C. S., 1990, A state-of-the-art review of parallel machine scheduling research. European Journal of Operational Research, 47, 271-292.
    • (1990) European Journal of Operational Research , vol.47 , pp. 271-292
    • Cheng, T.C.E.1    Sin, C.C.S.2
  • 3
    • 0019572341 scopus 로고
    • State-space relaxation procedures for the computation of bounds to routing problems
    • Cristofides, N., Mingozzt, A. and Toth, P., 1981, State-space relaxation procedures for the computation of bounds to routing problems. Networks, 11, 145-164.
    • (1981) Networks , vol.11 , pp. 145-164
    • Cristofides, N.1    Mingozzt, A.2    Toth, P.3
  • 4
    • 0001923235 scopus 로고
    • An application of bin-packing to multiprocessor scheduling
    • Coffman, E. G., Garey, M. and Johnson, D., 1978, An application of bin-packing to multiprocessor scheduling. SIAM Journal of Computing, 7, 1-16.
    • (1978) SIAM Journal of Computing , vol.7 , pp. 1-16
    • Coffman, E.G.1    Garey, M.2    Johnson, D.3
  • 5
    • 0016484280 scopus 로고
    • Balancing workloads and minimizing set-up costs in the parallel processing shop
    • Deane, R. H. and White, E. R., 1975, Balancing workloads and minimizing set-up costs in the parallel processing shop. Operational Research Quarterly, 26, 45-53.
    • (1975) Operational Research Quarterly , vol.26 , pp. 45-53
    • Deane, R.H.1    White, E.R.2
  • 6
    • 0019574134 scopus 로고
    • A generalized assignment heuristic for vehicle routing
    • Fisher, M. L. and Jaikumar, R., 1981. A generalized assignment heuristic for vehicle routing. Networks, 11, 109-124.
    • (1981) Networks , vol.11 , pp. 109-124
    • Fisher, M.L.1    Jaikumar, R.2
  • 8
    • 0016971681 scopus 로고
    • Scheduling parallel production lines with changeover costs: Practical applications of a quadratic/LP approach
    • Geoffrion, A. M. and Graves, G. W., 1976, Scheduling parallel production lines with changeover costs: Practical applications of a quadratic/LP approach. Operations Research, 24, 595-610.
    • (1976) Operations Research , vol.24 , pp. 595-610
    • Geoffrion, A.M.1    Graves, G.W.2
  • 16
    • 0027609116 scopus 로고
    • A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine
    • Sadiq, M., Landers, T. L. and Taylor, G. D., 1993, A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine. International Journal of Production Research, 31, 1327-1341.
    • (1993) International Journal of Production Research , vol.31 , pp. 1327-1341
    • Sadiq, M.1    Landers, T.L.2    Taylor, G.D.3
  • 18
    • 0025413493 scopus 로고
    • Some heuristics for scheduling jobs on parallel machines with setups
    • So, K. C., 1990, Some heuristics for scheduling jobs on parallel machines with setups. Management Science, 36, 467-475.
    • (1990) Management Science , vol.36 , pp. 467-475
    • So, K.C.1
  • 19
    • 0025699778 scopus 로고
    • Scheduling batches on parallel machines with major and minor setups
    • Tang, C. S., 1990, Scheduling batches on parallel machines with major and minor setups. European Journal of Operational Research, 46, 28-37.
    • (1990) European Journal of Operational Research , vol.46 , pp. 28-37
    • Tang, C.S.1
  • 20
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine: Minimization of the number of tool switches
    • Tang, C. S. and Denardo, E., 1988, Models arising from a flexible manufacturing machine: minimization of the number of tool switches. Operations Research, 36, 767-784.
    • (1988) Operations Research , vol.36 , pp. 767-784
    • Tang, C.S.1    Denardo, E.2
  • 22
    • 0024016313 scopus 로고
    • An adaptable scheduling algorithm for flexible flow lines
    • Wittrock, R. J., 1988, An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36(3), 445-453.
    • (1988) Operations Research , vol.36 , Issue.3 , pp. 445-453
    • Wittrock, R.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.