메뉴 건너뛰기




Volumn 44, Issue 2, 1996, Pages 382-392

Managing uncertainty in a serial production line

Author keywords

[No Author keywords available]

Indexed keywords

DECISION THEORY; MATHEMATICAL MODELS; NONLINEAR PROGRAMMING; OPERATIONS RESEARCH; PROCESS CONTROL; SCHEDULING; STATISTICAL METHODS; STOCHASTIC CONTROL SYSTEMS;

EID: 0030092557     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.44.2.382     Document Type: Article
Times cited : (22)

References (34)
  • 3
    • 17144397573 scopus 로고
    • Milford, Conn.
    • BUSINESS TECHNOLOGY MANAGEMENT INC. 1989. Flow Management Technology. Milford, Conn.
    • (1989) Flow Management Technology
  • 4
    • 0020087928 scopus 로고
    • 'Optimal' operating rules for automatic manufacturing systems
    • BUZACOTT, J. A. 1982. 'Optimal' Operating Rules for Automatic Manufacturing Systems. IEEE Trans. Autom. Control AC-27, 80-86.
    • (1982) IEEE Trans. Autom. Control , vol.AC-27 , pp. 80-86
    • Buzacott, J.A.1
  • 5
    • 84987012950 scopus 로고
    • A general approach for coordinating production in multiple-cell manufacturing systems
    • BUZACOTT, J. A., AND J. G. SHANTHIKUMAR. 1992. A General Approach for Coordinating Production in Multiple-Cell Manufacturing Systems. POMS 1, 34-52.
    • (1992) POMS , vol.1 , pp. 34-52
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 6
    • 0002395681 scopus 로고
    • Chance-Constrained programming
    • CHARNES, A., AND W. W. COOPER. 1959. Chance-Constrained Programming. Mgmt. Sci. 6, 73-79.
    • (1959) Mgmt. Sci. , vol.6 , pp. 73-79
    • Charnes, A.1    Cooper, W.W.2
  • 7
    • 0023981046 scopus 로고
    • The role of work-in-process inventory in a serial production line
    • CONWAY, R., W. MAXWELL, J. MCCLAIN AND J. THOMAS. 1988. The Role of Work-In-Process Inventory in a Serial Production Line. Opus. Res. 36, 229-241.
    • (1988) Opus. Res. , vol.36 , pp. 229-241
    • Conway, R.1    Maxwell, W.2    Mcclain, J.3    Thomas, J.4
  • 8
    • 85033033046 scopus 로고
    • Stability of a linear control rule for a markov system
    • Department of Operations Research, Yale University, New Haven, Conn.
    • DENARDO, E. V., AND C. S. TANG. 1990. Stability of a Linear Control Rule for a Markov System. Working Paper, Department of Operations Research, Yale University, New Haven, Conn.
    • (1990) Working Paper
    • Denardo, E.V.1    Tang, C.S.2
  • 9
    • 0001026422 scopus 로고
    • Linear control of a markov system
    • DENARDO, E. V., AND C. S. TANG. 1992. Linear Control of a Markov System. Opns. Res. 40, 259-278.
    • (1992) Opns. Res. , vol.40 , pp. 259-278
    • Denardo, E.V.1    Tang, C.S.2
  • 10
    • 0023315347 scopus 로고
    • An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
    • GERSHWIN, S. 1987. An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues With Finite Storage Space and Blocking. Opns. Res. 35, 291-305.
    • (1987) Opns. Res. , vol.35 , pp. 291-305
    • Gershwin, S.1
  • 11
    • 0020721475 scopus 로고
    • Modelling and analysis of three stage transfer lines with unreliable machines and finite buffers
    • GERSHWIN, S., AND I. SCHICK. 1983. Modelling and Analysis of Three Stage Transfer Lines With Unreliable Machines and Finite Buffers. Opns. Res. 31, 354-380.
    • (1983) Opns. Res. , vol.31 , pp. 354-380
    • Gershwin, S.1    Schick, I.2
  • 12
    • 0019544056 scopus 로고
    • Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers
    • GERSHWIN, S., AND O. BERMAN. 1981. Analysis of Transfer Lines Consisting of Two Unreliable Machines With Random Processing Times and Finite Storage Buffers. AIIE Trans. 13, 2-11.
    • (1981) AIIE Trans. , vol.13 , pp. 2-11
    • Gershwin, S.1    Berman, O.2
  • 15
    • 0022741221 scopus 로고
    • A tactical planning model for a job shop
    • GRAVES, S. 1986. A Tactical Planning Model for a Job Shop. Opns. Res. 34, 522-533.
    • (1986) Opns. Res. , vol.34 , pp. 522-533
    • Graves, S.1
  • 16
    • 0022101189 scopus 로고
    • Some Ways to increase flexibility in manufacturing systems
    • MURAMATSU, R., K. ISHII AND K. TAKAHASHI. 1985. Some Ways to Increase Flexibility in Manufacturing Systems. Int. J. Prod. Res. 23, 691-703.
    • (1985) Int. J. Prod. Res. , vol.23 , pp. 691-703
    • Muramatsu, R.1    Ishii, K.2    Takahashi, K.3
  • 17
    • 0025564738 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines, 1
    • MITRA, D., AND I. MITRANI. 1990. Analysis of a Kanban Discipline for Cell Coordination in Production Lines, 1. Mgmt. Sci. 36, 1548-1566.
    • (1990) Mgmt. Sci. , vol.36 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 18
    • 0026223819 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines, 2: Stochastic demands
    • MITRA, D., AND I. MITRANI. 1991. Analysis of a Kanban Discipline for Cell Coordination in Production Lines, 2: Stochastic Demands. Opns. Res. 39, 807-823.
    • (1991) Opns. Res. , vol.39 , pp. 807-823
    • Mitra, D.1    Mitrani, I.2
  • 19
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Norcross, Georgia
    • MONDEN, Y. 1983. Toyota Production System. Industrial Engineering and Management Press, Norcross, Georgia.
    • (1983) Toyota Production System
    • Monden, Y.1
  • 21
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • PORTEUS, E. L. 1986. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction. Opns. Res. 34, 137-144.
    • (1986) Opns. Res. , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 24
    • 0020826278 scopus 로고
    • An algorithmic solution to two-Stage transfer lines With possible scrapping of units
    • SHANTHIKUMAR, J. C., AND C. C. TIEN. 1983. An Algorithmic Solution to Two-Stage Transfer Lines with Possible Scrapping of Units. Mgmt. Sci. 29, 1069-1086.
    • (1983) Mgmt. Sci. , vol.29 , pp. 1069-1086
    • Shanthikumar, J.C.1    Tien, C.C.2
  • 26
    • 0026859945 scopus 로고
    • Push and pull systems: issues and comparisons
    • SPEARMAN, M. L., AND M. A. ZAZANIS. 1992. Push and Pull Systems: Issues and Comparisons. Opns. Res. 40, 521-532.
    • (1992) Opns. Res. , vol.40 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 27
    • 0018986640 scopus 로고
    • An analysis of production ordering quantities and inventory variations in multi-Stage production ordering systems
    • TABE, T., R. MURAMATSU AND Y. TANAKA. 1980. An Analysis of Production Ordering Quantities and Inventory Variations in Multi-Stage Production Ordering Systems. Int. J. Prod. Res. 27, 831-846.
    • (1980) Int. J. Prod. Res. , vol.27 , pp. 831-846
    • Tabe, T.1    Muramatsu, R.2    Tanaka, Y.3
  • 28
    • 0023365435 scopus 로고
    • Feedback method of production ordering system in multi-Stage production and inventory systems
    • TAKAHASHI, K., R. MURAMATSU AND K. ISHII. 1987. Feedback Method of Production Ordering System in Multi-Stage Production and Inventory Systems. Int. J. Prod. Res. 25, 925-941.
    • (1987) Int. J. Prod. Res. , vol.25 , pp. 925-941
    • Takahashi, K.1    Muramatsu, R.2    Ishii, K.3
  • 29
    • 0025568624 scopus 로고
    • The impact of uncertainty on a production line
    • TANG, C. S. 1990. The Impact of Uncertainty on a Production Line. Mgmt. Sci. 36, 1518-1531.
    • (1990) Mgmt. Sci. , vol.36 , pp. 1518-1531
    • Tang, C.S.1
  • 30
    • 0025510925 scopus 로고
    • Scheduling networks of queues: heavy traffic analysis of A two-Station network with controllable inputs
    • WEIN, L. 1990. Scheduling Networks of Queues: Heavy Traffic Analysis of A Two-Station Network With Controllable Inputs. Opns. Res. 38, 1065-1078.
    • (1990) Opns. Res. , vol.38 , pp. 1065-1078
    • Wein, L.1
  • 31
    • 0020848139 scopus 로고
    • The queueing network analyzer
    • WHITT, W. 1983a. The Queueing Network Analyzer. Bell Sys. Tech. J., 2779-2815.
    • (1983) Bell Sys. Tech. J. , pp. 2779-2815
    • Whitt, W.1
  • 32
    • 0020843490 scopus 로고
    • Performance of the queueing network analyzer
    • WHITT, W. 1983b. Performance of the Queueing Network Analyzer. Bell Sys. Tech. J. 2817-2843.
    • (1983) Bell Sys. Tech. J. , pp. 2817-2843
    • Whitt, W.1
  • 33
    • 84989412809 scopus 로고
    • Material requirements planning systems under uncertainty
    • WHYBARK, D. C., AND J. G. WILLIAMS. 1976. Material Requirements Planning Systems Under Uncertainty. Dec. Sci. 7, 595-606.
    • (1976) Dec. Sci. , vol.7 , pp. 595-606
    • Whybark, D.C.1    Williams, J.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.