|
Volumn 33, Issue 3, 1996, Pages 255-277
|
Discontinuity geometry characterization in a tunnel close to the proposed permanent shiplock area of the Three Gorges dam site in China
a a a b a |
Author keywords
[No Author keywords available]
|
Indexed keywords
DATA PROCESSING;
DISCONTINUITY;
FAULT GEOMETRY;
JOINT SET;
CHINA, YANGTZE RIVER, THREE GORGES DAM;
CHINA;
THREE GORGES PROJECT;;
COMPUTATIONAL GEOMETRY;
COMPUTER SIMULATION;
ESTIMATION;
MATHEMATICAL MODELS;
PROBABILITY;
ROCK MECHANICS;
ROCKS;
STATISTICAL METHODS;
DISCONTINUITY GEOMETRY;
DISCONTINUITY TRACE;
GAMMA DISTRIBUTIONS;
JOINT SPACING DISTRIBUTION;
MODELLING UNCERTAINTIES;
ROOF DATA;
TRACE LENGTH;
WALL DATA;
TUNNELS;
|
EID: 0030126518
PISSN: 01489062
EISSN: None
Source Type: Journal
DOI: 10.1016/0148-9062(95)00060-7 Document Type: Article |
Times cited : (73)
|
References (19)
|