-
1
-
-
0022773596
-
Issues in using robots for electronics assembly
-
Schroer, B.J. and Stafford, E.F., "Issues in using robots for electronics assembly", Robotica, Vol. 2, 1986, pp. 225-35.
-
(1986)
Robotica
, vol.2
, pp. 225-235
-
-
Schroer, B.J.1
Stafford, E.F.2
-
2
-
-
0028101641
-
Machine setup and component placement in printed circuit board assembly
-
Bard, J.F., Clayton, R.W. and Feo, T.A., "Machine setup and component placement in printed circuit board assembly", The International Journal of Flexible Manufacturing Systems, Vol. 6, 1994, pp. 5-31.
-
(1994)
The International Journal of Flexible Manufacturing Systems
, vol.6
, pp. 5-31
-
-
Bard, J.F.1
Clayton, R.W.2
Feo, T.A.3
-
3
-
-
0022059122
-
An integer programming application to solve sequencer mix problems in printed circuit board production
-
Randhawa, S.U., McDonwell, E.D. and Farupui, S., "An integer programming application to solve sequencer mix problems in printed circuit board production", International Journal of Production Research, Vol. 23, 1985, pp. 543-52.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 543-552
-
-
Randhawa, S.U.1
McDonwell, E.D.2
Farupui, S.3
-
4
-
-
0022812078
-
A LISP-based heuristic scheduler for automatic insertion in electronics assembly
-
Cunningham, P. and Browne, J., "A LISP-based heuristic scheduler for automatic insertion in electronics assembly", International Journal of Production Research, Vol. 24, 1986, pp. 1395-408.
-
(1986)
International Journal of Production Research
, vol.24
, pp. 1395-1408
-
-
Cunningham, P.1
Browne, J.2
-
5
-
-
0001180180
-
A heuristic approach to solving traveling salesman problems
-
Karg, R. and Thompson, G.L., "A heuristic approach to solving traveling salesman problems", Management Science, Vol. 10, 1964.
-
(1964)
Management Science
, vol.10
-
-
Karg, R.1
Thompson, G.L.2
-
6
-
-
0023981635
-
Sequencing of insertions in printed circuit board assembly
-
Ball, M.O. and Magazine, M. J., "Sequencing of insertions in printed circuit board assembly", Operations Research, Vol. 36, 1988, pp. 192-201.
-
(1988)
Operations Research
, vol.36
, pp. 192-201
-
-
Ball, M.O.1
Magazine, M.J.2
-
7
-
-
0004570334
-
Printed circuit boards assembly automation formulations and algorithms
-
Ohio, 17-20 August
-
Gavish, B. and Seidmann, A., "Printed circuit boards assembly automation formulations and algorithms", Proceedings of the IXth ICPR, Ohio, 17-20 August, 1987, pp. 662-72.
-
(1987)
Proceedings of the IXth ICPR
, pp. 662-672
-
-
Gavish, B.1
Seidmann, A.2
-
8
-
-
8644288643
-
-
Report No. IM84J05, Department of Industrial Management, Chung-Hua Polytechnic Institute, Hsinchu, Taiwan
-
Wang, C., Fu, H.-P., Ho, L.-H. and Su, Y.-C., "A magazine assignment heuristic for robotic assembly using the dynamic pck-and-place approach", Report No. IM84J05, Department of Industrial Management, Chung-Hua Polytechnic Institute, Hsinchu, Taiwan, 1995.
-
(1995)
A Magazine Assignment Heuristic for Robotic Assembly Using the Dynamic Pck-and-place Approach
-
-
Wang, C.1
Fu, H.-P.2
Ho, L.-H.3
Su, Y.-C.4
-
9
-
-
0021489573
-
An algorithm for NC turret punch press tool location and hit sequencing
-
Walas, R.A. and Askin, R.G., "An algorithm for NC turret punch press tool location and hit sequencing", IIE Transactions, Vol. 16, 1984, pp. 280-7.
-
(1984)
IIE Transactions
, vol.16
, pp. 280-287
-
-
Walas, R.A.1
Askin, R.G.2
-
10
-
-
0000357529
-
Alternative approaches to sequencing robot moves for PCB assembly
-
Mettalla, E.G. and Egbelu, P.J., "Alternative approaches to sequencing robot moves for PCB assembly", International Journal of Computer Integrated Manufacturing, Vol. 2, 1989, pp. 243-56.
-
(1989)
International Journal of Computer Integrated Manufacturing
, vol.2
, pp. 243-256
-
-
Mettalla, E.G.1
Egbelu, P.J.2
-
11
-
-
0030104205
-
Robotic assembly of printed circuit boards with component feeder location consideration
-
Egbelu, P. J., Wu, C.-T. and Pilgaonhar, R., "Robotic assembly of printed circuit boards with component feeder location consideration", Production Planning and Control, Vol. 7 No. 2, 1995, pp. 162-75.
-
(1995)
Production Planning and Control
, vol.7
, Issue.2
, pp. 162-175
-
-
Egbelu, P.J.1
Wu, C.-T.2
Pilgaonhar, R.3
-
12
-
-
0000311185
-
A dynamic points specification approach to sequencing robot moves for PCB assembly
-
Su, Y-C., Wang, C., Egbelu, P.J. and Cannon, J.D., "A dynamic points specification approach to sequencing robot moves for PCB assembly", International Journal of Computer Integrated Manufacturing, Vol. 8 No. 6, 1995, pp. 448-56.
-
(1995)
International Journal of Computer Integrated Manufacturing
, vol.8
, Issue.6
, pp. 448-456
-
-
Su, Y.-C.1
Wang, C.2
Egbelu, P.J.3
Cannon, J.D.4
|