Volumn 42, Issue 3, 1996, Pages 275-288

Factors underlying operational JIT purchasing practices: Results of an empirical research

Author keywords

Buyer supplier interaction practices; Jit purchasing; Operations management; Survey

Indexed keywords

ELECTRONICS INDUSTRY; MACHINERY; MANAGEMENT SCIENCE; OPERATIONS RESEARCH; PRODUCT DESIGN; QUALITY ASSURANCE; SURVEYS;

EID: 0030121586     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/0925-5273(95)00190-5     Document Type: Article
Times cited : (21)

References (48)
  • 1
    • 0000532606 scopus 로고
    • Jit purchasing: Attribute classification and literature review
    • Stamm, C.L. and Golhar, D.Y., 1993. Jit purchasing: Attribute classification and literature review. Prod. Planning Control. 4(3): 273-282.
    • (1993) Prod. Planning Control , vol.4 , Issue.3 , pp. 273-282
    • Stamm, C.L.1    Golhar, D.Y.2
  • 3
    • 0003449926 scopus 로고
    • Institute of Industrial Enginneers, Atalanta
    • Monden, Y., 1983. Toyota Production Systems. Institute of Industrial Enginneers, Atalanta.
    • (1983) Toyota Production Systems
    • Monden, Y.1
  • 5
    • 84968158679 scopus 로고
    • Just-in-time purchasing: A challenge for U.S. industry
    • Schonberger, R.J. and Gilbert, J.P., 1983. Just-in-Time Purchasing: A challenge for U.S. Industry. California Mgmt. Rev., 26(1): 54-68.
    • (1983) California Mgmt. Rev. , vol.26 , Issue.1 , pp. 54-68
    • Schonberger, R.J.1    Gilbert, J.P.2
  • 7
    • 0003043902 scopus 로고
    • Just in time purchasing: Problems and solutions
    • Ansari, A., and Modarress, B., 1986. Just in time purchasing: Problems and solutions. J. Purchasing Mater. Mgmt., 22(2): 11-15.
    • (1986) J. Purchasing Mater. Mgmt. , vol.22 , Issue.2 , pp. 11-15
    • Ansari, A.1    Modarress, B.2
  • 8
    • 0023843134 scopus 로고
    • Jit purchasing as a quality and productivity centre
    • Ansari, A. and Modarress, B., 1988. Jit purchasing as a quality and productivity centre. Int. J. Prod. Res., 26(1): 19-26.
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.1 , pp. 19-26
    • Ansari, A.1    Modarress, B.2
  • 10
    • 0003149547 scopus 로고
    • Comparative analysis of japanese just in time purchasing and traditional US purchasing system
    • Lee, S.M. and Ansari A., 1985. Comparative analysis of Japanese just in time purchasing and traditional US purchasing system. Int. J. Oper. Prod. Mgmt., 5(4): 5-14.
    • (1985) Int. J. Oper. Prod. Mgmt. , vol.5 , Issue.4 , pp. 5-14
    • Lee, S.M.1    Ansari, A.2
  • 11
    • 0001831365 scopus 로고
    • Suppliers and the just in time concept
    • Manoochehri, G.H., 1984. Suppliers and the just in time concept. J. Purchasing Mater. Mgmt., 20(4): 16-21.
    • (1984) J. Purchasing Mater. Mgmt. , vol.20 , Issue.4 , pp. 16-21
    • Manoochehri, G.H.1
  • 12
    • 0002529697 scopus 로고
    • The buyer-seller linkage in a just in time environment
    • O'Neal, C.R., 1987, The buyer-seller linkage in a just in time environment. J. Purchasing Mater. Mgmt., 23(1): 7-13.
    • (1987) J. Purchasing Mater. Mgmt. , vol.23 , Issue.1 , pp. 7-13
    • O'Neal, C.R.1
  • 13
    • 0002852480 scopus 로고
    • A feasibility study of JIT purchasing implementation in a manufacturing facility
    • Gupta, Y.P., 1990. A Feasibility Study of JIT purchasing implementation in a manufacturing facility. Inte. J. Oper. Prod. Mgmt., 10(1): 31-41.
    • (1990) Inte. J. Oper. Prod. Mgmt. , vol.10 , Issue.1 , pp. 31-41
    • Gupta, Y.P.1
  • 14
    • 0025261570 scopus 로고
    • Recasting the traditional inventory model to implement JIT purchasing
    • Ramasesh, R.V., 1990. Recasting the traditional inventory model to implement JIT purchasing. Prod. Inven. Mgmt. J., 31(2): 71-75.
    • (1990) Prod. Inven. Mgmt. J. , vol.31 , Issue.2 , pp. 71-75
    • Ramasesh, R.V.1
  • 15
    • 0002501590 scopus 로고
    • A vendor's view of the JIT manufacturing system
    • Das, C. and Goyal, S.K., 1990. A vendor's view of the JIT manufacturing system. Int. J. Oper. Prod. Mgmt., 9(8): 56-67.
    • (1990) Int. J. Oper. Prod. Mgmt. , vol.9 , Issue.8 , pp. 56-67
    • Das, C.1    Goyal, S.K.2
  • 18
    • 0001968136 scopus 로고
    • Issues in setting up JIT supply
    • Harrison, A. and Voss, C., 1990. Issues in setting up JIT supply. Int. J. Oper. Prod. Mgmt., 10(2): 84-93.
    • (1990) Int. J. Oper. Prod. Mgmt. , vol.10 , Issue.2 , pp. 84-93
    • Harrison, A.1    Voss, C.2
  • 19
    • 0010063195 scopus 로고
    • Closing the gap between buyer and vendor
    • Dumond, J.E. and Newman, W., 1990. Closing the gap between buyer and vendor. Prod. Invent. Mgmt. J., 31(4): 13-17.
    • (1990) Prod. Invent. Mgmt. J. , vol.31 , Issue.4 , pp. 13-17
    • Dumond, J.E.1    Newman, W.2
  • 21
    • 0002537975 scopus 로고
    • How much has really changed between U.S. automakers and their suppliers?
    • Helper, S., 1991. How much has really changed between U.S. automakers and their suppliers? Sloan Mgmt. Rev., 15-28.
    • (1991) Sloan Mgmt. Rev. , pp. 15-28
    • Helper, S.1
  • 24
    • 0000545566 scopus 로고
    • The changing relationship between original equipment manufacturers and their supplier
    • Cole, G.S., 1988. The changing relationship between original equipment manufacturers and their supplier. Int. J. Technol. Mgmt., 3(3): 299-324.
    • (1988) Int. J. Technol. Mgmt. , vol.3 , Issue.3 , pp. 299-324
    • Cole, G.S.1
  • 25
    • 0043170022 scopus 로고
    • A dynamic view of vendor relations under JIT
    • Nelson, A.P. and Jambckar, A.N., 1990. A dynamic view of vendor relations under JIT. Prod. Invent. Mgmt. J., 31(4): 65-70.
    • (1990) Prod. Invent. Mgmt. J. , vol.31 , Issue.4 , pp. 65-70
    • Nelson, A.P.1    Jambckar, A.N.2
  • 26
    • 0025256832 scopus 로고
    • Quality certification of suppliers by JIT manufacturing firms
    • Inman, R.A., 1990. Quality certification of suppliers by JIT manufacturing firms. Prod. Invent. Mgmt. J., 31(2): 58-61.
    • (1990) Prod. Invent. Mgmt. J. , vol.31 , Issue.2 , pp. 58-61
    • Inman, R.A.1
  • 27
    • 0024132057 scopus 로고
    • The buyer-supplier relationship under just-in-time
    • Newman, G.R., 1988. The buyer-supplier relationship under just-in-time. Prod. Invent. Mgmt. J., 45-50.
    • (1988) Prod. Invent. Mgmt. J. , pp. 45-50
    • Newman, G.R.1
  • 29
    • 29344462843 scopus 로고
    • Supply networks: Genesis, stability and logistics implications
    • De Toni, A. and Nassimbeni, G., 1995. Supply networks: Genesis, stability and logistics implications. OMEGA -Int. J. Mgmt. Sci., 23(4): 403-418.
    • (1995) OMEGA -Int. J. Mgmt. Sci. , vol.23 , Issue.4 , pp. 403-418
    • De Toni, A.1    Nassimbeni, G.2
  • 30
    • 0001113331 scopus 로고
    • Project scope and project performance: The effect of parts strategy and supplier involvement on product development
    • Clark, K., 1989. Project scope and project performance: The effect of parts strategy and supplier involvement on product development. Mgmt. Sci., 35(10): 1247-1263.
    • (1989) Mgmt. Sci. , vol.35 , Issue.10 , pp. 1247-1263
    • Clark, K.1
  • 31
    • 0000183694 scopus 로고
    • Strategic options for automotive suppliers in the global market
    • Lamming, R., 1990. Strategic options for automotive suppliers in the global market. Int. J. Technol. Mgmt., 5(6): 649-684.
    • (1990) Int. J. Technol. Mgmt. , vol.5 , Issue.6 , pp. 649-684
    • Lamming, R.1
  • 33
    • 0001465496 scopus 로고
    • Managing suppliers up to speed
    • Burt, D.N., 1989. Managing suppliers up to speed. Har. Bus. Rev., 67(4): 127-135.
    • (1989) Har. Bus. Rev. , vol.67 , Issue.4 , pp. 127-135
    • Burt, D.N.1
  • 34
    • 84989040047 scopus 로고
    • Buyer supplier relations in the UK automotive industry: Strategic implications of the Japanese manufacturing model
    • Turnbull, P., Oliver, N. and Wilkinson, B., 1992. Buyer supplier relations in the UK automotive industry: Strategic implications of the Japanese manufacturing model. Strategic Mgmt. J., 13: 159-168.
    • (1992) Strategic Mgmt. J. , vol.13 , pp. 159-168
    • Turnbull, P.1    Oliver, N.2    Wilkinson, B.3
  • 35
    • 0026418491 scopus 로고
    • Vendor selection criteria and methods
    • Weber, C., Current, J. and Benton, W., 1991. Vendor selection criteria and methods. Eur. J. Ope. Res., 50(1): 67-78.
    • (1991) Eur. J. Ope. Res. , vol.50 , Issue.1 , pp. 67-78
    • Weber, C.1    Current, J.2    Benton, W.3
  • 36
    • 0003047269 scopus 로고
    • Supplier management in support of JIT activity: A research agenda
    • Macbeth, D.K., 1990. Supplier management in support of JIT activity: A research agenda. Int. J. Prod. Oper. Mgmt., 7(4): 53-63.
    • (1990) Int. J. Prod. Oper. Mgmt. , vol.7 , Issue.4 , pp. 53-63
    • Macbeth, D.K.1
  • 37
    • 0001858350 scopus 로고
    • Exploring the logistics interface between global and JIT sourcing
    • Fawcett, S.E. and Birou, L., 1992. Exploring the logistics interface between global and JIT sourcing. Int. J. Phys. Distribution Logist. Mgmt., 22(1): 3-14.
    • (1992) Int. J. Phys. Distribution Logist. Mgmt. , vol.22 , Issue.1 , pp. 3-14
    • Fawcett, S.E.1    Birou, L.2
  • 43
    • 0041667018 scopus 로고
    • Buyer-seller relations: Improving the effectiveness of materials supply
    • Hellberg, R.B. and Oyvind, M.M., 1990. Buyer-seller relations: Improving the effectiveness of materials supply. The Int. J. Logist. Mgmt., 1(1): 36-43.
    • (1990) The Int. J. Logist. Mgmt. , vol.1 , Issue.1 , pp. 36-43
    • Hellberg, R.B.1    Oyvind, M.M.2
  • 47
    • 0028401194 scopus 로고
    • A framework for quality management research and an associated measurement instrument
    • Flynn, B.B., Schroeder, R.G. and Sakakibara S., 1994. A framework for quality management research and an associated measurement instrument. J. Oper. Mgmt., 11: 339-366.
    • (1994) J. Oper. Mgmt. , vol.11 , pp. 339-366
    • Flynn, B.B.1    Schroeder, R.G.2    Sakakibara, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.