-
1
-
-
0141853762
-
-
U.S. Army Corps of Engineers, Hydraulic Engineering Center, Davis, Calif.
-
"Accuracy of Computed Water Surface Profiles." (1986). U.S. Army Corps of Engineers, Hydraulic Engineering Center, Davis, Calif.
-
(1986)
Accuracy of Computed Water Surface Profiles
-
-
-
2
-
-
0003799788
-
-
John Wiley and Sons, Inc., New York, N.Y.
-
Ang, A. H., and Tang, W. H. (1984). Probability concepts in engineering planning and design, volume II - decision, risk, and reliability. John Wiley and Sons, Inc., New York, N.Y.
-
(1984)
Probability Concepts in Engineering Planning and Design, Volume II - Decision, Risk, and Reliability
, vol.2
-
-
Ang, A.H.1
Tang, W.H.2
-
3
-
-
0027059451
-
Reliability theory applied to sediment transport formulae
-
Taipei, Republic of China
-
Bechteler, W., and Maurer, M. (1992). "Reliability theory applied to sediment transport formulae." Proc., 6th IAHR International Symposium on Stochastic Hydraulics, Taipei, Republic of China, 115-122.
-
(1992)
Proc., 6th IAHR International Symposium on Stochastic Hydraulics
, pp. 115-122
-
-
Bechteler, W.1
Maurer, M.2
-
4
-
-
0026111053
-
First-order analysis of open-channel flow
-
ASCE
-
Cesare, M. A. (1991). "First-order analysis of open-channel flow." J. Hydr. Engrg., ASCE, 117(2), 242-247.
-
(1991)
J. Hydr. Engrg.
, vol.117
, Issue.2
, pp. 242-247
-
-
Cesare, M.A.1
-
5
-
-
0003421415
-
-
Soc. for Int. and Appl. Mathematics, Philadelphia, Pa.
-
Efron, B. (1982). The Jackknife, the Bootstrap, and Other Resampling Plans. Soc. for Int. and Appl. Mathematics, Philadelphia, Pa.
-
(1982)
The Jackknife, the Bootstrap, and Other Resampling Plans
-
-
Efron, B.1
-
6
-
-
0026931120
-
Reliability-based pier scour engineering
-
ASCE
-
Johnson, P. A. (1992). "Reliability-based pier scour engineering." J. Hydr. Engrg., ASCE, 118(10), 1344-1358.
-
(1992)
J. Hydr. Engrg.
, vol.118
, Issue.10
, pp. 1344-1358
-
-
Johnson, P.A.1
-
7
-
-
0026878595
-
Assessment of time-variant bridge reliability due to pier scour
-
ASCE
-
Johnson, P. A., and Ayyub, B. M. (1992). "Assessment of time-variant bridge reliability due to pier scour." J. Hydr. Engrg., ASCE, 118(6), 887-903.
-
(1992)
J. Hydr. Engrg.
, vol.118
, Issue.6
, pp. 887-903
-
-
Johnson, P.A.1
Ayyub, B.M.2
-
8
-
-
0022929091
-
Hydraulic uncertainties in flood levee capacity
-
ASCE
-
Lee, H. L., and Mays, L. W. (1986). "Hydraulic uncertainties in flood levee capacity." J. Hydr. Engrg., ASCE, 112(10), 928-934.
-
(1986)
J. Hydr. Engrg.
, vol.112
, Issue.10
, pp. 928-934
-
-
Lee, H.L.1
Mays, L.W.2
-
9
-
-
0003756801
-
-
McGraw-Hill Book Co., Inc., New York, N.Y.
-
Mays, L. W., and Tung, Y. K. (1992). Hydrosystems engineering and management. McGraw-Hill Book Co., Inc., New York, N.Y.
-
(1992)
Hydrosystems Engineering and Management
-
-
Mays, L.W.1
Tung, Y.K.2
-
10
-
-
0025428885
-
Mellin transform applied to uncertainty analysis in hydrology/hydraulics
-
ASCE
-
Tung, Y. K. (1990). "Mellin transform applied to uncertainty analysis in hydrology/hydraulics." J. Hydr. Engrg., ASCE, 116(5), 659-674.
-
(1990)
J. Hydr. Engrg.
, vol.116
, Issue.5
, pp. 659-674
-
-
Tung, Y.K.1
-
11
-
-
0027837583
-
Analyzing uncertainty of IUH of Nash
-
ASCE, New York, N.Y.
-
Yang, J. C., Tarng, S. Y., and Tung, Y. K. (1993). "Analyzing uncertainty of IUH of Nash." Proc., 1993 ASCE Conf. of Hydr. Engrg., ASCE, New York, N.Y., 1927-1932.
-
(1993)
Proc., 1993 ASCE Conf. of Hydr. Engrg.
, pp. 1927-1932
-
-
Yang, J.C.1
Tarng, S.Y.2
Tung, Y.K.3
-
12
-
-
0027544766
-
Uncertainty and sensitivity analyses of pit-migration model
-
ASCE
-
Yeh, K. C., and Tung, Y. K. (1993). "Uncertainty and sensitivity analyses of pit-migration model." J. Hydr. Engrg., ASCE, 119(2), 262-283.
-
(1993)
J. Hydr. Engrg.
, vol.119
, Issue.2
, pp. 262-283
-
-
Yeh, K.C.1
Tung, Y.K.2
|