|
Volumn , Issue , 1995, Pages 92-97
|
Practical resource scheduling with OPF constraints
a a a a
a
Siemens/Empros
*
|
Author keywords
[No Author keywords available]
|
Indexed keywords
COMPUTER SOFTWARE;
CONVERGENCE OF NUMERICAL METHODS;
ELECTRIC LOAD DISPATCHING;
ELECTRIC LOAD FLOW;
LAGRANGE MULTIPLIERS;
LINEAR PROGRAMMING;
MATHEMATICAL MODELS;
SCHEDULING;
AUGMENTED LAGRANGIAN RELAXATION;
COMMITMENT STAGE;
CONSTRAINED ECONOMIC DISPATCH STAGE;
FUEL CONSTRAINTS;
OPTIMAL POWER FLOW CONSTRAINTS;
RESOURCE SCHEDULING;
ELECTRIC LOAD MANAGEMENT;
|
EID: 0029227154
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (11)
|
References (10)
|