메뉴 건너뛰기




Volumn 26, Issue 5, 1994, Pages 44-55

A review of production planning and scheduling models in the semiconductor industry part h: Shop-floor control

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; INDUSTRIAL RESEARCH; INVENTORY CONTROL; KNOWLEDGE BASED SYSTEMS; MATHEMATICAL MODELS; OPTIMAL CONTROL SYSTEMS; PERFORMANCE; PERT; PLANNING; SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0028496979     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408179408966627     Document Type: Article
Times cited : (326)

References (69)
  • 1
    • 0024144243 scopus 로고
    • A Pattern Recognition-based Method for Controlling a Multi-loop Production System
    • Adachi, T., Moodie, C. L., and Talavagc, J. J., “A Pattern Recognition-based Method for Controlling a Multi-loop Production System,” International Journal of Production Research, Vol. 26, No. 12, 1943-1957 (1988).
    • (1988) International Journal of Production Research , vol.26 , Issue.12 , pp. 1943-1957
    • Adachi, T.1    Moodie, C.L.2    Talavagc, J.J.3
  • 2
    • 0023977010 scopus 로고
    • The Shifting Bottleneck Procedure for Job-Shop Scheduling
    • Adams, J., Balas, E., and Zawack, D., ”The Shifting Bottleneck Procedure for Job-Shop Scheduling,” Management Science, Vol. 34, No. 3, 391-401 (1988).
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 3
    • 0001507294 scopus 로고
    • Batching and Scheduling Jobs on Batch and Discrete Processors
    • Ahmadi, J. H., Ahmadi, R. H., Dasu, S., and Tang, C. S., ”Batching and Scheduling Jobs on Batch and Discrete Processors,” Operations Research, Vol. 40, 750-763 (1992).
    • (1992) Operations Research , vol.40 , pp. 750-763
    • Ahmadi, J.H.1    Ahmadi, R.H.2    Dasu, S.3    Tang, C.S.4
  • 4
    • 85034302079 scopus 로고
    • Control of a Batch Processing Machine: A Computational Approach
    • Purdue University, West Lafayette, IN
    • Avramidis, A. N., and Uzsoy, R., “Control of a Batch Processing Machine: A Computational Approach,” School of Industrial Engineering, Purdue University, West Lafayette, IN (1992).
    • (1992) School of Industrial Engineering
    • Avramidis, A.N.1    Uzsoy, R.2
  • 7
    • 0023979312 scopus 로고
    • Theory and Practice of Load-Oriented Manufacturing Control
    • Bechte, W., “Theory and Practice of Load-Oriented Manufacturing Control,” International Journal of Production Research, Vol. 26, No. 3, 375-395 (1988).
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 8
    • 0020783525 scopus 로고
    • The Effect of Workload Dependent Due Dates on Job Shop Performance
    • Bertrand, J. W. M., “The Effect of Workload Dependent Due Dates on Job Shop Performance,” Management Science, Vol. 29, No. 7, 799-816 (1983).
    • (1983) Management Science , vol.29 , Issue.7 , pp. 799-816
    • Bertrand, J.W.M.1
  • 10
    • 84950955577 scopus 로고
    • Chapter 83 of Handbook of Industrial Engineering, G. Salvendy (ed.), J. Wiley
    • Bhaskaran, K., and Pinedo, M., “Dispatching,” Chapter 83 of Handbook of Industrial Engineering, G. Salvendy (ed.), J. Wiley (1991).
    • (1991) Dispatching
    • Bhaskaran, K.1    Pinedo, M.2
  • 11
    • 0023817925 scopus 로고
    • Planning and Scheduling for Epitaxial Wafer Production
    • Bitran, G. R., and Tirupati, D., “Planning and Scheduling for Epitaxial Wafer Production,” Operations Research, Vol. 36, No. 1, 34-49 (1988).
    • (1988) Operations Research , vol.36 , Issue.1 , pp. 34-49
    • Bitran, G.R.1    Tirupati, D.2
  • 12
    • 0024012568 scopus 로고
    • Development and Implementation of a Scheduling System for a Wafer Fabrication Facility
    • Bitran, G., and Tirupati, D., “Development and Implementation of a Scheduling System for a Wafer Fabrication Facility,” Operations Research, Vol. 36, No. 3, 377-395 (1988).
    • (1988) Operations Research , vol.36 , Issue.3 , pp. 377-395
    • Bitran, G.1    Tirupati, D.2
  • 13
    • 0020013653 scopus 로고
    • A State- of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations, ’
    • Blackstone, J. H., Phillips, D. T., and Hogg, G. L., “A State- of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations, ’ ’ International Journal of Production Research, Vol. 20, No. 1, 27-45 (1982).
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 14
    • 84950958727 scopus 로고
    • An Analysis of a Last-StationBottleneck Semiconductor Packaging Line
    • McGill University
    • Chandra, P., and Gupta, S., “An Analysis of a Last-StationBottleneck Semiconductor Packaging Line,” Faculty of Management, McGill University (1992).
    • (1992) Faculty of Management
    • Chandra, P.1    Gupta, S.2
  • 15
  • 16
    • 0027560273 scopus 로고
    • Minimizing Total Completion Time on a Batch Processing Machine with Job Families
    • Chandru, V., Lee, C. Y., and Uzsoy, R., “Minimizing Total Completion Time on a Batch Processing Machine with Job Families,” Operations Research Letters, Vol. 13, 61-65 (1993).
    • (1993) Operations Research Letters , vol.13 , pp. 61-65
    • Chandru, V.1    Lee, C.Y.2    Uzsoy, R.3
  • 17
    • 0024303531 scopus 로고
    • Survey of Scheduling Research Involving Due Date Determination Decisions
    • Cheng, T. C. E., and Gupta, M. C., “Survey of Scheduling Research Involving Due Date Determination Decisions,” European Journal of Operational Research, Vol. 38, 156-166 (1989).
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 19
    • 0001690558 scopus 로고
    • Optimal Control of Batch Service Queues
    • Deb, R. K., and Serfozo, R. F., “Optimal Control of Batch Service Queues,” Advances in Applied Probability, Vol. 5, 340-361 (1973).
    • (1973) Advances in Applied Probability , vol.5 , pp. 340-361
    • Deb, R.K.1    Serfozo, R.F.2
  • 21
    • 84919241140 scopus 로고
    • A Constraint- Based Scheduling System for VLSI Wafer Fabrication
    • J. Browne (ed.), Elsevier Science Publishers
    • Elleby, P., Fargher, H. E., and Addis, T. R., “A Constraint- Based Scheduling System for VLSI Wafer Fabrication,” in Knowledge-Based Production Management Systems, J. Browne (ed.), Elsevier Science Publishers (1989).
    • (1989) Knowledge-Based Production Management Systems
    • Elleby, P.1    Fargher, H.E.2    Addis, T.R.3
  • 22
    • 0026866908 scopus 로고
    • Real-Time Control of Multiproduct Bulk-Service Semiconductor Manufacturing Processes
    • Fowler, J. W., Phillips, D. T., and Hogg, G. L., “Real-Time Control of Multiproduct Bulk-Service Semiconductor Manufacturing Processes,” IEEE Transactions on Semiconductor Manufacturing, Vol. 5, 158-163 (1992).
    • (1992) IEEE Transactions on Semiconductor Manufacturing , vol.5 , pp. 158-163
    • Fowler, J.W.1    Phillips, D.T.2    Hogg, G.L.3
  • 23
    • 84982522109 scopus 로고
    • ISIS-A Knowledge-based System for Factory Scheduling
    • Fox, M. S., and Smith, S. F., “ISIS-A Knowledge-based System for Factory Scheduling,” Expert Systems, Vol. 1, 25-49 (1984).
    • (1984) Expert Systems , vol.1 , pp. 25-49
    • Fox, M.S.1    Smith, S.F.2
  • 29
    • 0013367502 scopus 로고
    • Stabilizing Work-in-Process and Smoothing Production in a Production System with Random Yield
    • University of Texas at AustinMay
    • Gong, L., and Matsuo, H., “Stabilizing Work-in-Process and Smoothing Production in a Production System with Random Yield," The Graduate School of Business, University of Texas at Austin (May 1990).
    • (1990) The Graduate School of Business
    • Gong, L.1    Matsuo, H.2
  • 30
    • 0013367502 scopus 로고
    • A Control Policy for a Manufacturing System with Random Yield and Rework
    • University of Texas at AustinSeptember
    • Gong, L., and Matsuo, H., “A Control Policy for a Manufacturing System with Random Yield and Rework,” The Graduate School of Business, University of Texas at Austin (September 1990).
    • (1990) The Graduate School of Business
    • Gong, L.1    Matsuo, H.2
  • 32
    • 0026944363 scopus 로고
    • Control of Batch Processing Systems in Semiconductor Wafer Fabrication Facilities
    • Gumani, H., Anupindi, R., and Akella, R., “Control of Batch Processing Systems in Semiconductor Wafer Fabrication Facilities,” IEEE Transactions on Semiconductor Manufacturing, Vol. 5, 319-328 (1992).
    • (1992) IEEE Transactions on Semiconductor Manufacturing , vol.5 , pp. 319-328
    • Gumani, H.1    Anupindi, R.2    Akella, R.3
  • 33
    • 0010536701 scopus 로고
    • An Integrated Planning and Scheduling Environment
    • Society of Manufacturing Engineers, Long Beach, CA (October
    • Hadavi, K., and Voigt, K., “An Integrated Planning and Scheduling Environment,” Proceedings Simulation and Artificial Intelligence in Manufacturing, Society of Manufacturing Engineers, Long Beach, CA (October 14-16, 1987).
    • (1987) Proceedings Simulation and Artificial Intelligence in Manufacturing , pp. 14-16
    • Hadavi, K.1    Voigt, K.2
  • 34
    • 38149058172 scopus 로고
    • Scheduling Algorithms for a Single Batch Processing Machine
    • Ikura, Y., and Gimple, M., “Scheduling Algorithms for a Single Batch Processing Machine,” Operations Research Letters, 5, 61-65 (1986).
    • (1986) Operations Research Letters , vol.5 , pp. 61-65
    • Ikura, Y.1    Gimple, M.2
  • 36
    • 0025742409 scopus 로고
    • Issues in the Design of Artificially Intelligent Schedulers
    • Kempf, K., Le Pape, C., Smith, S. F., and Fox, B. R., “Issues in the Design of Artificially Intelligent Schedulers,” A1 Magazine, Vol. 11, No. 5, 37-45 (1991).
    • (1991) A1 Magazine , vol.11 , Issue.5 , pp. 37-45
    • Kempf, K.1    Le Pape, C.2    Smith, S.F.3    Fox, B.R.4
  • 37
    • 0025802324 scopus 로고
    • Artificially Intelligent Schedulers in Manufacturing Practice
    • Kempf, K., Russell, B., Sidhu, S., and Barrett, S., “Artificially Intelligent Schedulers in Manufacturing Practice,” AIMagazine, Vol. 11, No. 5, 46-56 (1991).
    • (1991) Aimagazine , vol.11 , Issue.5 , pp. 46-56
    • Kempf, K.1    Russell, B.2    Sidhu, S.3    Barrett, S.4
  • 38
    • 84950966187 scopus 로고
    • Mean Row Time Minimization in Re-entrant Job Shops with Hub
    • University of Toronto
    • Kubiak, W., Lou, S. X. C., and Wang, Y.-M., “Mean Row Time Minimization in Re-entrant Job Shops with Hub,” Faculty of Management, University of Toronto (1990).
    • (1990) Faculty of Management
    • Kubiak, W.1    Lou, S.X.C.2    Wang, Y.-M.3
  • 39
    • 84950956899 scopus 로고
    • Theory and Applications, forthcoming
    • Kumar, P. R., “Re-Entrant Lines,” Queueing Systems: Theory and Applications, forthcoming (1993).
    • (1993) ” Queueing Systems
    • Kumar, P.R.1
  • 41
    • 3342943539 scopus 로고
    • “A Decision Support System for Shop-Floor Control of Semiconductor Testing Operations
    • Lee, C. Y., Martin-Vega, L. A., Uzsoy, R., and Hinchman, J., “A Decision Support System for Shop-Floor Control of Semiconductor Testing Operations," Journal of Electronics Manufacturing. Vol. 3, 121-131 (1993).
    • (1993) Journal of Electronics Manufacturin , vol.3 , pp. 121-131
    • Le, C.Y.1    Martin-Veg, L.A.2    Uzso, R.3    Hinchma, J.4
  • 42
    • 0026898494 scopus 로고
    • Efficient Algorithms for Scheduling Batch Processing Machines
    • Lee, C. Y., Uzsoy, R., and Martin-Vega, L. A., “Efficient Algorithms for Scheduling Batch Processing Machines,” Operations Research, Vol. 40, 764-775 (1992).
    • (1992) Operations Research , vol.40 , pp. 764-775
    • Lee, C.Y.1    Uzsoy, R.2    Martin-Vega, L.A.3
  • 43
    • 0024765326 scopus 로고
    • A Robust Production Control Policy for VLSI Wafer Fabrication
    • Lou, S. X. C., and Kager, P. W., “A Robust Production Control Policy for VLSI Wafer Fabrication,” IEEE Transactions on Semiconductor Manufacturing, Vol. 2, No. 4, 159-164 (1989).
    • (1989) IEEE Transactions on Semiconductor Manufacturing , vol.2 , Issue.4 , pp. 159-164
    • Lou, S.X.C.1    Kager, P.W.2
  • 44
    • 84950949469 scopus 로고
    • Testing the Robustness of Various Production Control Policies
    • University of Toronto
    • Lou, S. X. C., Yan, H., Sethi, S., Gardel, A., and Deosthali, P., “Testing the Robustness of Various Production Control Policies,” Faculty of Management, University of Toronto (1992).
    • (1992) Faculty of Management
    • Lou, S.X.C.1    Yan, H.2    Sethi, S.3    Gardel, A.4    Deosthali, P.5
  • 46
    • 0026369803 scopus 로고
    • Distributed Scheduling Based on Due Dates and Buffer Priorities,
    • Lu, S. H., and Kumar, P. R., “Distributed Scheduling Based on Due Dates and Buffer Priorities,' ’ IEEE Transactions on Automatic Control, Vol. 36, 1406-1416 (1991).
    • (1991) IEEE Transactions on Automatic Control , vol.36 , pp. 1406-1416
    • Lu, S.H.1    Kumar, P.R.2
  • 48
    • 0002748923 scopus 로고
    • JobShop Scheduling Theory: What is Relevant?
    • McKay, K. N., Safayeni, F. R., and Buzacott, J. A., “JobShop Scheduling Theory: What is Relevant?", Interfaces, Vol. 18. No. 4, 84-90 (1988).
    • (1988) Interfaces , vol.18 , Issue.4 , pp. 84-90
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 49
    • 0024700372 scopus 로고
    • Order Review/Release: Research Issues and Perspectives,
    • Melnyk, S. A., and Ragatz, G. L., “Order Review/Release: Research Issues and Perspectives,' ’ International Journal of Production Research, Vol. 27, No. 7, 1081-1096 (1989).
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1081-1096
    • Melnyk, S.A.1    Ragatz, G.L.2
  • 50
    • 84950942266 scopus 로고
    • Dynamic Scheduling of a Produc- tion/Inventory System with By-Products and Random Yield
    • Massachusetts Institute of TechnologyMay
    • Ou, J., and Wein, L. M., “Dynamic Scheduling of a Produc- tion/Inventory System with By-Products and Random Yield,” Sloan School of Management, Massachusetts Institute of Technology (May 1991).
    • (1991) Sloan School of Management
    • Ou, J.1    Wein, L.M.2
  • 51
    • 0001443508 scopus 로고
    • A Shifting Bottleneck Algorithm for Scheduling Semiconductor Testing Operations
    • Ovacik, I. M., and Uzsoy, R., “A Shifting Bottleneck Algorithm for Scheduling Semiconductor Testing Operations," Journal of Electronics Manufacturing, Vol. 2, 119-134 (1992).
    • (1992) Journal of Electronics Manufacturing , vol.2 , pp. 119-134
    • Ovacik, I.M.1    Uzsoy, R.2
  • 52
    • 0003054955 scopus 로고
    • A Survey of Scheduling Rules
    • Panwalkar, S. S., and Iskander, W., “A Survey of Scheduling Rules,” Operations Research, Vol. 25, No. 1,45-61 (1977).
    • (1977) Operations Research , vol.25 , Issue.1 , pp. 45-61
    • Panwalkar, S.S.1    Iskander, W.2
  • 53
    • 84985757538 scopus 로고
    • An Evaluation of Order Release Mechanisms in a Job Shop Environment
    • Ragatz, G. L., and Mabert, V. A., “An Evaluation of Order Release Mechanisms in a Job Shop Environment,” Decision Sciences. Vol. 19, 167-189 (1988).
    • (1988) Decision Sciences , vol.19 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 54
    • 0024739646 scopus 로고
    • Scheduling Semiconductor Wafer Production: An Expert System Implementation
    • Saveli, D., Perez, R., and Koh, S., “Scheduling Semiconductor Wafer Production: An Expert System Implementation,” IEEE Expert. Vol. 4, No. 3. 9-15 (1989).
    • (1989) IEEE Expert , vol.4 , Issue.3 , pp. 9-15
    • Saveli, D.1    Perez, R.2    Koh, S.3
  • 55
    • 84950932435 scopus 로고
    • Knowledge-Based Production Management: Approaches, Results and Prospects, Center for Integrated Manufacturing Decision Systems
    • Camegie-Mellon University, Pittsburgh, PA
    • Smith, S. F., “Knowledge-Based Production Management: Approaches, Results and Prospects”, Center for Integrated Manufacturing Decision Systems, The Robotics Institute, Camegie-Mellon University, Pittsburgh, PA 15213 (1991).
    • (1991) The Robotics Institute , pp. 15213
    • Smith, S.F.1
  • 59
    • 0002350057 scopus 로고
    • IBM Burlingtons Logistics Management System,"
    • Sullivan, G., and Fordyce, K., “IBM Burlington’s Logistics Management System," Interfaces, Vol. 20, No. 1,43-64 (1990).
    • (1990) Interfaces , vol.20 , Issue.1 , pp. 43-64
    • Sullivan, G.1    Fordyce, K.2
  • 60
    • 0028461472 scopus 로고
    • Scheduling Batch Processing Machines with Nonidentical Job Sizes
    • Uzsoy, R., “Scheduling Batch Processing Machines with Nonidentical Job Sizes,” International Journal of Production Research, Vol. 32, 1615-1635 (1994).
    • (1994) International Journal of Production Research , vol.32 , pp. 1615-1635
    • Uzsoy, R.1
  • 61
    • 0026841915 scopus 로고
    • Scheduling Semiconductor Test Operations: Minimizing Maximum Lateness and Number of Tardy Jobs on a Single Machine
    • Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A., “Scheduling Semiconductor Test Operations: Minimizing Maximum Lateness and Number of Tardy Jobs on a Single Machine,” Naval Research Logistics, Vol. 39, 369-388 (1992).
    • (1992) Naval Research Logistics , vol.39 , pp. 369-388
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 62
    • 84952240555 scopus 로고
    • A Review of Production Planning and Scheduling Models in the Semiconductor Industry Part I: System Characteristics, Performance Evaluation and Production Planning
    • Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A., “A Review of Production Planning and Scheduling Models in the Semiconductor Industry Part I: System Characteristics, Performance Evaluation and Production Planning,” HE Transactions on Scheduling and Logistics, Vol. 24, 47-61 (1992).
    • (1992) HE Transactions on Scheduling and Logistics , vol.24 , pp. 47-61
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 64
    • 0001336436 scopus 로고
    • Improving Local Priority Rules with Global Lead-time Estimates: A Simulation Study,
    • Vepsalainen, A. P. J., and Morton, T. E., “Improving Local Priority Rules with Global Lead-time Estimates: A Simulation Study,' ’ Journal of Manufacturing and Operations Management, Vol. 1, No. 1, 102-118 (1988).
    • (1988) Journal of Manufacturing and Operations Management , vol.1 , Issue.1 , pp. 102-118
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 65
  • 66
    • 0025510925 scopus 로고
    • Scheduling Networks of Queues: Heavy Traffic Approximation of a Two-Station Network with Controllable Inputs, Operations Research, Vol. 38
    • Wein, L. M., “Scheduling Networks of Queues: Heavy Traffic Approximation of a Two-Station Network with Controllable Inputs,” Operations Research, Vol. 38, No. 6, 1065-1078(1990).
    • (1990) Operations Research99 , vol.6 , pp. 1065-1078
    • Wein, L.M.1
  • 67
    • 0001200692 scopus 로고
    • Due-Date Setting and Priority Sequencing in a Multiclass M/G/l Queue
    • Wein, L. M., “Due-Date Setting and Priority Sequencing in a Multiclass M/G/l Queue,” Management Science, Vol. 37, No. 7, 834-850 (1991).
    • (1991) Management Science , vol.37 , Issue.7 , pp. 834-850
    • Wein, L.M.1
  • 68
    • 0026884810 scopus 로고
    • A Broader View of the Job-Shop Scheduling Problem
    • Wein, L. M., and Chevalier, P. B., “A Broader View of the Job-Shop Scheduling Problem, ” Management Science, Vol. 38, No. 7, 1018-1033 (1992).
    • (1992) Management Science , vol.38 , Issue.7 , pp. 1018-1033
    • Wein, L.M.1    Chevalier, P.B.2
  • 69
    • 0002274219 scopus 로고
    • “Input/Output Control: A Real Handle on Lead Time," Production and Inventory Management
    • Wight, O., “Input/Output Control: A Real Handle on Lead Time," Production and Inventory Management. Third Quarter, 9-31 (1970).
    • (1970) Third Quarter , pp. 9-31
    • Wight, O.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.