메뉴 건너뛰기




Volumn 210, Issue 2, 1996, Pages 167-176

A framework for modelling the coincident flow of workpieces and cutting tools

Author keywords

Dual flow emulator; Flexible machining cells; Modelling of workpieces and cutting tools

Indexed keywords

COMPUTER SIMULATION; CUTTING TOOLS; DECISION MAKING; FLEXIBLE MANUFACTURING SYSTEMS; MACHINE DESIGN; MACHINING; MACHINING CENTERS; MATHEMATICAL MODELS; PERFORMANCE; SCHEDULING;

EID: 0029734028     PISSN: 09544054     EISSN: None     Source Type: Journal    
DOI: 10.1243/PIME_PROC_1996_210_102_02     Document Type: Article
Times cited : (1)

References (18)
  • 1
    • 0027591340 scopus 로고
    • Synthesis of decision models for tool management in automated manufacturing
    • Gray, A. E., Seidmann, A. and Stecke, K. E. Synthesis of decision models for tool management in automated manufacturing. Manag. Sci., 1993, 39(5), 549-567.
    • (1993) Manag. Sci. , vol.39 , Issue.5 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 3
    • 8544231238 scopus 로고
    • Grouping parts and tools in flexible manufacturing systems production planning
    • Ventura, J. A., Chen, F. F. and Wu, C. Grouping parts and tools in flexible manufacturing systems production planning. Int. J. Prod. Res., 1990, 28(6), 1039-1056.
    • (1990) Int. J. Prod. Res. , vol.28 , Issue.6 , pp. 1039-1056
    • Ventura, J.A.1    Chen, F.F.2    Wu, C.3
  • 4
    • 33746970014 scopus 로고
    • Resource-requirements planning in flexible manufacturing systems
    • Jain, A. K., Kasilingam, R. G. and Bhole, S. D. Resource-requirements planning in flexible manufacturing systems, Int. J. Adv. Mfg Technol., 1991, 6, 232-245.
    • (1991) Int. J. Adv. Mfg Technol. , vol.6 , pp. 232-245
    • Jain, A.K.1    Kasilingam, R.G.2    Bhole, S.D.3
  • 5
    • 0028014137 scopus 로고
    • Minimising the number of tool switches on a flexible machine
    • Crama, Y., et al. Minimising the number of tool switches on a flexible machine. Int. J. Flexible Mfg Systems, 1994, 6(1), 33-54.
    • (1994) Int. J. Flexible Mfg Systems , vol.6 , Issue.1 , pp. 33-54
    • Crama, Y.1
  • 6
    • 0026880694 scopus 로고
    • Planning tool requirements for flexible manufacturing - An analytical approach
    • Zavanella, L. and Bugini, A. Planning tool requirements for flexible manufacturing - an analytical approach. Int. J. Prod. Res., 1992, 30 (6), 1401-1414.
    • (1992) Int. J. Prod. Res. , vol.30 , Issue.6 , pp. 1401-1414
    • Zavanella, L.1    Bugini, A.2
  • 7
    • 3743105739 scopus 로고
    • A tool and part flow simulator for optimal FMS management
    • Eds V. C. Venkatesh and J. A. McGeough, Elsevier Science, Oxford
    • Alberti, N., La Commare, U., La Dega, N. S. and Perrone, G. A tool and part flow simulator for optimal FMS management. In Computer-aided production engineering (Eds V. C. Venkatesh and J. A. McGeough), 1991, pp. 283-292 (Elsevier Science, Oxford).
    • (1991) Computer-aided Production Engineering , pp. 283-292
    • Alberti, N.1    La Commare, U.2    La Dega, N.S.3    Perrone, G.4
  • 8
    • 0025418241 scopus 로고
    • A model and a solution approach for the machine loading and tool allocation problem in an FMS
    • Ram, B., Sarin, S. and Chen, C. S. A model and a solution approach for the machine loading and tool allocation problem in an FMS. Int. J. Prod. Res., 1990, 28(4), 637-645.
    • (1990) Int. J. Prod. Res. , vol.28 , Issue.4 , pp. 637-645
    • Ram, B.1    Sarin, S.2    Chen, C.S.3
  • 10
    • 0028466353 scopus 로고
    • Comparative study of FMS tool allocation and part type selection approaches for a varying part type mix
    • Amoaka Gyampah, K. Comparative study of FMS tool allocation and part type selection approaches for a varying part type mix. Int. J. Flexible Mfg Systems, 1994, 6(3), 179-207.
    • (1994) Int. J. Flexible Mfg Systems , vol.6 , Issue.3 , pp. 179-207
    • Amoaka Gyampah, K.1
  • 11
    • 0026692327 scopus 로고
    • A knowledge based multi-level modelling system for the design of flexible machining facilities
    • Wang, W. and Bell, R. A knowledge based multi-level modelling system for the design of flexible machining facilities. Int. J. Prod. Res., 1992, 30(1), 13-34.
    • (1992) Int. J. Prod. Res. , vol.30 , Issue.1 , pp. 13-34
    • Wang, W.1    Bell, R.2
  • 13
    • 33747021587 scopus 로고
    • British Aerospace: Small machine parts FMS: a case study
    • 15-17 October
    • Goulding, M. British Aerospace: small machine parts FMS: a case study. Proceedings of Fourth FMS Conference, 15-17 October 1985, pp. 357-367.
    • (1985) Proceedings of Fourth FMS Conference , pp. 357-367
    • Goulding, M.1
  • 17
    • 33747009528 scopus 로고
    • Completion in site for Yamazakis UK factory
    • July
    • Kochan, A. Completion in site for Yamazakis UK factory. FMS Mag., July 1986, 4(3), 137-138.
    • (1986) FMS Mag. , vol.4 , Issue.3 , pp. 137-138
    • Kochan, A.1
  • 18
    • 0025595213 scopus 로고
    • A methodical approach to the FMS batching, loading and tool configuration problems
    • Co, H. C., Biermann, J. S. and Chen, S. K. A methodical approach to the FMS batching, loading and tool configuration problems. Int. J. Prod. Res., 1990, 28( 12), 2171-2186.
    • (1990) Int. J. Prod. Res. , vol.28 , Issue.12 , pp. 2171-2186
    • Co, H.C.1    Biermann, J.S.2    Chen, S.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.