-
3
-
-
17144397573
-
-
Milford, Conn.
-
BUSINESS TECHNOLOGY MANAGEMENT INC. 1989. Flow Management Technology. Milford, Conn.
-
(1989)
Flow Management Technology
-
-
-
4
-
-
0020087928
-
'Optimal' operating rules for automatic manufacturing systems
-
BUZACOTT, J. A. 1982. 'Optimal' Operating Rules for Automatic Manufacturing Systems. IEEE Trans. Autom. Control AC-27, 80-86.
-
(1982)
IEEE Trans. Autom. Control
, vol.AC-27
, pp. 80-86
-
-
Buzacott, J.A.1
-
5
-
-
84987012950
-
A general approach for coordinating production in multiple-cell manufacturing systems
-
BUZACOTT, J. A., AND J. G. SHANTHIKUMAR. 1992. A General Approach for Coordinating Production in Multiple-Cell Manufacturing Systems. POMS 1, 34-52.
-
(1992)
POMS
, vol.1
, pp. 34-52
-
-
Buzacott, J.A.1
Shanthikumar, J.G.2
-
6
-
-
0002395681
-
Chance-Constrained programming
-
CHARNES, A., AND W. W. COOPER. 1959. Chance-Constrained Programming. Mgmt. Sci. 6, 73-79.
-
(1959)
Mgmt. Sci.
, vol.6
, pp. 73-79
-
-
Charnes, A.1
Cooper, W.W.2
-
7
-
-
0023981046
-
The role of work-in-process inventory in a serial production line
-
CONWAY, R., W. MAXWELL, J. MCCLAIN AND J. THOMAS. 1988. The Role of Work-In-Process Inventory in a Serial Production Line. Opus. Res. 36, 229-241.
-
(1988)
Opus. Res.
, vol.36
, pp. 229-241
-
-
Conway, R.1
Maxwell, W.2
Mcclain, J.3
Thomas, J.4
-
8
-
-
85033033046
-
Stability of a linear control rule for a markov system
-
Department of Operations Research, Yale University, New Haven, Conn.
-
DENARDO, E. V., AND C. S. TANG. 1990. Stability of a Linear Control Rule for a Markov System. Working Paper, Department of Operations Research, Yale University, New Haven, Conn.
-
(1990)
Working Paper
-
-
Denardo, E.V.1
Tang, C.S.2
-
9
-
-
0001026422
-
Linear control of a markov system
-
DENARDO, E. V., AND C. S. TANG. 1992. Linear Control of a Markov System. Opns. Res. 40, 259-278.
-
(1992)
Opns. Res.
, vol.40
, pp. 259-278
-
-
Denardo, E.V.1
Tang, C.S.2
-
10
-
-
0023315347
-
An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
-
GERSHWIN, S. 1987. An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues With Finite Storage Space and Blocking. Opns. Res. 35, 291-305.
-
(1987)
Opns. Res.
, vol.35
, pp. 291-305
-
-
Gershwin, S.1
-
11
-
-
0020721475
-
Modelling and analysis of three stage transfer lines with unreliable machines and finite buffers
-
GERSHWIN, S., AND I. SCHICK. 1983. Modelling and Analysis of Three Stage Transfer Lines With Unreliable Machines and Finite Buffers. Opns. Res. 31, 354-380.
-
(1983)
Opns. Res.
, vol.31
, pp. 354-380
-
-
Gershwin, S.1
Schick, I.2
-
12
-
-
0019544056
-
Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers
-
GERSHWIN, S., AND O. BERMAN. 1981. Analysis of Transfer Lines Consisting of Two Unreliable Machines With Random Processing Times and Finite Storage Buffers. AIIE Trans. 13, 2-11.
-
(1981)
AIIE Trans.
, vol.13
, pp. 2-11
-
-
Gershwin, S.1
Berman, O.2
-
15
-
-
0022741221
-
A tactical planning model for a job shop
-
GRAVES, S. 1986. A Tactical Planning Model for a Job Shop. Opns. Res. 34, 522-533.
-
(1986)
Opns. Res.
, vol.34
, pp. 522-533
-
-
Graves, S.1
-
16
-
-
0022101189
-
Some Ways to increase flexibility in manufacturing systems
-
MURAMATSU, R., K. ISHII AND K. TAKAHASHI. 1985. Some Ways to Increase Flexibility in Manufacturing Systems. Int. J. Prod. Res. 23, 691-703.
-
(1985)
Int. J. Prod. Res.
, vol.23
, pp. 691-703
-
-
Muramatsu, R.1
Ishii, K.2
Takahashi, K.3
-
17
-
-
0025564738
-
Analysis of a kanban discipline for cell coordination in production lines, 1
-
MITRA, D., AND I. MITRANI. 1990. Analysis of a Kanban Discipline for Cell Coordination in Production Lines, 1. Mgmt. Sci. 36, 1548-1566.
-
(1990)
Mgmt. Sci.
, vol.36
, pp. 1548-1566
-
-
Mitra, D.1
Mitrani, I.2
-
18
-
-
0026223819
-
Analysis of a kanban discipline for cell coordination in production lines, 2: Stochastic demands
-
MITRA, D., AND I. MITRANI. 1991. Analysis of a Kanban Discipline for Cell Coordination in Production Lines, 2: Stochastic Demands. Opns. Res. 39, 807-823.
-
(1991)
Opns. Res.
, vol.39
, pp. 807-823
-
-
Mitra, D.1
Mitrani, I.2
-
19
-
-
0003449926
-
-
Industrial Engineering and Management Press, Norcross, Georgia
-
MONDEN, Y. 1983. Toyota Production System. Industrial Engineering and Management Press, Norcross, Georgia.
-
(1983)
Toyota Production System
-
-
Monden, Y.1
-
21
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
PORTEUS, E. L. 1986. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction. Opns. Res. 34, 137-144.
-
(1986)
Opns. Res.
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
24
-
-
0020826278
-
An algorithmic solution to two-Stage transfer lines With possible scrapping of units
-
SHANTHIKUMAR, J. C., AND C. C. TIEN. 1983. An Algorithmic Solution to Two-Stage Transfer Lines with Possible Scrapping of Units. Mgmt. Sci. 29, 1069-1086.
-
(1983)
Mgmt. Sci.
, vol.29
, pp. 1069-1086
-
-
Shanthikumar, J.C.1
Tien, C.C.2
-
26
-
-
0026859945
-
Push and pull systems: issues and comparisons
-
SPEARMAN, M. L., AND M. A. ZAZANIS. 1992. Push and Pull Systems: Issues and Comparisons. Opns. Res. 40, 521-532.
-
(1992)
Opns. Res.
, vol.40
, pp. 521-532
-
-
Spearman, M.L.1
Zazanis, M.A.2
-
27
-
-
0018986640
-
An analysis of production ordering quantities and inventory variations in multi-Stage production ordering systems
-
TABE, T., R. MURAMATSU AND Y. TANAKA. 1980. An Analysis of Production Ordering Quantities and Inventory Variations in Multi-Stage Production Ordering Systems. Int. J. Prod. Res. 27, 831-846.
-
(1980)
Int. J. Prod. Res.
, vol.27
, pp. 831-846
-
-
Tabe, T.1
Muramatsu, R.2
Tanaka, Y.3
-
28
-
-
0023365435
-
Feedback method of production ordering system in multi-Stage production and inventory systems
-
TAKAHASHI, K., R. MURAMATSU AND K. ISHII. 1987. Feedback Method of Production Ordering System in Multi-Stage Production and Inventory Systems. Int. J. Prod. Res. 25, 925-941.
-
(1987)
Int. J. Prod. Res.
, vol.25
, pp. 925-941
-
-
Takahashi, K.1
Muramatsu, R.2
Ishii, K.3
-
29
-
-
0025568624
-
The impact of uncertainty on a production line
-
TANG, C. S. 1990. The Impact of Uncertainty on a Production Line. Mgmt. Sci. 36, 1518-1531.
-
(1990)
Mgmt. Sci.
, vol.36
, pp. 1518-1531
-
-
Tang, C.S.1
-
30
-
-
0025510925
-
Scheduling networks of queues: heavy traffic analysis of A two-Station network with controllable inputs
-
WEIN, L. 1990. Scheduling Networks of Queues: Heavy Traffic Analysis of A Two-Station Network With Controllable Inputs. Opns. Res. 38, 1065-1078.
-
(1990)
Opns. Res.
, vol.38
, pp. 1065-1078
-
-
Wein, L.1
-
31
-
-
0020848139
-
The queueing network analyzer
-
WHITT, W. 1983a. The Queueing Network Analyzer. Bell Sys. Tech. J., 2779-2815.
-
(1983)
Bell Sys. Tech. J.
, pp. 2779-2815
-
-
Whitt, W.1
-
32
-
-
0020843490
-
Performance of the queueing network analyzer
-
WHITT, W. 1983b. Performance of the Queueing Network Analyzer. Bell Sys. Tech. J. 2817-2843.
-
(1983)
Bell Sys. Tech. J.
, pp. 2817-2843
-
-
Whitt, W.1
-
33
-
-
84989412809
-
Material requirements planning systems under uncertainty
-
WHYBARK, D. C., AND J. G. WILLIAMS. 1976. Material Requirements Planning Systems Under Uncertainty. Dec. Sci. 7, 595-606.
-
(1976)
Dec. Sci.
, vol.7
, pp. 595-606
-
-
Whybark, D.C.1
Williams, J.G.2
|