|
Volumn 18, Issue 1, 1996, Pages 29-46
|
Estimation of parameters in geotechnical backanalysis - II. Application to a tunnel excavation problem
a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
BACK ANALYSIS;
FINITE ELEMENT METHOD;
GEOTECHNICAL PARAMETERS;
MAXIMUM LIKELIHOOD METHOD;
TUNNELLING;
ALGORITHMS;
CLAY;
CONSOLIDATION;
ELASTIC MODULI;
FINITE ELEMENT METHOD;
MATHEMATICAL MODELS;
PARAMETER ESTIMATION;
RELIABILITY;
TUNNELING (EXCAVATION);
GEOTECHNICAL BACKANALYSIS;
OVERCONSOLIDATED CLAY;
SOIL MECHANICS;
|
EID: 0029669310
PISSN: 0266352X
EISSN: None
Source Type: Journal
DOI: 10.1016/0266-352X(95)00022-3 Document Type: Article |
Times cited : (80)
|
References (4)
|