-
1
-
-
0001255490
-
A computational study of local search algorithms for job shop scheduling
-
Aarts, E. H. L., Vanlaarhoven, P. J. M., Lenstra, J. K., and Ulder, N. L. J., 1994, A computational study of local search algorithms for job shop scheduling. ORSA Journal on Computing, 6 (2), 118-125.
-
(1994)
ORSA Journal on Computing
, vol.6
, Issue.2
, pp. 118-125
-
-
Aarts, E.H.L.1
Vanlaarhoven, P.J.M.2
Lenstra, J.K.3
Ulder, N.L.J.4
-
3
-
-
0017471858
-
An improved algorithm for scheduling jobs on identical machines
-
Barnes, J. W., and Brennan, J., 1977, An improved algorithm for scheduling jobs on identical machines. AllE Transactions, 9 (1), 134-143.
-
(1977)
Alle Transactions
, vol.9
, Issue.1
, pp. 134-143
-
-
Barnes, J.W.1
Brennan, J.2
-
4
-
-
0027562546
-
Solving the multiple-machine weighted flow time problem using tabu search
-
Barnes, J. W., and Laguna, M., 1993, Solving the multiple-machine weighted flow time problem using tabu search. IIE Transactions, 25 (2), 121-128.
-
(1993)
IIE Transactions
, vol.25
, Issue.2
, pp. 121-128
-
-
Barnes, J.W.1
Laguna, M.2
-
5
-
-
0020013653
-
A state-of-the an survey of dispatching rules for manufacturing job shop operations
-
BlackSTOne, J. H., Phillips, D. T., and Hogg, G. L., 1982, A state-of-the an survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20 (1), 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, Issue.1
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
6
-
-
0004113622
-
-
Reading, MA: Addison-Wesley)
-
Conway, R. W., Maxwell, W. L., and Miller, L. W., 1970, Theory of Scheduling, (Reading, MA: Addison-Wesley).
-
(1970)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
8
-
-
0002499542
-
The lessons of flowshop scheduling research
-
Dudek, R. A., Panwalker, S. S., and Smith, M. L., 1992, The lessons of flowshop scheduling research. Operations Research, 40 (1).
-
(1992)
Operations Research
, vol.40
, Issue.1
-
-
Dudek, R.A.1
Panwalker, S.S.2
Smith, M.L.3
-
9
-
-
0018678342
-
A linear time approximation algorithm for multiprocessor scheduling
-
Finn, G, and Horowitz, E., 1979, A linear time approximation algorithm for multiprocessor scheduling, BIT, 19, 312-320.
-
(1979)
BIT
, vol.19
, pp. 312-320
-
-
Finn, G.1
Horowitz, E.2
-
10
-
-
0028374440
-
A composite heuristic for the identical parallel machine scheduling problem with minimum makespan objective
-
Franca, P. M„ Gendreau, M., Laporte, G., and Muller, F. M„ 1994, A composite heuristic for the identical parallel machine scheduling problem with minimum makespan objective. Computers and Operations Research, 21 (2), 205-210
-
(1994)
Computers and Operations Research
, vol.21
, Issue.2
, pp. 205-210
-
-
Franca Gendreau, P.M.M.1
Laporte, G.2
Muller, F.M.3
-
11
-
-
0002703574
-
Tabu Search: A Tutorial
-
Glover, F., 1990, Tabu Search: A Tutorial. Interfaces, 20 (4), 74-94.
-
(1990)
Interfaces
, vol.20
, Issue.4
, pp. 74-94
-
-
Glover, F.1
-
12
-
-
0014477093
-
Bounds on multiprocessing timing anomolies
-
Graham, R, L., 1969, Bounds on multiprocessing timing anomolies. SIAM Journal on Applied Mathematics, 17,416-429.
-
(1969)
SIAM Journal on Applied Mathematics
, vol.17
, pp. 416-429
-
-
Graham, R.1
-
13
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling
-
Graham, M. R., Lawler, E. L., Lenstra, J. K., and Rinnooy-Kan, A. H. G., 1979, Optimization and approximation in deterministic sequencing and scheduling. Annals of Discrete Mathematics, 5, 287-326.
-
(1979)
Annals of Discrete Mathematics
, vol.5
, pp. 287-326
-
-
Graham, M.R.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy-Kan, A.H.G.4
-
14
-
-
0019585243
-
A review of production scheduling
-
Graves, S. C., 1981, A review of production scheduling. Operations Research, 29, 646-675.
-
(1981)
Operations Research
, vol.29
, pp. 646-675
-
-
Graves, S.C.1
-
15
-
-
0028516690
-
Applying tabu search with influential diversification to multiprocessor scheduling
-
Hubscher, R., and Glover, F., 1994, Applying tabu search with influential diversification to multiprocessor scheduling. Computers and Operations Research, 21 (8), 877-884.
-
(1994)
Computers and Operations Research
, vol.21
, Issue.8
, pp. 877-884
-
-
Hubscher, R.1
Glover, F.2
-
16
-
-
85023502835
-
-
Proceedings of the National Science Foundation Conference on Intelligent Dynamic Scheduling. Cocoa Beach, Florida, January
-
Interrante, L., and Smith, S., 1993, Intelligent dynamic scheduling for manufacturing systems. Proceedings of the National Science Foundation Conference on Intelligent Dynamic Scheduling. Cocoa Beach, Florida, January, pp. 1-10.
-
(1993)
Intelligent Dynamic Scheduling for Manufacturing Systems
, pp. 1-10
-
-
Interrante, L.1
Smith, S.2
-
17
-
-
0000455824
-
Simulated annealing: Use of a new tool in bin packing
-
Kampke, T, 1988, Simulated annealing: use of a new tool in bin packing. Annals of Operations Research, 16, 327-332.
-
(1988)
Annals of Operations Research
, vol.16
, pp. 327-332
-
-
Kampke, T.1
-
18
-
-
0024082389
-
Look-ahead scheduling for minimizing machine interference
-
Koulamas, C. P., and Smith, M. L., 1988, Look-ahead scheduling for minimizing machine interference. International Journal of Production Research, 26 (9), 1523-1533.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.9
, pp. 1523-1533
-
-
Koulamas, C.P.1
Smith, M.L.2
-
19
-
-
0020272158
-
Improved 0/1 interchange scheduling
-
Langston, M. A., 1982, Improved 0/1 interchange scheduling, BIT, 22, 282-290.
-
(1982)
BIT
, vol.22
, pp. 282-290
-
-
Langston, M.A.1
-
20
-
-
0027146758
-
Addressing the gap in scheduling research: A review of optimal and heuristic methods in production scheduling
-
MacCarthy, B. L., and Liu, J., 1993, Addressing the gap in scheduling research: a review of optimal and heuristic methods in production scheduling. International Journal of Production Research, 31 (1), 59-79.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.1
, pp. 59-79
-
-
Maccarthy, B.L.1
Liu, J.2
-
21
-
-
0025434528
-
A strong cutting plane algorithm for production scheduling with changeover costs
-
Magnanti, T. L., and Vachani, R., 1990, A strong cutting plane algorithm for production scheduling with changeover costs. Operations Research, 38 (3).
-
(1990)
Operations Research
, vol.38
, Issue.3
-
-
Magnanti, T.L.1
Vachani, R.2
-
22
-
-
0022023671
-
A branch and bound algorithm for the total weighted tardiness problem
-
Potts, C. N., and Vanwassenhove, L. N., 1985, A branch and bound algorithm for the total weighted tardiness problem. Operations Research, 33 (2).
-
(1985)
Operations Research
, vol.33
, Issue.2
-
-
Potts, C.N.1
Vanwassenhove, L.N.2
-
23
-
-
0024112269
-
A recent survey of production scheduling
-
Rodammer, F. A., and White K. P., 1988, A recent survey of production scheduling, IEEE Transactions on Systems, Man and Cybernetics, 18 (6).
-
(1988)
IEEE Transactions on Systems, Man and Cybernetics
, vol.18
, Issue.6
-
-
Rodammer, F.A.1
White, K.P.2
-
24
-
-
0025413493
-
Some heuristics for scheduling jobs on parallel machines with setups
-
So, K. C., 1990, Some heuristics for scheduling jobs on parallel machines with setups. Management Science, 36 (4), 460-475.
-
(1990)
Management Science
, vol.36
, Issue.4
, pp. 460-475
-
-
So, K.C.1
-
25
-
-
0021934896
-
Review of operator/machine interference models
-
Stecke, K. E., and Aronson, J. E., 1985, Review of operator/machine interference models. International Journal of Production Research, 23 (1), 129-151.
-
(1985)
International Journal of Production Research
, vol.23
, Issue.1
, pp. 129-151
-
-
Stecke, K.E.1
Aronson, J.E.2
|