![]() |
Volumn 142, Issue 6, 1995, Pages 555-559
|
Modelled operation of the Shetland islands power system comparing computational and human operators' load forecasts
a
|
Author keywords
[No Author keywords available]
|
Indexed keywords
AVAILABILITY;
COMPUTATIONAL METHODS;
COMPUTER SIMULATION;
ELECTRIC LOADS;
ELECTRIC POWER PLANTS;
ELECTRIC POWER SYSTEMS;
ERRORS;
FUEL CONSUMPTION;
MATHEMATICAL MODELS;
SCHEDULING;
AUTOREGRESSIVE METHOD;
COMPUTATIONAL FORECASTING METHOD;
LERWICK OPERATORS;
POWER STATION OPERATORS;
TOTAL GENERATED OUTPUT;
ELECTRIC LOAD FORECASTING;
|
EID: 0029404368
PISSN: 13502360
EISSN: None
Source Type: Journal
DOI: 10.1049/ip-gtd:19952248 Document Type: Article |
Times cited : (4)
|
References (5)
|