-
1
-
-
0022959713
-
Configuration of flexible assembly systems in the electronics industry
-
Ammons, J., Lofgren, C. and McGinnis, L., 1986, Configuration of flexible assembly systems in the electronics industry. Proceedings of the 1986 HE Annual Conference, pp. 187-193.
-
(1986)
Proceedings of the 1986 HE Annual Conference
, pp. 187-193
-
-
Ammons, J.1
Lofgren, C.2
Mc Ginnis, L.3
-
2
-
-
0025474221
-
A state-of-the-art review of parallel machine scheduling research
-
Cheng, T. C. E. and Sin, C. C. S., 1990, A state-of-the-art review of parallel machine scheduling research. European Journal of Operational Research, 47, 271-292.
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 271-292
-
-
Cheng, T.C.E.1
Sin, C.C.S.2
-
3
-
-
0019572341
-
State-space relaxation procedures for the computation of bounds to routing problems
-
Cristofides, N., Mingozzt, A. and Toth, P., 1981, State-space relaxation procedures for the computation of bounds to routing problems. Networks, 11, 145-164.
-
(1981)
Networks
, vol.11
, pp. 145-164
-
-
Cristofides, N.1
Mingozzt, A.2
Toth, P.3
-
4
-
-
0001923235
-
An application of bin-packing to multiprocessor scheduling
-
Coffman, E. G., Garey, M. and Johnson, D., 1978, An application of bin-packing to multiprocessor scheduling. SIAM Journal of Computing, 7, 1-16.
-
(1978)
SIAM Journal of Computing
, vol.7
, pp. 1-16
-
-
Coffman, E.G.1
Garey, M.2
Johnson, D.3
-
5
-
-
0016484280
-
Balancing workloads and minimizing set-up costs in the parallel processing shop
-
Deane, R. H. and White, E. R., 1975, Balancing workloads and minimizing set-up costs in the parallel processing shop. Operational Research Quarterly, 26, 45-53.
-
(1975)
Operational Research Quarterly
, vol.26
, pp. 45-53
-
-
Deane, R.H.1
White, E.R.2
-
6
-
-
0019574134
-
A generalized assignment heuristic for vehicle routing
-
Fisher, M. L. and Jaikumar, R., 1981. A generalized assignment heuristic for vehicle routing. Networks, 11, 109-124.
-
(1981)
Networks
, vol.11
, pp. 109-124
-
-
Fisher, M.L.1
Jaikumar, R.2
-
8
-
-
0016971681
-
Scheduling parallel production lines with changeover costs: Practical applications of a quadratic/LP approach
-
Geoffrion, A. M. and Graves, G. W., 1976, Scheduling parallel production lines with changeover costs: Practical applications of a quadratic/LP approach. Operations Research, 24, 595-610.
-
(1976)
Operations Research
, vol.24
, pp. 595-610
-
-
Geoffrion, A.M.1
Graves, G.W.2
-
11
-
-
0022890910
-
Dynamic scheduling for flexible printed circuit card assembly
-
Atlanta, GA
-
Lofgren, C. B. and McGinnis, L. F., 1986b, Dynamic scheduling for flexible printed circuit card assembly. Proceedings of the IEEE Conference on Systems, Man, and Cybernetics, Atlanta, GA.
-
(1986)
Proceedings of the IEEE Conference on Systems, Man, and Cybernetics
-
-
Lofgren, C.B.1
Mc Ginnis, L.F.2
-
12
-
-
84941457782
-
Automated process planning for printed circuit card assembly
-
McGinnis, L. F., Ammons, J. C., Carlyle, M., Cranmer, L., Depuy, G. W., Ellis, K. P., Tovey, C. A. and Xu, H., 1992, Automated process planning for printed circuit card assembly. HE Transactions, 24, 18-30.
-
(1992)
HE Transactions
, vol.24
, pp. 18-30
-
-
Mc Ginnis, L.F.1
Ammons, J.C.2
Carlyle, M.3
Cranmer, L.4
Depuy, G.W.5
Ellis, K.P.6
Tovey, C.A.7
Xu, H.8
-
13
-
-
0041478480
-
-
MS thesis, The Pennsylvania State University, State College, PA
-
Pilgaonkar, R., 1990, Scheduling components for a printed circuit board assembly with reduced assembly time. MS thesis, The Pennsylvania State University, State College, PA.
-
(1990)
Scheduling Components for a Printed Circuit Board Assembly with Reduced Assembly Time
-
-
Pilgaonkar, R.1
-
14
-
-
0003438602
-
-
Englewood Cliffs, NJ: Prentice Hall)
-
Pinedo, M., 1995, Scheduling Theory, Algorithms, and Systems (Englewood Cliffs, NJ: Prentice Hall).
-
(1995)
Scheduling Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
15
-
-
0026373412
-
On scheduling parallel machines with two setup classes
-
Rajagopal, J. and Bidanda, B., 1991, On scheduling parallel machines with two setup classes. International Journal of Production Research, 29, 2443-2458.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2443-2458
-
-
Rajagopal, J.1
Bidanda, B.2
-
16
-
-
0027609116
-
A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine
-
Sadiq, M., Landers, T. L. and Taylor, G. D., 1993, A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine. International Journal of Production Research, 31, 1327-1341.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1327-1341
-
-
Sadiq, M.1
Landers, T.L.2
Taylor, G.D.3
-
18
-
-
0025413493
-
Some heuristics for scheduling jobs on parallel machines with setups
-
So, K. C., 1990, Some heuristics for scheduling jobs on parallel machines with setups. Management Science, 36, 467-475.
-
(1990)
Management Science
, vol.36
, pp. 467-475
-
-
So, K.C.1
-
19
-
-
0025699778
-
Scheduling batches on parallel machines with major and minor setups
-
Tang, C. S., 1990, Scheduling batches on parallel machines with major and minor setups. European Journal of Operational Research, 46, 28-37.
-
(1990)
European Journal of Operational Research
, vol.46
, pp. 28-37
-
-
Tang, C.S.1
-
20
-
-
0024070715
-
Models arising from a flexible manufacturing machine: Minimization of the number of tool switches
-
Tang, C. S. and Denardo, E., 1988, Models arising from a flexible manufacturing machine: minimization of the number of tool switches. Operations Research, 36, 767-784.
-
(1988)
Operations Research
, vol.36
, pp. 767-784
-
-
Tang, C.S.1
Denardo, E.2
-
21
-
-
0343784810
-
A computerized model for office layout
-
19, July
-
Vollmann, T. E., Nugent, C. E. and Zartler, R. L., 1968, A computerized model for office layout. The Journal of Industrial Engineering, 19, July, 321-327.
-
(1968)
The Journal of Industrial Engineering
, pp. 321-327
-
-
Vollmann, T.E.1
Nugent, C.E.2
Zartler, R.L.3
-
22
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
Wittrock, R. J., 1988, An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36(3), 445-453.
-
(1988)
Operations Research
, vol.36
, Issue.3
, pp. 445-453
-
-
Wittrock, R.J.1
|