메뉴 건너뛰기




Volumn 7, Issue 1, 1996, Pages 22-26

A statistical analysis of yield loss in material requirements planning systems

Author keywords

MRP; Multi stage scheduling; Yield loss

Indexed keywords

PRODUCTION CONTROL; SCHEDULING; STATISTICAL METHODS; STRATEGIC PLANNING; SYSTEMS ANALYSIS;

EID: 0029753158     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537289608930321     Document Type: Article
Times cited : (5)

References (28)
  • 1
    • 0017468319 scopus 로고
    • Optimal reject allowance with constant marginal production efficiency
    • Beja, A., 1977, Optimal reject allowance with constant marginal production efficiency. Naval Research Logistics Quarterly, 24, 21-33.
    • (1977) Naval Research Logistics Quarterly , vol.24 , pp. 21-33
    • Beja, A.1
  • 3
    • 1642445814 scopus 로고
    • Computing optimal shrinkage allowance for small order sizes
    • Goode, H. P., and Saltzman, S., 1961, Computing optimal shrinkage allowance for small order sizes. Journal of Industrial Engineering, 12, 57-61.
    • (1961) Journal of Industrial Engineering , vol.12 , pp. 57-61
    • Goode, H.P.1    Saltzman, S.2
  • 4
    • 1642445820 scopus 로고
    • On the determination of optimal shrinkage allowance in a job shop
    • Gregory, W. R., and Beged-Dov, A., 1967, On the determination of optimal shrinkage allowance in a job shop. Journal of Industrial Engineering, 18, 284-288.
    • (1967) Journal of Industrial Engineering , vol.18 , pp. 284-288
    • Gregory, W.R.1    Beged-Dov, A.2
  • 5
    • 0005913019 scopus 로고
    • A single bottleneck system with binomial yields and rigid demand
    • Groskeld-Nir, A., and Ronen, B., 1993, A single bottleneck system with binomial yields and rigid demand. Management Science, 39, 650-653.
    • (1993) Management Science , vol.39 , pp. 650-653
    • Groskeld-Nir, A.1    Ronen, B.2
  • 6
    • 0028419454 scopus 로고
    • Lead time uncertainty with back-ordering in multi-level product structures
    • Gupta, S. M., and Brennan, L., 1994, Lead time uncertainty with back-ordering in multi-level product structures. Computers and Industrial Engineering, 26, 267-278.
    • (1994) Computers and Industrial Engineering , vol.26 , pp. 267-278
    • Gupta, S.M.1    Brennan, L.2
  • 10
    • 1642568456 scopus 로고
    • Planning for MRP lot sizes when there is scrap loss
    • B. Hartman andj. Ringuest (eds), Las Vegas
    • Kurtulus, I. S., and Pentico, D. VV, 1985, Planning for MRP lot sizes when there is scrap loss. In B. Hartman andj. Ringuest (eds) National AIDS Proceedings, Las Vegas, 863-865.
    • (1985) National AIDS Proceedings , pp. 863-865
    • Kurtulus, I.S.1    Pentico, D.2
  • 12
    • 0023979032 scopus 로고
    • Production control in multi-stage systems with variable yield losses
    • Lee, H. L., and Yano, C. A., 1988, Production control in multi-stage systems with variable yield losses. Operations Research, 36, 269-278.
    • (1988) Operations Research , vol.36 , pp. 269-278
    • Lee, H.L.1    Yano, C.A.2
  • 13
    • 0005536597 scopus 로고
    • The opdmal reject allowance problem
    • Levitan, R. E., 1960, The opdmal reject allowance problem. Management Science, 6, 172-186.
    • (1960) Management Science , vol.6 , pp. 172-186
    • Levitan, R.E.1
  • 14
    • 8444227107 scopus 로고
    • The effects of workforce strategies on manufacturing operations
    • Mangiameli, P. M., and Krajewski, L. T., 1983, The effects of workforce strategies on manufacturing operations. Journal of Operations Management, 3, 183-196.
    • (1983) Journal of Operations Management , vol.3 , pp. 183-196
    • Mangiameli, P.M.1    Krajewski, L.T.2
  • 16
    • 0016841636 scopus 로고
    • Safety stock for requirements planning
    • New, C., 1975, Safety stock for requirements planning. Production and Inventory Management, 16, 1-18.
    • (1975) Production and Inventory Management , vol.16 , pp. 1-18
    • New, C.1
  • 20
    • 0024130918 scopus 로고
    • An evaluation and proposed modification of the Sepehri-Silver-New Heuristic for multiple lot sizing under variable yield
    • Pentico, W. D., 1988, An evaluation and proposed modification of the Sepehri-Silver-New Heuristic for multiple lot sizing under variable yield. IEE Transactions, 20, 360-363.
    • (1988) IEE Transactions , vol.20 , pp. 360-363
    • Pentico, W.D.1
  • 21
    • 84870493847 scopus 로고
    • SAS Institute, Raleigh
    • SAS Institute Inc., 1992, SAS User’s Guide (SAS Institute, Raleigh).
    • (1992) SAS User’s Guide
  • 22
    • 0022681090 scopus 로고
    • A heuristic for multiple lot sizing for an order under variable yield
    • Sepehri, M., Silver, E., and New, C., 1986, A heuristic for multiple lot sizing for an order under variable yield. IEE Transactions, 18, 63-69.
    • (1986) IEE Transactions , vol.18 , pp. 63-69
    • Sepehri, M.1    Silver, E.2    New, C.3
  • 23
    • 85011466143 scopus 로고
    • W. E. Goddard (ed.) Master Production Reprints, APICS, Washington, D.C
    • Steele, D. C., 1977, The nervous MRP systems: how to battle. In W. E. Goddard (ed.) Master Production Reprints, APICS, Washington, D.C., 176-181.
    • (1977) The Nervous MRP Systems: How to Battle , pp. 176-181
    • Steele, D.C.1
  • 24
    • 0025568624 scopus 로고
    • The impact of uncertainty on a production line
    • Tang, C. S., 1990, The impact of uncertainty on a production line. Management Science, 36, 1518-1531.
    • (1990) Management Science , vol.36 , pp. 1518-1531
    • Tang, C.S.1
  • 25
    • 4043057858 scopus 로고
    • The reject allowance problem: An analysis and application to job lot production
    • Wadsworth, H. M., and Chanc, S. H., 1964, The reject allowance problem: an analysis and application to job lot production. Journal of Industrial Engineering, 15, 711-715.
    • (1964) Journal of Industrial Engineering , vol.15 , pp. 711-715
    • Wadsworth, H.M.1    Chanc, S.H.2
  • 26
    • 0001068236 scopus 로고
    • Random yield, rework and scrap in a multi-stage batch manufacturing environment
    • Wein, A. S., 1992, Random yield, rework and scrap in a multi-stage batch manufacturing environment. Operations Research, 40, 551-563.
    • (1992) Operations Research , vol.40 , pp. 551-563
    • Wein, A.S.1
  • 27
    • 0037943470 scopus 로고
    • Assemble-to-order manufacturing: Implications for materials management
    • Wemmerlow, U., 1984, Assemble-to-order manufacturing: implications for materials management. Joumal of Operations Management, 4, 347-368.
    • (1984) Joumal of Operations Management , vol.4 , pp. 347-368
    • Wemmerlow, U.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.