메뉴 건너뛰기




Volumn 28, Issue 2, 1996, Pages 129-139

A scheduling problem in glass manufacturing

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; GLASS CUTTING MACHINES; JUST IN TIME PRODUCTION; PRODUCTION ENGINEERING; SIMULATION; TIME MEASUREMENT;

EID: 0030081179     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408179608966258     Document Type: Article
Times cited : (47)

References (12)
  • 1
    • 0026904034 scopus 로고
    • Production planning knowledge-based system for pharmaceutical manufacturing lines
    • Artiba, A., and Tahon, C., (1993) Production planning knowledge-based system for pharmaceutical manufacturing lines. European Journal of Operational Research, 61 (2), 18–29.
    • (1993) European Journal of Operational Research , vol.61 , Issue.2 , pp. 18-29
    • Artiba, A.1    Tahon, C.2
  • 2
    • 0001923235 scopus 로고
    • An application of bin-packing to multi-processor scheduling
    • Coffman, E.G., Garey, M., and Johnson, D., (1978) An application of bin-packing to multi-processor scheduling. SIAM Journal of Computing, 7 (1), 1–16.
    • (1978) SIAM Journal of Computing , vol.7 , Issue.1 , pp. 1-16
    • Coffman, E.G.1    Garey, M.2    Johnson, D.3
  • 3
    • 0016970708 scopus 로고
    • Optimal flowshop schedules with no intermediate storage space
    • Gupta, J.N.D., (1976) Optimal flowshop schedules with no intermediate storage space. Naval Research Logistics Quarterly, 23 (2), 235–243.
    • (1976) Naval Research Logistics Quarterly , vol.23 , Issue.2 , pp. 235-243
    • Gupta, J.N.D.1
  • 5
    • 0018491694 scopus 로고
    • Flowshop scheduling problems with no in-process waiting a special case
    • Panwalkar, S.S., and Woollam, C.R., (1979) Flowshop scheduling problems with no in-process waiting a special case. Journal of Operational Research Society, 30 (7), 661–664.
    • (1979) Journal of Operational Research Society , vol.30 , Issue.7 , pp. 661-664
    • Panwalkar, S.S.1    Woollam, C.R.2
  • 6
    • 0026256602 scopus 로고
    • Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods
    • Pekny, J.F., and Miller, D.L., (1991) Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods. Computers and Chemical Engineering, 15 (11), 741–748.
    • (1991) Computers and Chemical Engineering , vol.15 , Issue.11 , pp. 741-748
    • Pekny, J.F.1    Miller, D.L.2
  • 7
  • 9
    • 0025413493 scopus 로고
    • Some heuristics for scheduling jobs on parallel machines with setups
    • So, K.C., (1990) Some heuristics for scheduling jobs on parallel machines with setups. Management Science, 36 (4), 467–475.
    • (1990) Management Science , vol.36 , Issue.2 , pp. 467-475
    • So, K.C.1
  • 10
    • 0025699778 scopus 로고
    • Scheduling batches on parallel machines with major and minor setups
    • Tang, C.S., (1990) Scheduling batches on parallel machines with major and minor setups. European Journal of Operational Research, 46 (1), 28–37.
    • (1990) European Journal of Operational Research , vol.46 , Issue.1 , pp. 28-37
    • Tang, C.S.1
  • 11
    • 0026260752 scopus 로고
    • Solvable cases of the no-wait flow-shop scheduling problem
    • Van Der Veen, J.A.A., Van Dal, R., (1991) Solvable cases of the no-wait flow-shop scheduling problem. Journal of Operational Research Society, 42 (11), 971–980.
    • (1991) Journal of Operational Research Society , vol.42 , Issue.11 , pp. 971-980
    • Van Der Veen, J.A.A.1    Dal, R.2
  • 12
    • 0000153186 scopus 로고
    • Solutions of the flowshop scheduling problem with no intermediate queues
    • Wismer, D.A., (1972) Solutions of the flowshop scheduling problem with no intermediate queues. Operations Research, 20 (3), 689–697.
    • (1972) Operations Research , vol.20 , Issue.3 , pp. 689-697
    • Wismer, D.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.