Volumn 10, Issue 4, 1995, Pages 1799-1805

Minimum Cost Analysis of Station Configurations

Author keywords

[No Author keywords available]

Indexed keywords

APPROXIMATION THEORY; COSTS; ELECTRIC LOADS; FAILURE ANALYSIS; MAINTENANCE; MARKOV PROCESSES; MATHEMATICAL MODELS; OUTAGES; PROBABILITY; RELIABILITY; SYSTEMS ANALYSIS;

EID: 0029390201     PISSN: 08858977     EISSN: 19374208     Source Type: Journal    
DOI: 10.1109/61.473377     Document Type: Article
Times cited : (10)

References (19)
  • 2
    • 0004054029 scopus 로고
    • Reliability Assessment Of Large Electric Power Systems
    • Boston, USA
    • Billinton, R. and Allan, R. N., “Reliability Assessment Of Large Electric Power Systems", Kluwer Academic Publishers, Boston, USA, 1988.
    • (1988)
    • Billinton, R.1    Allan, R.N.2
  • 3
    • 0004046379 scopus 로고
    • Reliability Modeling in Electric Power Systems
    • Endrenyi, J., “Reliability Modeling in Electric Power Systems", J. Wiley (Chichester), 1978.
    • (1978)
    • Endrenyi, J.1
  • 4
    • 84944981119 scopus 로고
    • Report on Basic Station Single Line Diagrams in use by Canadian Utilities and Consultants
    • CEA Working Group March
    • CEA Working Group, “ Report on Basic Station Single Line Diagrams in use by Canadian Utilities and Consultants", CEA Transactions, Vol. 19, Pt. 5, March 17, 1980.
    • (1980) , vol.19
  • 5
    • 0023670038 scopus 로고
    • The Effects of Terminal Complexity and Redundancy on the Frequency and Duration of Forced Outages
    • Nov.
    • Lauby, M. G., Klempel, D. D., Dahl, C. G., Gunderson, R. O., Weber, E. P., Lehman, P. J., “The Effects of Terminal Complexity and Redundancy on the Frequency and Duration of Forced Outages", IEEE Transactions on Power Systems, Nov. 1987, Vol. PWRS-2, No. 4, pp. 856-863.
    • (1987) , vol.PWRS-2 , Issue.4 , pp. 856-863
    • Lauby, M.G.1    Klempel, D.D.2    Dahl, C.G.3    Gunderson, R.O.4    Weber, E.P.5    Lehman, P.J.6
  • 6
    • 0016107089 scopus 로고
    • A Computerized Approach to Substation and Switching Station Reliability Evaluation
    • Grover, M. S., and Billinton, R. “A Computerized Approach to Substation and Switching Station Reliability Evaluation", IEEE Transactions on Power Apparatus and Systems, Vol. PAS-93, No.5, Sept/Oct 1974, pp. 1488-1497.
    • (1974) , vol.PAS-93 , pp. 1488-1497
    • Grover, M.S.1    Billinton, R.2
  • 7
    • 0017533156 scopus 로고
    • Reliability Evaluation of the Auxiliary Electrical Systems of Power Stations
    • Allan, R. N., Billinton, R., and M. F. De Oliveira, “ Reliability Evaluation of the Auxiliary Electrical Systems of Power Stations", IEEE Transactions on Power Apparatus and Systems, Vol. PAS-96, No.5, Sept/Oct 1977, pp. 1441-1449.
    • (1977) , vol.PAS-96 , pp. 1441-1449
    • Allan, R.N.1    Billinton, R.2    De Oliveira, M.F.3
  • 8
    • 0016944475 scopus 로고
    • Reliability Evaluation of Electrical Systems with Switching Actions
    • Allan, R. N., Billinton, R., and M. F. De Oliveira, “ Reliability Evaluation of Electrical Systems with Switching Actions", Proc. IEE, Vol. 123, No. 41, Apr 1976, pp. 325-330.
    • (1976) , vol.123 , Issue.41 , pp. 325-330
    • Allan, R.N.1    Billinton, R.2    De Oliveira, M.F.3
  • 9
    • 0020194552 scopus 로고
    • Cost-Effectiveness Analysis of Substation Arrangements
    • Oct.
    • Lannes, W. J., “Cost-Effectiveness Analysis of Substation Arrangements", IEEE TRansactions on Reliability", Vol. R-31, No. 4, Oct. 1982, pp. 404-409.
    • (1982) , vol.R-31 , Issue.4 , pp. 404-409
    • Lannes, W.J.1
  • 10
    • 84893950078 scopus 로고
    • Reliability Evaluation of Substation Bus Arrangements
    • Albrecht, P. F., “Reliability Evaluation of Substation Bus Arrangements", CEA Transactions, Vol. 13, Pt. 3, 1974, 74-SP-152.
    • (1974) , vol.13
    • Albrecht, P.F.1
  • 11
    • 0028370656 scopus 로고
    • Transmission Station Reliability Evaluation
    • February
    • Medicherla, T. K. P., Chau, M., Zigmund, R. E., Chan, K., “Transmission Station Reliability Evaluation", IEEE Transactions on Power Systems, Vol. 9, No. 1, February 1994, pp. 295-304.
    • (1994) , vol.9 , Issue.1 , pp. 295-304
    • Medicherla, T.K.P.1    Chau, M.2    Zigmund, R.E.3    Chan, K.4
  • 12
    • 0023156860 scopus 로고
    • Station - Initiated Outages in Composite - System Adequacy Evaluation
    • January
    • Billinton, R. Vohra, P. K, “Station - Initiated Outages in Composite - System Adequacy Evaluation", IEE Proceedings, Vol. 134, Pt. C, No, 1, January 1987, pp.10-16.
    • (1987) , vol.134 , pp. 10-16
    • Billinton, R.1    Vohra, P.K.2
  • 13
    • 0022134311 scopus 로고
    • Effect of Station Originated Outages in Composite System Adequacy Evaluation of the IEEE Reliability Test System
    • Billinton, R. Vohra, P. K and Kumar, S., “Effect of Station Originated Outages in Composite System Adequacy Evaluation of the IEEE Reliability Test System", IEEE Transactions on Power Apparatus and Systems, PAS-104, 1985, pp. 2649-56.
    • (1985) , pp. 2649-56
    • Billinton, R.1    Vohra, P.K.2    Kumar, S.3
  • 14
    • 0023290646 scopus 로고
    • Modelling and Assessment of Station Originated Outages for Composite Systems Reliabity Evaluation
    • Feb.
    • Allan, R. N., and Ochoa, J. R., “Modelling and Assessment of Station Originated Outages for Composite Systems Reliabity Evaluation", IEEE Transactions on Power Systems, Feb. 1988, Vol. 3, pp. 158-165.
    • (1988) , vol.3 , pp. 158-165
    • Allan, R.N.1    Ochoa, J.R.2
  • 15
    • 0022136521 scopus 로고
    • Graph Theory Concepts in Frequency and Availability Analysis
    • October
    • Kumar, S., and Billinton, R., “Graph Theory Concepts in Frequency and Availability Analysis", IEEE Transactions on Reliability, Vol. R-34, No. 4, 1985 October, 290-294.
    • (1985) , vol.R-34 , Issue.4
    • Kumar, S.1    Billinton, R.2
  • 16
    • 33746114328 scopus 로고
    • Cost of Electric Service Interruptions
    • Electric Utility Systems Planning Issues and Methods, June
    • Wacker G., and Billinton, R., “Cost of Electric Service Interruptions", Proc. of IEEE, Electric Utility Systems Planning Issues and Methods, June 1989.
    • (1989)
    • Wacker, G.1    Billinton, R.2
  • 17
    • 0020221335 scopus 로고
    • Customer Damage Resulting From Electric Service Interruptions
    • R&D Project 907, U131 Report
    • Wacker, G., Woczynski, E., and Billinton, R., “Customer Damage Resulting From Electric Service Interruptions", Canadian Electrical Association, R&D Project 907, U131 Report, 1982.
    • (1982)
    • Wacker, G.1    Woczynski, E.2    Billinton, R.3
  • 18
    • 33747814223 scopus 로고    scopus 로고
    • Ontario Hydro Surveys on Power System Reliability: Summary of Customer Viewpoints
    • R&MR 80-12, EPRI Seminar, October
    • Skof, L. V., “Ontario Hydro Surveys on Power System Reliability: Summary of Customer Viewpoints", Ontario Hydro Report, R&MR 80-12, EPRI Seminar, October 11-13, 1883.
    • Skof, L.V.1
  • 19
    • 84944986695 scopus 로고
    • Evaluation cf Marginal Outage Costs in Electric Power Systems
    • University of Saskatchewan, Canada, Jan.
    • Ghajar, R., “Evaluation cf Marginal Outage Costs in Electric Power Systems", Ph. D. Thesis, University of Saskatchewan, Canada, Jan. 1993.
    • (1993)
    • Ghajar, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.