Volumn 10, Issue 3, 1995, Pages 1667-1675

cost-benefit analysis of power system reliability: TWO utility case studies

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; ELECTRIC LOAD MANAGEMENT; ELECTRIC POWER GENERATION; ELECTRIC POWER TRANSMISSION; ELECTRIC UTILITIES; INDUSTRIAL ECONOMICS; RELIABILITY; SYSTEMS ANALYSIS;

EID: 0029354757     PISSN: 08858950     EISSN: 15580679     Source Type: Journal    
DOI: 10.1109/59.466474     Document Type: Article
Times cited : (83)

References (27)
  • 1
    • 0028372085 scopus 로고
    • Bulk power system reliability criteria and indices, trend and future needs
    • February
    • R.J. Ring et al., “Bulk power system reliability criteria and indices, trend and future needs.” IEEE Trans. Power Systems, vol. 9, no. 1, February 1994, pp. 181-190.
    • (1994) IEEE Trans. Power Systems , vol.9 , Issue.1 , pp. 181-190
    • Ring, R.J.1
  • 2
    • 0024053999 scopus 로고
    • Monte Carlo approach in planning studies: An application to IEEE RTS
    • August
    • Bertoldi, L. Salvaderi, and S. Scalcino, “Monte Carlo approach in planning studies: An application to IEEE RTS.” IEEE Trans. Power Systems, vol. 3, no. 3, August 1988, pp. 1146-1154.
    • (1988) IEEE Trans. Power Systems , vol.3 , Issue.3 , pp. 1146-1154
    • Salvaderi, B.L.1    Scalcino, S.2
  • 3
    • 0027595537 scopus 로고
    • A minimum cost assessment method for composite generation and transmission system expansion planning
    • May
    • L. Wenyuan and R. Billinton, “A minimum cost assessment method for composite generation and transmission system expansion planning.” IEEE Trans. Power Systems, vol. 8, no. 2, May 1993, pp. 628-635.
    • (1993) IEEE Trans. Power Systems , vol.8 , Issue.2 , pp. 628-635
    • Wenyuan, L.1    Billinton, R.2
  • 5
    • 0022108645 scopus 로고
    • New probabilistic approach taking into account reliability and operation security in EHV power system planning at EDF
    • August
    • J.C. Dodu and A. Merlin, “New probabilistic approach taking into account reliability and operation security in EHV power system planning at EDF.” IEEE Trans. Power Systems, vol. PWRS-1, no. 3, August 1986, pp. 175-181.
    • (1986) IEEE Trans. Power Systems , vol.PWRS-1 , Issue.3 , pp. 175-181
    • Dodu, J.C.1    Merlin, A.2
  • 6
    • 0026205965 scopus 로고
    • Utilization of interrupted energy assessment rates in generation and transmission system planning
    • August
    • R. Billinton and J. Oteng-Adjei, “Utilization of interrupted energy assessment rates in generation and transmission system planning.” IEEE Trans. Power Systems, vol 6, no. 3, August 1991, pp. 1245-1253.
    • (1991) IEEE Trans. Power Systems , vol.6 , Issue.3 , pp. 1245-1253
    • Billinton, R.1    Oteng-Adjei, J.2
  • 7
    • 0038580423 scopus 로고
    • Recent improvements of the Mexico model for probabilistic planning studies
    • April
    • J.C. Dodu and A. Merlin, “Recent improvements of the Mexico model for probabilistic planning studies.” Electrical Power & Energy Systems, vol. 1, no. 1, April 1979, pp. 46-56.
    • (1979) Electrical Power & Energy Systems , vol.1 , Issue.1 , pp. 46-56
    • Dodu, J.C.1    Merlin, A.2
  • 8
    • 0021661450 scopus 로고
    • Computing fuel savings resulting from a reinforcement of the power transmission system
    • Helsinki
    • J.M. David and A. Hautot. “Computing fuel savings resulting from a reinforcement of the power transmission system.” Proc. Eighth Power Systems Computation Conference, Helsinki, 1984, pp. 78-86.
    • (1984) Proc. Eighth Power Systems Computation Conference , pp. 78-86
    • David, J.M.1    Hautot, A.2
  • 9
    • 0020194552 scopus 로고
    • Cost-effectiveness analysis of substation arrangements
    • October
    • W.J. Lannes, “Cost-effectiveness analysis of substation arrangements.” IEEE Trans. Reliability, vol. R-31 no. 4, October 1982, pp. 404-409.
    • (1982) IEEE Trans. Reliability , vol.R-31 , Issue.4 , pp. 404-409
    • Lannes, W.J.1
  • 10
    • 0024045322 scopus 로고
    • A reliability cost-benefit analysis for HVDC transmission expansion planning
    • July
    • P.R.S. Kuruganty and D.A. Woodford, “A reliability cost-benefit analysis for HVDC transmission expansion planning.” IEEE Trans. Power Delivery, vol. 3, no. 3, July 1988, pp. 1241-1248.
    • (1988) IEEE Trans. Power Delivery , vol.3 , Issue.3 , pp. 1241-1248
    • Kuruganty, P.R.S.1    Woodford, D.A.2
  • 11
    • 1542267599 scopus 로고
    • Bulk power system reliability evaluation, Part I: PROCOSE—A computer program for probabilistic composite system evaluation
    • Toronto, May
    • B. Poretta and D.L. Kiguel, “Bulk power system reliability evaluation, Part I: PROCOSE—A computer program for probabilistic composite system evaluation.” 14th Inter-RAM Conference for the Electric Power Industry, Toronto, May 26-29, 1987.
    • (1987) 14th Inter-RAM Conference for the Electric Power Industry
    • Poretta, B.1    Kiguel, D.L.2
  • 12
    • 84899641465 scopus 로고
    • Bulk power system reliability evaluation, Part II: Application of PROCOSE for the reliability assessment of the Ontario Hydro West System
    • Toronto, May
    • G.A. Hamoud and E.G. Neudorf, “Bulk power system reliability evaluation, Part II: Application of PROCOSE for the reliability assessment of the Ontario Hydro West System.” 14th Inter-RAM Conference for the Electric Power Industry, Toronto May 26-29, 1987.
    • (1987) 14th Inter-RAM Conference for the Electric Power Industry
    • Hamoud, G.A.1    Neudorf, E.G.2
  • 14
    • 0025522133 scopus 로고
    • Bulk system reliability - predictive indices
    • November
    • R.N. Allan et al., “Bulk system reliability - predictive indices.” IEEE Trans. Power Systems, vol. 5, no. 4, November 1990, pp. 1204-1213.
    • (1990) IEEE Trans. Power Systems , vol.5 , Issue.4 , pp. 1204-1213
    • Allan, R.N.1
  • 15
    • 0024718082 scopus 로고
    • Bulk system reliability - measurement and indices
    • August
    • C.C. Fong et al., “Bulk system reliability - measurement and indices.” IEEE Trans. Power Systems, vol. 4, no. 2, August 1989, pp. 829-835.
    • (1989) IEEE Trans. Power Systems , vol.4 , Issue.2 , pp. 829-835
    • Fong, C.C.1
  • 18
    • 84944990090 scopus 로고
    • Customer cost of electric interruptions
    • R. Billinton and G. Wacker, “Customer cost of electric interruptions,” IEEE Proceedings, vol. 77, no. 6, 1989.
    • (1989) IEEE Proceedings , vol.77 , Issue.6
    • Billinton, R.1    Wacker, G.2
  • 20
    • 0026205965 scopus 로고
    • Utilization of interrupted energy assessment rates in generation and transmission system planning
    • August
    • R. Billinton and J. Oteng-Adjei, “Utilization of interrupted energy assessment rates in generation and transmission system planning,” IEEE Trans. Power Systems, vol. 6, no. 3, August 1991, pp. 1245-1253.
    • (1991) IEEE Trans. Power Systems , vol.6 , Issue.3 , pp. 1245-1253
    • Billinton, R.1    Oteng-Adjei, J.2
  • 21
    • 0026257768 scopus 로고
    • A procedure for evaluating interrupted energy assessment rates in an overall electric power system
    • November
    • R. Billinton and L. Goel, “A procedure for evaluating interrupted energy assessment rates in an overall electric power system,” IEEE Trans. Power Systems, vol. 6, no. 4, November 1991, pp. 1396-14-03.
    • (1991) IEEE Trans. Power Systems , vol.6 , Issue.4 , pp. 1396-14
    • Billinton, R.1    Goel, L.2
  • 24
    • 0015681753 scopus 로고
    • Reliability evaluation of transmission systems with switching after faults — Approximations and a computer program
    • December
    • J. Endrenyi, P.C. Maenhaut, L.E. Payne, “Reliability evaluation of transmission systems with switching after faults — Approximations and a computer program,” IEEE Trans. Power Apparatus and Systems vol. PAS-92, no. 6, November/December, 1973.
    • (1973) IEEE Trans. Power Apparatus and Systems vol. PAS-92 , vol.PAS-92 , Issue.6
    • Endrenyi, J.1    Maenhaut, P.C.2    Payne, L.E.3
  • 27
    • 0018544097 scopus 로고
    • IEEE Reliability Test System
    • IEEE Committee Report, December
    • IEEE Committee Report, “IEEE Reliability Test System.” IEEE Trans. Power Apparatus and Systems vol. PAS-98, no. 6, November/December 1979, pp. 2047-2054.
    • (1979) IEEE Trans. Power Apparatus and Systems vol. PAS-98 , vol.PAS-98 , Issue.6 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.