Bulk power system reliability criteria and indices, trend and future needs
-
February
-
R.J. Ring et al., “Bulk power system reliability criteria and indices, trend and future needs.” IEEE Trans. Power Systems, vol. 9, no. 1, February 1994, pp. 181-190.
-
(1994)
IEEE Trans. Power Systems
, vol.9
, Issue.1
, pp. 181-190
-
-
Ring, R.J.1
-
2
-
-
0024053999
-
Monte Carlo approach in planning studies: An application to IEEE RTS
-
August
-
Bertoldi, L. Salvaderi, and S. Scalcino, “Monte Carlo approach in planning studies: An application to IEEE RTS.” IEEE Trans. Power Systems, vol. 3, no. 3, August 1988, pp. 1146-1154.
-
(1988)
IEEE Trans. Power Systems
, vol.3
, Issue.3
, pp. 1146-1154
-
-
Salvaderi, B.L.1
Scalcino, S.2
-
3
-
-
0027595537
-
A minimum cost assessment method for composite generation and transmission system expansion planning
-
May
-
L. Wenyuan and R. Billinton, “A minimum cost assessment method for composite generation and transmission system expansion planning.” IEEE Trans. Power Systems, vol. 8, no. 2, May 1993, pp. 628-635.
-
(1993)
IEEE Trans. Power Systems
, vol.8
, Issue.2
, pp. 628-635
-
-
Wenyuan, L.1
Billinton, R.2
-
5
-
-
0022108645
-
New probabilistic approach taking into account reliability and operation security in EHV power system planning at EDF
-
August
-
J.C. Dodu and A. Merlin, “New probabilistic approach taking into account reliability and operation security in EHV power system planning at EDF.” IEEE Trans. Power Systems, vol. PWRS-1, no. 3, August 1986, pp. 175-181.
-
(1986)
IEEE Trans. Power Systems
, vol.PWRS-1
, Issue.3
, pp. 175-181
-
-
Dodu, J.C.1
Merlin, A.2
-
6
-
-
0026205965
-
Utilization of interrupted energy assessment rates in generation and transmission system planning
-
August
-
R. Billinton and J. Oteng-Adjei, “Utilization of interrupted energy assessment rates in generation and transmission system planning.” IEEE Trans. Power Systems, vol 6, no. 3, August 1991, pp. 1245-1253.
-
(1991)
IEEE Trans. Power Systems
, vol.6
, Issue.3
, pp. 1245-1253
-
-
Billinton, R.1
Oteng-Adjei, J.2
-
7
-
-
0038580423
-
Recent improvements of the Mexico model for probabilistic planning studies
-
April
-
J.C. Dodu and A. Merlin, “Recent improvements of the Mexico model for probabilistic planning studies.” Electrical Power & Energy Systems, vol. 1, no. 1, April 1979, pp. 46-56.
-
(1979)
Electrical Power & Energy Systems
, vol.1
, Issue.1
, pp. 46-56
-
-
Dodu, J.C.1
Merlin, A.2
-
8
-
-
0021661450
-
Computing fuel savings resulting from a reinforcement of the power transmission system
-
Helsinki
-
J.M. David and A. Hautot. “Computing fuel savings resulting from a reinforcement of the power transmission system.” Proc. Eighth Power Systems Computation Conference, Helsinki, 1984, pp. 78-86.
-
(1984)
Proc. Eighth Power Systems Computation Conference
, pp. 78-86
-
-
David, J.M.1
Hautot, A.2
-
9
-
-
0020194552
-
Cost-effectiveness analysis of substation arrangements
-
October
-
W.J. Lannes, “Cost-effectiveness analysis of substation arrangements.” IEEE Trans. Reliability, vol. R-31 no. 4, October 1982, pp. 404-409.
-
(1982)
IEEE Trans. Reliability
, vol.R-31
, Issue.4
, pp. 404-409
-
-
Lannes, W.J.1
-
10
-
-
0024045322
-
A reliability cost-benefit analysis for HVDC transmission expansion planning
-
July
-
P.R.S. Kuruganty and D.A. Woodford, “A reliability cost-benefit analysis for HVDC transmission expansion planning.” IEEE Trans. Power Delivery, vol. 3, no. 3, July 1988, pp. 1241-1248.
-
(1988)
IEEE Trans. Power Delivery
, vol.3
, Issue.3
, pp. 1241-1248
-
-
Kuruganty, P.R.S.1
Woodford, D.A.2
-
11
-
-
1542267599
-
Bulk power system reliability evaluation, Part I: PROCOSE—A computer program for probabilistic composite system evaluation
-
Toronto, May
-
B. Poretta and D.L. Kiguel, “Bulk power system reliability evaluation, Part I: PROCOSE—A computer program for probabilistic composite system evaluation.” 14th Inter-RAM Conference for the Electric Power Industry, Toronto, May 26-29, 1987.
-
(1987)
14th Inter-RAM Conference for the Electric Power Industry
-
-
Poretta, B.1
Kiguel, D.L.2
-
12
-
-
84899641465
-
Bulk power system reliability evaluation, Part II: Application of PROCOSE for the reliability assessment of the Ontario Hydro West System
-
Toronto, May
-
G.A. Hamoud and E.G. Neudorf, “Bulk power system reliability evaluation, Part II: Application of PROCOSE for the reliability assessment of the Ontario Hydro West System.” 14th Inter-RAM Conference for the Electric Power Industry, Toronto May 26-29, 1987.
-
(1987)
14th Inter-RAM Conference for the Electric Power Industry
-
-
Hamoud, G.A.1
Neudorf, E.G.2
-
14
-
-
0025522133
-
Bulk system reliability - predictive indices
-
November
-
R.N. Allan et al., “Bulk system reliability - predictive indices.” IEEE Trans. Power Systems, vol. 5, no. 4, November 1990, pp. 1204-1213.
-
(1990)
IEEE Trans. Power Systems
, vol.5
, Issue.4
, pp. 1204-1213
-
-
Allan, R.N.1
-
15
-
-
0024718082
-
Bulk system reliability - measurement and indices
-
August
-
C.C. Fong et al., “Bulk system reliability - measurement and indices.” IEEE Trans. Power Systems, vol. 4, no. 2, August 1989, pp. 829-835.
-
(1989)
IEEE Trans. Power Systems
, vol.4
, Issue.2
, pp. 829-835
-
-
Fong, C.C.1
-
18
-
-
84944990090
-
Customer cost of electric interruptions
-
R. Billinton and G. Wacker, “Customer cost of electric interruptions,” IEEE Proceedings, vol. 77, no. 6, 1989.
-
(1989)
IEEE Proceedings
, vol.77
, Issue.6
-
-
Billinton, R.1
Wacker, G.2
-
20
-
-
0026205965
-
Utilization of interrupted energy assessment rates in generation and transmission system planning
-
August
-
R. Billinton and J. Oteng-Adjei, “Utilization of interrupted energy assessment rates in generation and transmission system planning,” IEEE Trans. Power Systems, vol. 6, no. 3, August 1991, pp. 1245-1253.
-
(1991)
IEEE Trans. Power Systems
, vol.6
, Issue.3
, pp. 1245-1253
-
-
Billinton, R.1
Oteng-Adjei, J.2
-
21
-
-
0026257768
-
A procedure for evaluating interrupted energy assessment rates in an overall electric power system
-
November
-
R. Billinton and L. Goel, “A procedure for evaluating interrupted energy assessment rates in an overall electric power system,” IEEE Trans. Power Systems, vol. 6, no. 4, November 1991, pp. 1396-14-03.
-
(1991)
IEEE Trans. Power Systems
, vol.6
, Issue.4
, pp. 1396-14
-
-
Billinton, R.1
Goel, L.2
-
24
-
-
0015681753
-
Reliability evaluation of transmission systems with switching after faults — Approximations and a computer program
-
December
-
J. Endrenyi, P.C. Maenhaut, L.E. Payne, “Reliability evaluation of transmission systems with switching after faults — Approximations and a computer program,” IEEE Trans. Power Apparatus and Systems vol. PAS-92, no. 6, November/December, 1973.
-
(1973)
IEEE Trans. Power Apparatus and Systems vol. PAS-92
, vol.PAS-92
, Issue.6
-
-
Endrenyi, J.1
Maenhaut, P.C.2
Payne, L.E.3
-
27
-
-
0018544097
-
IEEE Reliability Test System
-
IEEE Committee Report, December
-
IEEE Committee Report, “IEEE Reliability Test System.” IEEE Trans. Power Apparatus and Systems vol. PAS-98, no. 6, November/December 1979, pp. 2047-2054.
-
(1979)
IEEE Trans. Power Apparatus and Systems vol. PAS-98
, vol.PAS-98
, Issue.6
, pp. 2047-2054
-
-
|