|
Volumn 13, Issue 6, 1994, Pages 393-400
|
A study of factors affecting due-date predictability in a simulated dynamic job shop
|
Author keywords
Due Date Assignment; Dynamic Job Shop; Scheduling; Simulation
|
Indexed keywords
ERGONOMICS;
FORECASTING;
MACHINE SHOPS;
PRODUCTION ENGINEERING;
PRODUCTIVITY;
SCHEDULING;
SIMULATION;
DISPATCHING RULE;
DUE DATE ASSIGNMENT;
DUE DATE PREDICTABILITY;
DYNAMIC JOB SHOP;
SHOP UTILIZATION RATE;
JUST IN TIME PRODUCTION;
|
EID: 0028730645
PISSN: 02786125
EISSN: None
Source Type: Journal
DOI: 10.1016/0278-6125(95)90063-Q Document Type: Article |
Times cited : (26)
|
References (12)
|