메뉴 건너뛰기




Volumn 34, Issue 1, 1996, Pages 209-225

Machine scheduling models in environmentally focused chemical manufacturing

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CHEMICAL FINISHING; CHEMICAL PLANTS; INDUSTRIAL WASTES; MATHEMATICAL MODELS; MIXERS (MACHINERY); RANDOM NUMBER GENERATION;

EID: 0029734544     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608904898     Document Type: Article
Times cited : (3)

References (26)
  • 3
    • 0017471858 scopus 로고
    • An improved algorithm for scheduling jobs on identical machines
    • Barnes, J. W., and Brennan, J., 1977, An improved algorithm for scheduling jobs on identical machines. AllE Transactions, 9 (1), 134-143.
    • (1977) Alle Transactions , vol.9 , Issue.1 , pp. 134-143
    • Barnes, J.W.1    Brennan, J.2
  • 4
    • 0027562546 scopus 로고
    • Solving the multiple-machine weighted flow time problem using tabu search
    • Barnes, J. W., and Laguna, M., 1993, Solving the multiple-machine weighted flow time problem using tabu search. IIE Transactions, 25 (2), 121-128.
    • (1993) IIE Transactions , vol.25 , Issue.2 , pp. 121-128
    • Barnes, J.W.1    Laguna, M.2
  • 5
    • 0020013653 scopus 로고
    • A state-of-the an survey of dispatching rules for manufacturing job shop operations
    • BlackSTOne, J. H., Phillips, D. T., and Hogg, G. L., 1982, A state-of-the an survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20 (1), 27-45.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 9
    • 0018678342 scopus 로고
    • A linear time approximation algorithm for multiprocessor scheduling
    • Finn, G, and Horowitz, E., 1979, A linear time approximation algorithm for multiprocessor scheduling, BIT, 19, 312-320.
    • (1979) BIT , vol.19 , pp. 312-320
    • Finn, G.1    Horowitz, E.2
  • 10
    • 0028374440 scopus 로고
    • A composite heuristic for the identical parallel machine scheduling problem with minimum makespan objective
    • Franca, P. M„ Gendreau, M., Laporte, G., and Muller, F. M„ 1994, A composite heuristic for the identical parallel machine scheduling problem with minimum makespan objective. Computers and Operations Research, 21 (2), 205-210
    • (1994) Computers and Operations Research , vol.21 , Issue.2 , pp. 205-210
    • Franca Gendreau, P.M.M.1    Laporte, G.2    Muller, F.M.3
  • 11
    • 0002703574 scopus 로고
    • Tabu Search: A Tutorial
    • Glover, F., 1990, Tabu Search: A Tutorial. Interfaces, 20 (4), 74-94.
    • (1990) Interfaces , vol.20 , Issue.4 , pp. 74-94
    • Glover, F.1
  • 12
    • 0014477093 scopus 로고
    • Bounds on multiprocessing timing anomolies
    • Graham, R, L., 1969, Bounds on multiprocessing timing anomolies. SIAM Journal on Applied Mathematics, 17,416-429.
    • (1969) SIAM Journal on Applied Mathematics , vol.17 , pp. 416-429
    • Graham, R.1
  • 14
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves, S. C., 1981, A review of production scheduling. Operations Research, 29, 646-675.
    • (1981) Operations Research , vol.29 , pp. 646-675
    • Graves, S.C.1
  • 15
    • 0028516690 scopus 로고
    • Applying tabu search with influential diversification to multiprocessor scheduling
    • Hubscher, R., and Glover, F., 1994, Applying tabu search with influential diversification to multiprocessor scheduling. Computers and Operations Research, 21 (8), 877-884.
    • (1994) Computers and Operations Research , vol.21 , Issue.8 , pp. 877-884
    • Hubscher, R.1    Glover, F.2
  • 16
    • 85023502835 scopus 로고
    • Proceedings of the National Science Foundation Conference on Intelligent Dynamic Scheduling. Cocoa Beach, Florida, January
    • Interrante, L., and Smith, S., 1993, Intelligent dynamic scheduling for manufacturing systems. Proceedings of the National Science Foundation Conference on Intelligent Dynamic Scheduling. Cocoa Beach, Florida, January, pp. 1-10.
    • (1993) Intelligent Dynamic Scheduling for Manufacturing Systems , pp. 1-10
    • Interrante, L.1    Smith, S.2
  • 17
    • 0000455824 scopus 로고
    • Simulated annealing: Use of a new tool in bin packing
    • Kampke, T, 1988, Simulated annealing: use of a new tool in bin packing. Annals of Operations Research, 16, 327-332.
    • (1988) Annals of Operations Research , vol.16 , pp. 327-332
    • Kampke, T.1
  • 19
    • 0020272158 scopus 로고
    • Improved 0/1 interchange scheduling
    • Langston, M. A., 1982, Improved 0/1 interchange scheduling, BIT, 22, 282-290.
    • (1982) BIT , vol.22 , pp. 282-290
    • Langston, M.A.1
  • 20
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimal and heuristic methods in production scheduling
    • MacCarthy, B. L., and Liu, J., 1993, Addressing the gap in scheduling research: a review of optimal and heuristic methods in production scheduling. International Journal of Production Research, 31 (1), 59-79.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • Maccarthy, B.L.1    Liu, J.2
  • 21
    • 0025434528 scopus 로고
    • A strong cutting plane algorithm for production scheduling with changeover costs
    • Magnanti, T. L., and Vachani, R., 1990, A strong cutting plane algorithm for production scheduling with changeover costs. Operations Research, 38 (3).
    • (1990) Operations Research , vol.38 , Issue.3
    • Magnanti, T.L.1    Vachani, R.2
  • 22
    • 0022023671 scopus 로고
    • A branch and bound algorithm for the total weighted tardiness problem
    • Potts, C. N., and Vanwassenhove, L. N., 1985, A branch and bound algorithm for the total weighted tardiness problem. Operations Research, 33 (2).
    • (1985) Operations Research , vol.33 , Issue.2
    • Potts, C.N.1    Vanwassenhove, L.N.2
  • 24
    • 0025413493 scopus 로고
    • Some heuristics for scheduling jobs on parallel machines with setups
    • So, K. C., 1990, Some heuristics for scheduling jobs on parallel machines with setups. Management Science, 36 (4), 460-475.
    • (1990) Management Science , vol.36 , Issue.4 , pp. 460-475
    • So, K.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.