메뉴 건너뛰기




Volumn 10, Issue 4, 1995, Pages 2021-2028

Hydrothermal Scheduling Via Extended Differential Dynamic Programming and Mixed Coordination

Author keywords

extended differential dynamic programming; hydrothermal generation scheduling; mixed coordination

Indexed keywords

CONSTRAINT THEORY; CONTROL SYSTEMS; DYNAMIC PROGRAMMING; ELECTRIC POWER GENERATION; PARALLEL PROCESSING SYSTEMS; PARAMETER ESTIMATION; PROBLEM SOLVING; RELAXATION PROCESSES; SCHEDULING;

EID: 0029409019     PISSN: 08858950     EISSN: 15580679     Source Type: Journal    
DOI: 10.1109/59.476071     Document Type: Article
Times cited : (67)

References (20)
  • 1
    • 0343088442 scopus 로고
    • Optimal Scheduling of Hydrothermal Systems
    • Feb.
    • S.K. Agawal, I.J. Nagrath, “Optimal Scheduling of Hydrothermal Systems,” Proc. IEE, Vol. 119, No. 2, Feb. 1972, pp. 169-173.
    • (1972) , vol.119 , Issue.2 , pp. 169-173
    • Agawal, S.K.1    Nagrath, I.J.2
  • 2
    • 0023399620 scopus 로고
    • Short-Term Generation Scheduling of Hydraulic Multi-Reservoir Multi-Area Interconnected Systems
    • Aug.
    • S.M. Amado, C.C. Rebeiro, “Short-Term Generation Scheduling of Hydraulic Multi-Reservoir Multi-Area Interconnected Systems,” IEEE Trans. on Power Systems, Vol. PWRS-2, No. 3, Aug. 1987, pp.758-763.
    • (1987) , vol.PWRS-2 , Issue.3 , pp. 758-763
    • Amado, S.M.1    Rebeiro, C.C.2
  • 3
    • 84943460561 scopus 로고
    • Academic Press, New York
    • D.P. Bertsekas, Constrained Optimization and Lagrange Multiplier Methods, Academic Press, New York, 1982.
    • (1982)
    • Bertsekas, D.P.1
  • 4
    • 84943460681 scopus 로고
    • Prentice-Hall Englewood Cliffs, N.J.
    • D.P. Bertsekas, J.N. Tsitsiklis, Parallel and Distributed Computation, Prentice-Hall, Englewood Cliffs, N.J., 1989.
    • (1989)
    • Bertsekas, D.P.1    Tsitsiklis, J.N.2
  • 5
    • 0023401833 scopus 로고
    • Continuous Solution Simulation in the Short-Term Hydrothermal Coordination Problem
    • Aug.
    • L.R. Calderon, F.D. Galiana, “Continuous Solution Simulation in the Short-Term Hydrothermal Coordination Problem,” IEEE Trans. on Power Systems, Vol. PWRS-2, No.3, Aug. 1987, pp. 737-743.
    • (1987) , vol.PWRS-2 , pp. 737-743
    • Calderon, L.R.1    Galiana, F.D.2
  • 6
    • 0025473373 scopus 로고
    • Hydro-electric Generation Scheduling with An Effective Differential Dynamic Programming Algorithm
    • August
    • S.C. Chang, C.H. Chen, I.K. Fong, and P.B. Luh, “Hydro-electric Generation Scheduling with An Effective Differential Dynamic Programming Algorithm,” IEEE Trans. on Power Systems, Vol. 5, No. 3, August 1990, pp. 737-743.
    • (1990) , vol.5 , Issue.3 , pp. 737-743
    • Chang, S.C.1    Chen, C.H.2    Fong, I.K.3    Luh, P.B.4
  • 7
    • 0006028812 scopus 로고
    • Optimum Operation of a Hydrothermal System
    • May
    • J.H. Drake, L.K. Kirchmayer, R.B. Mayall, W. Wood, “Optimum Operation of a Hydrothermal System,” AIEE Trans. on PAS, Vol. PAS-80, Aug. 1962, pp. 242-250.
    • (1962) , vol.PAS-80 , pp. 242-250
    • Drake, J.H.1    Kirchmayer, L.K.2    Mayall, R.B.3    Wood, W.4
  • 8
    • 0006029589 scopus 로고
    • Optimal Solution to the Hydro-Steam Dispatch Problem for Certain Practical Systems
    • May
    • E.B. Dahlin, D.N.C. Shen, “Optimal Solution to the Hydro-Steam Dispatch Problem for Certain Practical Systems,” IEEE Trans. on PAS, Vol. PAS-85, May 1966, pp. 437-458.
    • (1966) IEEE Trans. on PAS , vol.PAS-85 , pp. 437-458
    • Dahlin, E.B.1    Shen, D.N.C.2
  • 9
    • 0025386283 scopus 로고
    • A New Generation Scheduling Program at Ontario Hydro
    • H. Habibollahzadeh, D. Frances, U. Sui “A New Generation Scheduling Program at Ontario Hydro”, IEEE Trans. on Power Systems, Vol. 5, No. 1, Feb, 1990, pp 65-73.
    • (1990) IEEE Trans. on Power Systems , vol.5 , Issue.1 , pp. 65-73
    • Habibollahzadeh, H.1    Frances, D.2    Sui, U.3
  • 11
    • 0018656420 scopus 로고
    • Constrained Differential Dynamic Programming with Application to Multi-Reservoir Control
    • D. Murray, S. Yakowitz, “Constrained Differential Dynamic Programming with Application to Multi-Reservoir Control,” Water Resource Research, Vol. 15, 1979, pp. 1017-1027.
    • (1979) , vol.15 , pp. 1017-1027
    • Murray, D.1    Yakowitz, S.2
  • 12
    • 0017935448 scopus 로고
    • A New Approach to Differential Dynamic Programming for Discrete Time Systems
    • Feb.
    • K. Ohno, “A New Approach to Differential Dynamic Programming for Discrete Time Systems,” IEEE Trans. on Automatic Control, Vol. AC-23, N0.1, Feb. 1978, pp 37-47.
    • (1978) , vol.AC-23 , pp. 37-47
    • Ohno, K.1
  • 13
    • 0019021384 scopus 로고
    • Optimal Generation Scheduling of Hydrothermal Power Systems
    • May
    • S. Soares, C. Lyra, H. Tavares, “Optimal Generation Scheduling of Hydrothermal Power Systems,” IEEE Trans. on PAS, Vol. PAS-99, No.3, May/June 1980, pp. 1107-1115.
    • (1980) , vol.PAS-99 , pp. 1107-1115
    • Soares, S.1    Lyra, C.2    Tavares, H.3
  • 14
    • 0024750865 scopus 로고
    • Mixed Coordination Method for Non-Linear Programming Problems with Separable Structures
    • J. Tang, P.B. Luh, T.S. Chang, “Mixed Coordination Method for Non-Linear Programming Problems with Separable Structures,” International Journal of Control, Vol. 50, No. 4, 1989, pp. 1461-1486.
    • (1989) , vol.50 , Issue.4 , pp. 1461-1486
    • Tang, J.1    Luh, P.B.2    Chang, T.S.3
  • 15
    • 0026172141 scopus 로고
    • Mixed Coordination Method for Long Horizon Optimal Control Problems
    • J. Tang, P.B. Luh, T.S. Chang, “Mixed Coordination Method for Long Horizon Optimal Control Problems,” International Journal of Control, Vol. 53, No. 6, 1991, pp. 1395-1412.
    • (1991) International Journal of Control , vol.53 , Issue.6 , pp. 1395-1412
    • Tang, J.1    Luh, P.B.2    Chang, T.S.3
  • 16
    • 84943459056 scopus 로고
    • John Wiley and Sons, NY
    • A.J. Wood, B.F. Wollenberg, Power Generation Operation and Control, John Wiley and Sons, NY, 1984.
    • (1984)
    • Wood, A.J.1    Wollenberg, B.F.2
  • 17
    • 0022529979 scopus 로고
    • The Stagewise Kuhn-Tucker Condition and Differential Dynamic Programming
    • Jan.
    • S. Yakowitz, “The Stagewise Kuhn-Tucker Condition and Differential Dynamic Programming,” IEEE Trans. on Automatic Control, Vol. AC-31, No. 1, Jan., 1986, pp. 25-30.
    • (1986) IEEE Trans. on Automatic Control , vol.AC-31 , Issue.1 , pp. 25-30
    • Yakowitz, S.1
  • 18
    • 0002487428 scopus 로고
    • Computational Aspects of Discrete-Time Optimal Control
    • S. Yakowitz, B.F. Rutherford, “Computational Aspects of Discrete-Time Optimal Control,” Appl. Math. Compu., Vol. 15, N0.1, 1984, pp 29-45.
    • (1984) , vol.15 , pp. 29-45
    • Yakowitz, S.1    Rutherford, B.F.2
  • 19
    • 0024719920 scopus 로고
    • Short Term Hydrothermal Coordination Using Multi-Pass Dynamic Programming
    • Aug.
    • J.S. Yang, N. Chen, “Short Term Hydrothermal Coordination Using Multi-Pass Dynamic Programming,” IEEE Trans. on Power Systems, Vol. 4, No.3, Aug. 1989, pp. 1050-1056.
    • (1989) , vol.4 , pp. 1050-1056
    • Yang, J.S.1    Chen, N.2
  • 20
    • 0027007497 scopus 로고
    • Optimization of Real-Time Hydrothermal System Operation
    • Dec.
    • W.W-G. Yeh et al., “Optimization of Real-Time Hydrothermal System Operation,” Journal of Water Resources Planning and Management, Vol. 118, No. 6, Nov./Dec. 1992, pp. 636-653.
    • (1992) , vol.118 , Issue.6 , pp. 636-653
    • Yeh, W.W-G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.