메뉴 건너뛰기




Volumn 47, Issue 2, 1996, Pages 315-320

Single machine group scheduling with two ordered criteria

Author keywords

Bicriterion scheduling; Single machine group scheduling

Indexed keywords

ALGORITHMS; COST EFFECTIVENESS; OPTIMIZATION; POLYNOMIALS; PROBLEM SOLVING;

EID: 0030081117     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/jors.1996.27     Document Type: Article
Times cited : (17)

References (17)
  • 2
  • 3
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • C. N. Potts and L. N. Van Wassenhove (1992) Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. J. Opl Res. Soc. 43, 395-406.
    • (1992) J. Opl Res. Soc. , vol.43 , pp. 395-406
    • Potts, C.N.1    Wassenhove, L.N.V.2
  • 4
    • 0346298218 scopus 로고
    • A study of production scheduling: Optimization of group scheduling on a single production stage
    • T. Yoshida, N. Nakamura and K. Hitomi (1973) A study of production scheduling: optimization of group scheduling on a single production stage. Trans. Japanese Soc. Mech. Eng. 39,1993-2003.
    • (1973) Trans. Japanese Soc. Mech. Eng. , vol.39 , pp. 1993-2003
    • Yoshida, T.1    Nakamura, N.2    Hitomi, K.3
  • 5
    • 0018520161 scopus 로고
    • Optimal two-stage production scheduling with setup times separated
    • T. Yoshida and K. Hitomi (1978) Optimal two-stage production scheduling with setup times separated. AIIE Trans. 11,261-263.
    • (1978) AIIE Trans. , vol.11 , pp. 261-263
    • Yoshida, T.1    Hitomi, K.2
  • 6
    • 84960650840 scopus 로고
    • Group production scheduling for minimum total tardiness: Part I
    • N. Nakamura, T. Yoshida and K. Hitomi (1978) Group production scheduling for minimum total tardiness: Part I. AIIE Trans. 10,157-162.
    • (1978) AIIE Trans. , vol.10 , pp. 157-162
    • Nakamura, N.1    Yoshida, T.2    Hitomi, K.3
  • 8
    • 0021877888 scopus 로고
    • Job scheduling in group technology environment for a single facility
    • M. Ozden, P. Egbelu and A. Iyer (1985) Job scheduling in group technology environment for a single facility. Computers Ind. Engng. 9, 61-12.
    • (1985) Computers Ind. Engng. , vol.9 , pp. 12-61
    • Ozden, M.1    Egbelu, P.2    Iyer, A.3
  • 9
    • 0025256245 scopus 로고
    • Scheduling groups of jobs in the two-machine flow shop
    • K. R. Baker (1990) Scheduling groups of jobs in the two-machine flow shop. Mathematical and Computer Modelling 13,29-36.
    • (1990) Mathematical and Computer Modelling , vol.13 , pp. 29-36
    • Baker, K.R.1
  • 12
    • 84984715541 scopus 로고
    • Single-Machine Bicriteria Scheduling, CWI, Amsterdam
    • J. A. Hoogeveen (1992) Single-Machine Bicriteria Scheduling. Doctoral Thesis, CWI, Amsterdam.
    • (1992) Doctoral Thesis
    • Hoogeveen, J.A.1
  • 13
    • 0001253255 scopus 로고
    • Optimal sequencing of a single machine subject to precedence constraints
    • E. L. Lawler (1973) Optimal sequencing of a single machine subject to precedence constraints. Mgmt Sci. 19, 544-546.
    • (1973) Mgmt Sci. , vol.19 , pp. 544-546
    • Lawler, E.L.1
  • 14
    • 0002066821 scopus 로고
    • Various optimizers for single-stage production
    • W. E. Smith (1956) Various optimizers for single-stage production. Naval Res. Logist. Q. 3, 59-66.
    • (1956) Naval Res. Logist. Q. , vol.3 , pp. 59-66
    • Smith, W.E.1
  • 15
    • 77951587888 scopus 로고
    • Sequencing to minimize total weighted completion time subject to precedence constraints
    • E. L. Lawler (1978) Sequencing to minimize total weighted completion time subject to precedence constraints. Annals of Discrete Mathematics 2, 75-90.
    • (1978) Annals of Discrete Mathematics , vol.2 , pp. 75-90
    • Lawler, E.L.1
  • 16
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • R. L. Graham, E. L. Lawler, J. K. Lenstra and A. H. G. Rinnooy Kan (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics 5,287-326.
    • (1979) Annals of Discrete Mathematics , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Kan, A.H.G.R.4
  • 17
    • 0020720389 scopus 로고
    • Preemptive scheduling of a single machine to minimize maximum cost subject to release dates and precedence constraints
    • K. R. Baker, E. L. Lawler, J. K. Lenstra and A. H. G. Rinnooy Kan (1983) Preemptive scheduling of a single machine to minimize maximum cost subject to release dates and precedence constraints. Opns Res. 31, 381-386.
    • (1983) Opns Res. , vol.31 , pp. 381-386
    • Baker, K.R.1    Lawler, E.L.2    Lenstra, J.K.3    Kan, A.H.G.R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.