-
1
-
-
0021484063
-
Performance of hierarchical production scheduling policy
-
CHMT-7
-
AKELLA, R., CHOONG, Y., and GERSHWIN, S. B., 1984, Performance of hierarchical production scheduling policy. IEEE Transactions on Components, Hybrids and Manufacturing Technology, CHMT-7, 225-240.
-
(1984)
IEEE Transactions on Components, Hybrids and Manufacturing Technology
, pp. 225-240
-
-
Akella, R.1
Choong, Y.2
Gershwin, S.B.3
-
2
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
ADAMS, J., BALAS, E., and ZAWACK, D., 1988, The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391-401.
-
(1988)
Management Science
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
3
-
-
34250073986
-
A Tabu Search experience in production scheduling
-
BARNES, J. W., and LAGUNA, M., 1993, A Tabu Search experience in production scheduling. Annals of Operations Research, 41,141-156.
-
(1993)
Annals of Operations Research
, vol.41
, pp. 141-156
-
-
Barnes, J.W.1
Laguna, M.2
-
5
-
-
0003316011
-
Scheduling under resource constraints-e-deterministic models
-
Basel: Baltzer
-
BLAŹEWICZ, J., CELLARY, W., SLOWINSKI, R., and WEGLARZ, J., 1986, Scheduling under resource constraints-e-deterministic models. Annals of Operations Research, 7 (Basel: Baltzer).
-
(1986)
Annals of Operations Research
, vol.7
-
-
Blaźewicz, J.1
Cellary, W.2
Slowinski, R.3
Weglarz, J.4
-
6
-
-
0026417688
-
Branch and bound algorithm for the flow shop with multiple processors
-
BRAH, S. A., and HUNSUCKER, J., 1991, Branch and bound algorithm for the flow shop with multiple processors. European Journal of Operational Research, 51, 88-99.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 88-99
-
-
Brah, S.A.1
Hunsucker, J.2
-
7
-
-
34250084648
-
Routeing and scheduling in a flexible job shop by Tabu Search
-
BRANDIMARTE, P., 1993, Routeing and scheduling in a flexible job shop by Tabu Search. Annals of Operations Research, 41,157-183.
-
(1993)
Annals of Operations Research
, vol.41
, pp. 157-183
-
-
Brandimarte, P.1
-
8
-
-
0003585832
-
-
Reading, MA: Addison Wesley)
-
BROWNE, J., HARHEN, J., and SHIVNAN, J., 1988, Production Management Systems-A CIM Perspective (Reading, MA: Addison Wesley).
-
(1988)
Production Management Systems-A CIM Perspective
-
-
Browne, J.1
Harhen, J.2
Shivnan, J.3
-
9
-
-
0000295157
-
Near optimal manufacturing flow controller design
-
CARAMANIS, M., and SHARIFNIA, A., 1991, Near optimal manufacturing flow controller design. International Journal of Flexible Manufacturing Systems, 3, 321-336.
-
(1991)
International Journal of Flexible Manufacturing Systems
, vol.3
, pp. 321-336
-
-
Caramanis, M.1
Sharifnia, A.2
-
10
-
-
0025725519
-
Scheduling flexible flow shops of no setup cost by a lagrangian relaxation and network reformulation approach
-
Sacramento CA
-
CHANG, S.-C., LIAO, D.-Y., and HSIEH, F.-S., 1991, Scheduling flexible flow shops of no setup cost by a lagrangian relaxation and network reformulation approach. In Proceedings of the 1991 IEEE International Conference on Robotics and Automation, Sacramento CA, 1054-1059.
-
(1991)
Proceedings of the 1991 IEEE International Conference on Robotics and Automation
, pp. 1054-1059
-
-
Chang, S.-C.1
Liao, D.-Y.2
Hsieh, F.-S.3
-
11
-
-
0025595213
-
A methodical approach to the flexible manufacturing system batching, loading and tool configuration problems
-
Co, H. C., BIERMANN, J. S., and CHEN, S. K., 1990, A methodical approach to the flexible manufacturing system batching, loading and tool configuration problems. International Journal of Production Research, 28,2171-2186.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2171-2186
-
-
Co, H.C.1
Biermann, J.S.2
Chen, S.K.3
-
12
-
-
0343908320
-
Scheduling semiconductor lines using a fluid network model
-
RPI, Troy NY
-
CONNORS, D., FEIGIN, G., and YAO, D., 1992, Scheduling semiconductor lines using a fluid network model. In Proceedings of the 3rd IEEE International Conference on Computer Integrated Manufacturing, RPI, Troy NY, 174-183.
-
(1992)
Proceedings of the 3Rd IEEE International Conference on Computer Integrated Manufacturing
, pp. 174-183
-
-
Connors, D.1
Feigin, G.2
Yao, D.3
-
13
-
-
0010490924
-
Work flow control in the flexible flow line
-
DEANE, R. H., and MOON, S. H., 1992, Work flow control in the flexible flow line. International Journal of Flexible Manufacturing Systems, 4, 217-235.
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 217-235
-
-
Deane, R.H.1
Moon, S.H.2
-
14
-
-
34250074609
-
Applying Tabu Search to the job-shop scheduling problem
-
DELL’AMICO, M., and TRUBIAN, M., 1993, Applying Tabu Search to the job-shop scheduling problem. Annals of Operations Research, 41, 231-252.
-
(1993)
Annals of Operations Research
, vol.41
, pp. 231-252
-
-
Dell’Amico, M.1
Trubian, M.2
-
15
-
-
0021481825
-
Multi-stage production with variable lot sizes and transportation of partial lots
-
DREZNER, Z., SZENDROVITS, A. Z., and WESOLOWSKY, G. 0., 1984, Multi-stage production with variable lot sizes and transportation of partial lots. European Journal of Operational Research, 17,227-237.
-
(1984)
European Journal of Operational Research
, vol.17
, pp. 227-237
-
-
Drezner, Z.1
Szendrovits, A.Z.2
Wesolowsky, G.3
-
16
-
-
0002499542
-
The lessons of flowshop scheduling research
-
DUDEK, R. A., PANWALKAR, S. S., and SMITH, M. L., 1992, The lessons of flowshop scheduling research. Operations Research, 40, 7-13.
-
(1992)
Operations Research
, vol.40
, pp. 7-13
-
-
Dudek, R.A.1
Panwalkar, S.S.2
Smith, M.L.3
-
17
-
-
0002373805
-
Production activity control: A practical approach to scheduling
-
DUGGAN, J., and BROWNE, J., 1991, Production activity control: A practical approach to scheduling. International Journal of Flexible Manufacturing Systems, 4,79-103.
-
(1991)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 79-103
-
-
Duggan, J.1
Browne, J.2
-
18
-
-
0026136870
-
Batch production time in a multi-stage system with material handling consideration
-
EGBELU, P. J., 1991, Batch production time in a multi-stage system with material handling consideration. International Journal of Production Research, 29, 695-712.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 695-712
-
-
Egbelu, P.J.1
-
19
-
-
0003055268
-
Preemptive scheduling of uniform machines by ordinary network flow techniques
-
FEDERGRUEN, A., and GROENEVELT, H., 1986, Preemptive scheduling of uniform machines by ordinary network flow techniques. Management Science, 32, 341-349.
-
(1986)
Management Science
, vol.32
, pp. 341-349
-
-
Federgruen, A.1
Groenevelt, H.2
-
23
-
-
0022706976
-
A control theorist’s perspective on recent trends in manufacturing systems
-
GERSHWIN, S. B., HILDEBRANDT, R. R., MITTER, S. K., and SURI, R., 1986, A control theorist’s perspective on recent trends in manufacturing systems. IEEE Control Systems Magazine, 6, 3-15.
-
(1986)
IEEE Control Systems Magazine
, vol.6
, pp. 3-15
-
-
Gershwin, S.B.1
Hildebrandt, R.R.2
Mitter, S.K.3
Suri, R.4
-
25
-
-
0020822392
-
The OPT scheduling system: A review of a new production scheduling system
-
JACOBS, F. R., 1983, The OPT scheduling system: A review of a new production scheduling system. Production and Inventories Management, 47-51.
-
(1983)
Production and Inventories Management
, pp. 47-51
-
-
Jacobs, F.R.1
-
26
-
-
0025430088
-
A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings
-
KIM, Y.-D., 1990, A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings. International Journal of Production Research, 28, 953-962.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 953-962
-
-
Kim, Y.-D.1
-
27
-
-
0027569485
-
Multi-project with explicit lateness costs
-
KIM, S.-Y., and LEACHMAN, R. c., 1993, Multi-project with explicit lateness costs. IIE Transactions, 25, 34-44.
-
(1993)
IIE Transactions
, vol.25
, pp. 34-44
-
-
Kim, S.-Y.1
Leachman, R.C.2
-
28
-
-
0020915621
-
An algorithm for the computer control of production in flexible manufacturing systems
-
KIMEMIA, J. G., and GERSHWIN, S. B., 1983, An algorithm for the computer control of production in flexible manufacturing systems. IIE Transactions, 15, 353-362.
-
(1983)
IIE Transactions
, vol.15
, pp. 353-362
-
-
Kimemia, J.G.1
Gershwin, S.B.2
-
29
-
-
0345901561
-
Sequencing and scheduling: Algorithms and complexity
-
S. C. Graves, A. H. G. Rinnooy Kan, P. H. Zypkin (eds) (North Holland: Elsevier
-
LAWLER, E. L., LENSTRA, J. K., RINNOOY KAN, A. H. G., and SHMOYS, D. B., 1993, Sequencing and scheduling: Algorithms and complexity. In Logistics of Production and Inventory, S. C. Graves, A. H. G. Rinnooy Kan, P. H. Zypkin (eds) (North Holland: Elsevier) pp.445-522.
-
(1993)
Logistics of Production and Inventory
, pp. 445-522
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.3
Shmoys, D.B.4
-
30
-
-
0001829813
-
Modeling techniques for automated production planning in the semiconductor industry
-
T. A. Ciriani and R. C. Leachman (eds) (New York: Wiley
-
LEACHMAN, R. C., 1993, Modeling techniques for automated production planning in the semiconductor industry. In Optimization in Industry T. A. Ciriani and R. C. Leachman (eds) (New York: Wiley).
-
(1993)
Optimization in Industry
-
-
Leachman, R.C.1
-
31
-
-
0024770469
-
Sequencing in an assembly line with blocking to minimize cycle time
-
MCCORMICK, S. T., PINEDO, M. L., SHENKER, S., and WOLF, B., 1989, Sequencing in an assembly line with blocking to minimize cycle time. Operations Research, 37, 925-935.
-
(1989)
Operations Research
, vol.37
, pp. 925-935
-
-
McCormick, S.T.1
Pinedo, M.L.2
Shenker, S.3
Wolf, B.4
-
32
-
-
0001360372
-
Level schedules for mixed-model assembly lines in just-in-time production systems
-
MILTENBURG, J., 1989, Level schedules for mixed-model assembly lines in just-in-time production systems. Management Science, 35, 192-207.
-
(1989)
Management Science
, vol.35
, pp. 192-207
-
-
Miltenburg, J.1
-
33
-
-
0003449926
-
-
(Norcross, GA: Institute of Industrial Engineers Press)
-
MONDEM, T., 1983, Toyota Production System (Norcross, GA: Institute of Industrial Engineers Press).
-
(1983)
Toyota Production System
-
-
Mondem, T.1
-
34
-
-
0023844415
-
Filtered beam search in scheduling
-
Ow, P. S., and MORTON, T. E., 1988, Filtered beam search in scheduling. International Journal of Production Research., 19, 26, 35-62.
-
(1988)
International Journal of Production Research
, vol.19
, Issue.26
, pp. 35-62
-
-
Ow, P.S.1
Morton, T.E.2
-
36
-
-
84974861854
-
Integrating scheduling with batching and lot sizing: A review of algorithms and complexity
-
POTTS, C. N., and VAN WASSENHOVE, L. N., 1992, Integrating scheduling with batching and lot sizing: A review of algorithms and complexity. Journal of the Operational Research Society, 43, 395-406.
-
(1992)
Journal of the Operational Research Society
, vol.43
, pp. 395-406
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
38
-
-
0025419819
-
Modelling and scheduling of a flexible manufacturing system
-
SAWIK, T., 1990, Modelling and scheduling of a flexible manufacturing system. European Journal of Operational Research, 45,177-190.
-
(1990)
European Journal of Operational Research
, vol.45
, pp. 177-190
-
-
Sawik, T.1
-
40
-
-
34249968794
-
Multi-level production scheduling for a class of flexible machining and assembly systems
-
TOCZYLOWSKI, E., HINDI, K. S., and SINGH, M., 1989, Multi-level production scheduling for a class of flexible machining and assembly systems. Annals of Operations Research, 17, 163-180.
-
(1989)
Annals of Operations Research
, vol.17
, pp. 163-180
-
-
Toczylowski, E.1
Hindi, K.S.2
Singh, M.3
-
41
-
-
84911279730
-
DOPP: Dynamically optimized production planning
-
VILLA, A., and ARCOSTANZO, M., 1988, DOPP: Dynamically optimized production planning. International Journal of Production Research, 26, 1637-1650.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 1637-1650
-
-
Villa, A.1
Arcostanzo, M.2
|