-
1
-
-
0000532606
-
Jit purchasing: Attribute classification and literature review
-
Stamm, C.L. and Golhar, D.Y., 1993. Jit purchasing: Attribute classification and literature review. Prod. Planning Control. 4(3): 273-282.
-
(1993)
Prod. Planning Control
, vol.4
, Issue.3
, pp. 273-282
-
-
Stamm, C.L.1
Golhar, D.Y.2
-
3
-
-
0003449926
-
-
Institute of Industrial Enginneers, Atalanta
-
Monden, Y., 1983. Toyota Production Systems. Institute of Industrial Enginneers, Atalanta.
-
(1983)
Toyota Production Systems
-
-
Monden, Y.1
-
5
-
-
84968158679
-
Just-in-time purchasing: A challenge for U.S. industry
-
Schonberger, R.J. and Gilbert, J.P., 1983. Just-in-Time Purchasing: A challenge for U.S. Industry. California Mgmt. Rev., 26(1): 54-68.
-
(1983)
California Mgmt. Rev.
, vol.26
, Issue.1
, pp. 54-68
-
-
Schonberger, R.J.1
Gilbert, J.P.2
-
6
-
-
0002843888
-
Just in time production and purchasing
-
Hahn, C.K., Pinto, P.A., and Bragg, D.J., 1983. Just in time production and purchasing. J. Purchasing Mater. Mgmt., 19(4): 2-10.
-
(1983)
J. Purchasing Mater. Mgmt.
, vol.19
, Issue.4
, pp. 2-10
-
-
Hahn, C.K.1
Pinto, P.A.2
Bragg, D.J.3
-
7
-
-
0003043902
-
Just in time purchasing: Problems and solutions
-
Ansari, A., and Modarress, B., 1986. Just in time purchasing: Problems and solutions. J. Purchasing Mater. Mgmt., 22(2): 11-15.
-
(1986)
J. Purchasing Mater. Mgmt.
, vol.22
, Issue.2
, pp. 11-15
-
-
Ansari, A.1
Modarress, B.2
-
8
-
-
0023843134
-
Jit purchasing as a quality and productivity centre
-
Ansari, A. and Modarress, B., 1988. Jit purchasing as a quality and productivity centre. Int. J. Prod. Res., 26(1): 19-26.
-
(1988)
Int. J. Prod. Res.
, vol.26
, Issue.1
, pp. 19-26
-
-
Ansari, A.1
Modarress, B.2
-
10
-
-
0003149547
-
Comparative analysis of japanese just in time purchasing and traditional US purchasing system
-
Lee, S.M. and Ansari A., 1985. Comparative analysis of Japanese just in time purchasing and traditional US purchasing system. Int. J. Oper. Prod. Mgmt., 5(4): 5-14.
-
(1985)
Int. J. Oper. Prod. Mgmt.
, vol.5
, Issue.4
, pp. 5-14
-
-
Lee, S.M.1
Ansari, A.2
-
11
-
-
0001831365
-
Suppliers and the just in time concept
-
Manoochehri, G.H., 1984. Suppliers and the just in time concept. J. Purchasing Mater. Mgmt., 20(4): 16-21.
-
(1984)
J. Purchasing Mater. Mgmt.
, vol.20
, Issue.4
, pp. 16-21
-
-
Manoochehri, G.H.1
-
12
-
-
0002529697
-
The buyer-seller linkage in a just in time environment
-
O'Neal, C.R., 1987, The buyer-seller linkage in a just in time environment. J. Purchasing Mater. Mgmt., 23(1): 7-13.
-
(1987)
J. Purchasing Mater. Mgmt.
, vol.23
, Issue.1
, pp. 7-13
-
-
O'Neal, C.R.1
-
13
-
-
0002852480
-
A feasibility study of JIT purchasing implementation in a manufacturing facility
-
Gupta, Y.P., 1990. A Feasibility Study of JIT purchasing implementation in a manufacturing facility. Inte. J. Oper. Prod. Mgmt., 10(1): 31-41.
-
(1990)
Inte. J. Oper. Prod. Mgmt.
, vol.10
, Issue.1
, pp. 31-41
-
-
Gupta, Y.P.1
-
14
-
-
0025261570
-
Recasting the traditional inventory model to implement JIT purchasing
-
Ramasesh, R.V., 1990. Recasting the traditional inventory model to implement JIT purchasing. Prod. Inven. Mgmt. J., 31(2): 71-75.
-
(1990)
Prod. Inven. Mgmt. J.
, vol.31
, Issue.2
, pp. 71-75
-
-
Ramasesh, R.V.1
-
15
-
-
0002501590
-
A vendor's view of the JIT manufacturing system
-
Das, C. and Goyal, S.K., 1990. A vendor's view of the JIT manufacturing system. Int. J. Oper. Prod. Mgmt., 9(8): 56-67.
-
(1990)
Int. J. Oper. Prod. Mgmt.
, vol.9
, Issue.8
, pp. 56-67
-
-
Das, C.1
Goyal, S.K.2
-
18
-
-
0001968136
-
Issues in setting up JIT supply
-
Harrison, A. and Voss, C., 1990. Issues in setting up JIT supply. Int. J. Oper. Prod. Mgmt., 10(2): 84-93.
-
(1990)
Int. J. Oper. Prod. Mgmt.
, vol.10
, Issue.2
, pp. 84-93
-
-
Harrison, A.1
Voss, C.2
-
19
-
-
0010063195
-
Closing the gap between buyer and vendor
-
Dumond, J.E. and Newman, W., 1990. Closing the gap between buyer and vendor. Prod. Invent. Mgmt. J., 31(4): 13-17.
-
(1990)
Prod. Invent. Mgmt. J.
, vol.31
, Issue.4
, pp. 13-17
-
-
Dumond, J.E.1
Newman, W.2
-
21
-
-
0002537975
-
How much has really changed between U.S. automakers and their suppliers?
-
Helper, S., 1991. How much has really changed between U.S. automakers and their suppliers? Sloan Mgmt. Rev., 15-28.
-
(1991)
Sloan Mgmt. Rev.
, pp. 15-28
-
-
Helper, S.1
-
24
-
-
0000545566
-
The changing relationship between original equipment manufacturers and their supplier
-
Cole, G.S., 1988. The changing relationship between original equipment manufacturers and their supplier. Int. J. Technol. Mgmt., 3(3): 299-324.
-
(1988)
Int. J. Technol. Mgmt.
, vol.3
, Issue.3
, pp. 299-324
-
-
Cole, G.S.1
-
25
-
-
0043170022
-
A dynamic view of vendor relations under JIT
-
Nelson, A.P. and Jambckar, A.N., 1990. A dynamic view of vendor relations under JIT. Prod. Invent. Mgmt. J., 31(4): 65-70.
-
(1990)
Prod. Invent. Mgmt. J.
, vol.31
, Issue.4
, pp. 65-70
-
-
Nelson, A.P.1
Jambckar, A.N.2
-
26
-
-
0025256832
-
Quality certification of suppliers by JIT manufacturing firms
-
Inman, R.A., 1990. Quality certification of suppliers by JIT manufacturing firms. Prod. Invent. Mgmt. J., 31(2): 58-61.
-
(1990)
Prod. Invent. Mgmt. J.
, vol.31
, Issue.2
, pp. 58-61
-
-
Inman, R.A.1
-
27
-
-
0024132057
-
The buyer-supplier relationship under just-in-time
-
Newman, G.R., 1988. The buyer-supplier relationship under just-in-time. Prod. Invent. Mgmt. J., 45-50.
-
(1988)
Prod. Invent. Mgmt. J.
, pp. 45-50
-
-
Newman, G.R.1
-
28
-
-
0009943983
-
New trends in the supply environment
-
De Toni, A., Nassimbeni, G. and Tonchia, S., 1994. New trends in the supply environment. Logistics Inform. Mgmt., 7(4): 41-50.
-
(1994)
Logistics Inform. Mgmt.
, vol.7
, Issue.4
, pp. 41-50
-
-
De Toni, A.1
Nassimbeni, G.2
Tonchia, S.3
-
29
-
-
29344462843
-
Supply networks: Genesis, stability and logistics implications
-
De Toni, A. and Nassimbeni, G., 1995. Supply networks: Genesis, stability and logistics implications. OMEGA -Int. J. Mgmt. Sci., 23(4): 403-418.
-
(1995)
OMEGA -Int. J. Mgmt. Sci.
, vol.23
, Issue.4
, pp. 403-418
-
-
De Toni, A.1
Nassimbeni, G.2
-
30
-
-
0001113331
-
Project scope and project performance: The effect of parts strategy and supplier involvement on product development
-
Clark, K., 1989. Project scope and project performance: The effect of parts strategy and supplier involvement on product development. Mgmt. Sci., 35(10): 1247-1263.
-
(1989)
Mgmt. Sci.
, vol.35
, Issue.10
, pp. 1247-1263
-
-
Clark, K.1
-
31
-
-
0000183694
-
Strategic options for automotive suppliers in the global market
-
Lamming, R., 1990. Strategic options for automotive suppliers in the global market. Int. J. Technol. Mgmt., 5(6): 649-684.
-
(1990)
Int. J. Technol. Mgmt.
, vol.5
, Issue.6
, pp. 649-684
-
-
Lamming, R.1
-
33
-
-
0001465496
-
Managing suppliers up to speed
-
Burt, D.N., 1989. Managing suppliers up to speed. Har. Bus. Rev., 67(4): 127-135.
-
(1989)
Har. Bus. Rev.
, vol.67
, Issue.4
, pp. 127-135
-
-
Burt, D.N.1
-
34
-
-
84989040047
-
Buyer supplier relations in the UK automotive industry: Strategic implications of the Japanese manufacturing model
-
Turnbull, P., Oliver, N. and Wilkinson, B., 1992. Buyer supplier relations in the UK automotive industry: Strategic implications of the Japanese manufacturing model. Strategic Mgmt. J., 13: 159-168.
-
(1992)
Strategic Mgmt. J.
, vol.13
, pp. 159-168
-
-
Turnbull, P.1
Oliver, N.2
Wilkinson, B.3
-
35
-
-
0026418491
-
Vendor selection criteria and methods
-
Weber, C., Current, J. and Benton, W., 1991. Vendor selection criteria and methods. Eur. J. Ope. Res., 50(1): 67-78.
-
(1991)
Eur. J. Ope. Res.
, vol.50
, Issue.1
, pp. 67-78
-
-
Weber, C.1
Current, J.2
Benton, W.3
-
36
-
-
0003047269
-
Supplier management in support of JIT activity: A research agenda
-
Macbeth, D.K., 1990. Supplier management in support of JIT activity: A research agenda. Int. J. Prod. Oper. Mgmt., 7(4): 53-63.
-
(1990)
Int. J. Prod. Oper. Mgmt.
, vol.7
, Issue.4
, pp. 53-63
-
-
Macbeth, D.K.1
-
37
-
-
0001858350
-
Exploring the logistics interface between global and JIT sourcing
-
Fawcett, S.E. and Birou, L., 1992. Exploring the logistics interface between global and JIT sourcing. Int. J. Phys. Distribution Logist. Mgmt., 22(1): 3-14.
-
(1992)
Int. J. Phys. Distribution Logist. Mgmt.
, vol.22
, Issue.1
, pp. 3-14
-
-
Fawcett, S.E.1
Birou, L.2
-
43
-
-
0041667018
-
Buyer-seller relations: Improving the effectiveness of materials supply
-
Hellberg, R.B. and Oyvind, M.M., 1990. Buyer-seller relations: Improving the effectiveness of materials supply. The Int. J. Logist. Mgmt., 1(1): 36-43.
-
(1990)
The Int. J. Logist. Mgmt.
, vol.1
, Issue.1
, pp. 36-43
-
-
Hellberg, R.B.1
Oyvind, M.M.2
-
45
-
-
0042668944
-
-
Working Paper 90-10, University of Minnesota
-
Sakakibara, S., Flynn, B.B. and Schroeder, R.G., 1990 A just-in-time manufacturing framework and measurement instrument. Working Paper 90-10, University of Minnesota.
-
(1990)
A Just-in-Time Manufacturing Framework and Measurement Instrument
-
-
Sakakibara, S.1
Flynn, B.B.2
Schroeder, R.G.3
-
46
-
-
0042668945
-
-
Working Paper 92-8, University of Minnesota
-
Sakakibara, S., Flynn, B.B., Schroeder, R.G. and Morris, W.T., 1992. The impact of just-in-time manufacturing and its infrastructure on manufacturing performance. Working Paper 92-8, University of Minnesota.
-
(1992)
The Impact of Just-in-Time Manufacturing and Its Infrastructure on Manufacturing Performance
-
-
Sakakibara, S.1
Flynn, B.B.2
Schroeder, R.G.3
Morris, W.T.4
-
47
-
-
0028401194
-
A framework for quality management research and an associated measurement instrument
-
Flynn, B.B., Schroeder, R.G. and Sakakibara S., 1994. A framework for quality management research and an associated measurement instrument. J. Oper. Mgmt., 11: 339-366.
-
(1994)
J. Oper. Mgmt.
, vol.11
, pp. 339-366
-
-
Flynn, B.B.1
Schroeder, R.G.2
Sakakibara, S.3
|