메뉴 건너뛰기




Volumn 20, Issue SUPPL.2, 1996, Pages

Continuous time representation in batch/semicontinuous process scheduling: Randomized heuristics approach

Author keywords

[No Author keywords available]

Indexed keywords

CHEMICAL PLANTS; COMPUTER SIMULATION; HEURISTIC METHODS; MATHEMATICAL MODELS; OPTIMIZATION; RANDOM PROCESSES; SCHEDULING;

EID: 0029713694     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/0098-1354(96)00203-7     Document Type: Article
Times cited : (15)

References (9)
  • 1
    • 0000711418 scopus 로고
    • A Branch and Bound Solution to the General Scheduling Problem
    • Greenberg, H., 1968, A Branch and Bound Solution to the General Scheduling Problem. Operations Research 16.
    • (1968) Operations Research , vol.16
    • Greenberg, H.1
  • 3
    • 84974753104 scopus 로고
    • Bayesian Approach Adapting Stochastic and Heuristic Methods of Global and Discrete Optimization
    • Mockus, A., Mockus J., and Mockus L., 1994, Bayesian Approach Adapting Stochastic and Heuristic Methods of Global and Discrete Optimization, Informatica 5, 123-174.
    • (1994) Informatica , vol.5 , pp. 123-174
    • Mockus, A.1    Mockus, J.2    Mockus, L.3
  • 5
    • 21844510500 scopus 로고
    • Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization
    • Reklaitis, G.V. and Mockus, L.,1995b, Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization. Acta Chimica Slovenica 42, 81-86.
    • (1995) Acta Chimica Slovenica , vol.42 , pp. 81-86
    • Reklaitis, G.V.1    Mockus, L.2
  • 6
    • 0042341212 scopus 로고
    • An MILP model for short term scheduling of batch plants
    • Paper No.235b, San-Francisco, CA
    • Pinto, J.M. and Grossmann, I.E., 1994, An MILP model for short term scheduling of batch plants. AIChE annual meeting, Paper No.235b, San-Francisco, CA.
    • (1994) AIChE Annual Meeting
    • Pinto, J.M.1    Grossmann, I.E.2
  • 7
    • 0041840020 scopus 로고
    • A new unified formulation for process scheduling
    • Paper No.144c, St.Louis, Missouri
    • Xueya, Z. and Sargent, R.W.H., 1993, A new unified formulation for process scheduling. AIChE annual meeting, Paper No.144c, St.Louis, Missouri.
    • (1993) AIChE Annual Meeting
    • Xueya, Z.1    Sargent, R.W.H.2
  • 8
    • 0010440703 scopus 로고
    • An interval-based mathematical model for the scheduling of resource-constrained batch chemical processes
    • Antalya, Turkey
    • Zentner, M.G. and Reklaitis, G.V., 1992, An interval-based mathematical model for the scheduling of resource-constrained batch chemical processes. Proc. NATO ASI on Batch Processing Systems Engineering, Antalya, Turkey.
    • (1992) Proc. NATO ASI on Batch Processing Systems Engineering
    • Zentner, M.G.1    Reklaitis, G.V.2
  • 9
    • 0010234729 scopus 로고
    • RCSP++: A scheduling system for the chemical process industry
    • Kyongju, Korea
    • Zentner, M.G., Pekny, J.F., Miller, D.L., and Reklaitis, G.V., 1994, RCSP++: A scheduling system for the chemical process industry. Proc. PSE'94, Kyongju, Korea, 491-495.
    • (1994) Proc. PSE'94 , pp. 491-495
    • Zentner, M.G.1    Pekny, J.F.2    Miller, D.L.3    Reklaitis, G.V.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.