메뉴 건너뛰기




Volumn 8, Issue 3, 1996, Pages 54-60

Engineering for conformance

Author keywords

[No Author keywords available]

Indexed keywords

COSTS; MANUFACTURE; PRODUCT DESIGN; PRODUCTION; QUALITY CONTROL; PROBLEM SOLVING; PROCESS CONTROL; SOCIETIES AND INSTITUTIONS;

EID: 0029771874     PISSN: 0954478X     EISSN: None     Source Type: Journal    
DOI: 10.1108/09544789610118485     Document Type: Article
Times cited : (5)

References (9)
  • 2
    • 85033026876 scopus 로고    scopus 로고
    • DTI Translation 0219-92, Federal Ministry of Research and Technology, Germany
    • Quality Assurance Programme 1992-1996, (DTI Translation 0219-92), Federal Ministry of Research and Technology, Germany.
    • Quality Assurance Programme 1992-1996
  • 7
    • 85033025931 scopus 로고    scopus 로고
    • note
    • m is around three or above, the characteristic is unlikely to be in control.
  • 8
    • 85032999438 scopus 로고    scopus 로고
    • note
    • pk= 1 the defect rate equates to 1,300ppm.
  • 9
    • 85033031228 scopus 로고    scopus 로고
    • note
    • Isocosts in the non-safety critical region come from a sample of businesses and assume levels of cost at internal failure, returns from customer inspection or test and warranty returns. The costs in the safety critical region (S > 5) are based on allowances for failure investigations, legal actions and product recall, but do not include elements for loss of current or future business.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.