메뉴 건너뛰기




Volumn 143, Issue 2, 1996, Pages 114-124

Anytime heuristic schedule repair in manufacturing industry

Author keywords

Dynamic manufacturing systems; Schedule repair

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; COMPUTER SOFTWARE; FLEXIBLE MANUFACTURING SYSTEMS; HEURISTIC PROGRAMMING; PERFORMANCE; REPAIR;

EID: 0030105340     PISSN: 13502379     EISSN: None     Source Type: Journal    
DOI: 10.1049/ip-cta:19960277     Document Type: Article
Times cited : (10)

References (19)
  • 1
    • 0028531367 scopus 로고
    • An effective heuristic method for generalised job shop scheduling with due dates
    • YANG, T.,HE, Z.,and CHO, K.K.:'An effective heuristic method for generalised job shop scheduling with due dates', Comput. Ind. Eng.,1994, 26, pp. 647-660
    • (1994) Comput. Ind. Eng. , vol.26 , pp. 647-660
    • Yang, T.1    He, Z.2    Cho, K.K.3
  • 3
    • 7544231326 scopus 로고
    • An effective heuristic for flow shop problems with total flow time as criterion
    • VEMPATI, V.S.,CHEN, C.-L.,and BULLINGTON, S.F.:'An effective heuristic for flow shop problems with total flow time as criterion', Comput. Ind. Eng.,1993, 25, pp. 219-222
    • (1993) Comput. Ind. Eng. , vol.25 , pp. 219-222
    • Vempati, V.S.1    Chen, C.-L.2    Bullington, S.F.3
  • 4
    • 0028467575 scopus 로고
    • Influence of the structure of a static permutation flowshop problem on the performance of single shot heuristics
    • BOLOGNINI, M.,BORELLI, R.,SEMERARO, Q.,and TOLIO, T.:'Influence of the structure of a static permutation flowshop problem on the performance of single shot heuristics', Comput. Ind. Eng.,1994, 26, pp. 437-450
    • (1994) Comput. Ind. Eng. , vol.26 , pp. 437-450
    • Bolognini, M.1    Borelli, R.2    Semeraro, Q.3    Tolio, T.4
  • 5
    • 0029224646 scopus 로고
    • Incorporating on-line scheduling strategies in integrated batch production control
    • HUERCIO, A.,ESPUÑA, A.,and PUIGJANER : 'Incorporating on-line scheduling strategies in integrated batch production control', Comput. Ind. Eng.,1995, 19, Suppl. pp. S609-S614
    • (1995) Comput. Ind. Eng. , vol.19 , Issue.SUPPL.
    • Huercio, A.1    Espuña, A.2    Puigjaner3
  • 6
    • 38149143913 scopus 로고
    • A new adaplively weighted combinatorial dispatching rule for complex scheduling problems
    • TZAFESTAS, S.,and TRIANTAFYLLAKIS, A.:'A new adaplively weighted combinatorial dispatching rule for complex scheduling problems', Comput. Integr. Manuf. Syst.,1994, 7, (1), pp. 7-15
    • (1994) Comput. Integr. Manuf. Syst. , vol.7 , Issue.1 , pp. 7-15
    • Tzafestas, S.1    Triantafyllakis, A.2
  • 7
    • 0000250053 scopus 로고
    • Dynamic control of flexible manufacturing systems
    • DOLINSKA, M.,and BESANT, C.B.:'Dynamic control of flexible manufacturing systems', Int. J. Adv. Manuf. Technol.,1995, 10, pp. 131-138
    • (1995) Int. J. Adv. Manuf. Technol. , vol.10 , pp. 131-138
    • Dolinska, M.1    Besant, C.B.2
  • 8
    • 0025442958 scopus 로고
    • An integrated framework for generating and revising factory schedules
    • SMITH, S.F.,OW, P.S.,POTVIN, J.-Y.,MUSCETTOLA, N.,and MATTHYS, D.C.:'An integrated framework for generating and revising factory schedules', Int. J. Oper. Res.,1990, 41, (6), pp. 539-552
    • (1990) Int. J. Oper. Res. , vol.41 , Issue.6 , pp. 539-552
    • Smith, S.F.1    Ow, P.S.2    Potvin, J.-Y.3    Muscettola, N.4    Matthys, D.C.5
  • 9
    • 0026103848 scopus 로고
    • Resource allocation in distributed factory scheduling
    • SYCARA, K.P.,ROTH, S.F.,SADEH, N.,and FOX, M.S.:'Resource allocation in distributed factory scheduling', IEEE Expert, 1991, 6, (1), pp. 29-10
    • (1991) IEEE Expert , vol.6 , Issue.1 , pp. 29-110
    • Sycara, K.P.1    Roth, S.F.2    Sadeh, N.3    Fox, M.S.4
  • 10
    • 0026851612 scopus 로고
    • Resource configuration and allocation
    • SATHI, N.,FOX, M.S.,GOYAL, R.,and KOTT, S.:'Resource configuration and allocation', IEEE Expert, 1992, 7, (2), pp. 26-35
    • (1992) IEEE Expert , vol.7 , Issue.2 , pp. 26-35
    • Sathi, N.1    Fox, M.S.2    Goyal, R.3    Kott, S.4
  • 11
    • 0002743345 scopus 로고
    • A knowledge-based approach to dynamic job-shop scheduling
    • FARHOODI, F.:'A knowledge-based approach to dynamic job-shop scheduling', Int. J. Comput. Integr. Manuf.,1990, 3, (2), pp. 84-95
    • (1990) Int. J. Comput. Integr. Manuf. , vol.3 , Issue.2 , pp. 84-95
    • Farhoodi, F.1
  • 12
    • 85033068060 scopus 로고
    • Design considerations for reactive scheduling
    • Artificial Intelligence Applications Institute, University of Edinburgh
    • BECK, H.A.:'Design considerations for reactive scheduling', Technical report,Artificial Intelligence Applications Institute, University of Edinburgh, 1992
    • (1992) Technical Report
    • Beck, H.A.1
  • 14
    • 33746098414 scopus 로고
    • Repair for scheduling and rescheduling
    • ZWEBEN, M.:'Repair for scheduling and rescheduling', IEEE Trans.,1992, SMC-20,
    • (1992) IEEE Trans. , vol.SMC-20
    • Zweben, M.1
  • 15
    • 0029306384 scopus 로고
    • Solving problems in production scheduling
    • LANE, R.,and EVANS, S.:'Solving problems in production scheduling', Comput. Integr. Manuf. Syst.,1995, 8, pp. 117-124
    • (1995) Comput. Integr. Manuf. Syst. , vol.8 , pp. 117-124
    • Lane, R.1    Evans, S.2
  • 17
    • 84973774282 scopus 로고
    • Active rescheduling and collaboration in dynamic manufacturing systems
    • INTERRANTE, L.D.,and ROCHOWIAK, D.M.:'Active rescheduling and collaboration in dynamic manufacturing systems', Concur. Eng., Res. Appl, 1994, 2, pp. 97-105
    • (1994) Concur. Eng., Res. Appl , vol.2 , pp. 97-105
    • Interrante, L.D.1    Rochowiak, D.M.2
  • 18
    • 33746074686 scopus 로고
    • Solving time-dependent planning problems
    • Department of Computer Science, Brown University, Providence, RI
    • BODDY, M.,and DEAN, T.L.:'Solving time-dependent planning problems',Technical report CS-89-03,Department of Computer Science, Brown University, Providence, RI, 1989
    • (1989) Technical Report CS-89-03
    • Dean, T.L.1
  • 19
    • 0019585243 scopus 로고
    • A review of production scheduling
    • GRAVES, S.C.:'A review of production scheduling', Oper. Res.,1981, 29, (4), pp. 646-675
    • (1981) Oper. Res. , vol.29 , Issue.4 , pp. 646-675
    • Graves, S.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.