메뉴 건너뛰기




Volumn 10, Issue 2, 1994, Pages 99-111

Scheduling Products with Bills of Materials using an Improved Lagrangian Relaxation Technique

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; INVENTORY CONTROL; MANUFACTURE; MATHEMATICAL TECHNIQUES;

EID: 0028413489     PISSN: 1042296X     EISSN: None     Source Type: Journal    
DOI: 10.1109/70.282535     Document Type: Article
Times cited : (49)

References (16)
  • 1
    • 0016601948 scopus 로고
    • On improving relaxation methods by modified gradient techniques
    • Amsterdam
    • P. Camerini, L. Fratta, and F. Maffioli, “On improving relaxation methods by modified gradient techniques,” Mathematical Programming Study 3, Amsterdam, pp. 26–34, 1975.
    • (1975) Mathematical Programming Study 3 , pp. 26-34
    • Camerini, P.1    Fratta, L.2    Maffioli, F.3
  • 3
    • 0344007760 scopus 로고
    • A review of production scheduling
    • S. C. Graves, “A review of production scheduling,” Operations Research, vol. 18, pp. 841–852, 1981.
    • (1981) Operations Research , vol.18 , pp. 841-852
    • Graves, S.C.1
  • 4
    • 0345889512 scopus 로고
    • MRP/MRP II
    • A. Rolstadas, Ed. Springer-Verlag
    • J. Harhen, “MRP/MRP II,” in Computer-Aided Production Management, A. Rolstadas, Ed. Springer-Verlag, pp. 23–35, 1988.
    • (1988) Computer-Aided Production Management , pp. 23-35
    • Harhen, J.1
  • 5
    • 0025384041 scopus 로고
    • Scheduling jobs with simple precedence constraints on parallel machines
    • D. Hoitomt, P. Luh, E. Max, and K. Pattipati, “Scheduling jobs with simple precedence constraints on parallel machines,” IEEE Control Systems Magazine, vol. 10, no. 1, pp. 34–40, 1990.
    • (1990) IEEE Control Systems Magazine , vol.10 , Issue.1 , pp. 34-40
    • Hoitomt, D.1    Luh, P.2    Max, E.3    Pattipati, K.4
  • 7
    • 84989682249 scopus 로고
    • Convergence properties of the modified subgradient method of Camerini
    • S. Kim, and H. Ahn, “Convergence properties of the modified subgradient method of Camerini et al.,” Naval Research Logistics, vol. 37, pp. 961–966, 1990.
    • (1990) Naval Research Logistics , vol.37 , pp. 961-966
    • Kim, S.1    Ahn, H.2
  • 11
    • 0002748923 scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • K. N. McKay, F. R. Safayeni, and J. A. Buzacott, “Job-shop scheduling theory: What is relevant?” Interfaces, vol. 18, pp. 84–90, 1988.
    • (1988) Interfaces , vol.18 , pp. 84-90
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 12
    • 0019540666 scopus 로고    scopus 로고
    • Combined scheduling system for reducing job tardiness in a job shop
    • S. Miyazaki, “Combined scheduling system for reducing job tardiness in a job shop,” International Journal of Production Research, vol. 19, no. 2, pp. 201–211.
    • International Journal of Production Research , vol.19 , Issue.2 , pp. 201-221
    • Miyazaki, S.1
  • 15
    • 0027719799 scopus 로고
    • The facet ascending algorithm for integer programming problems
    • San Antonio, Texas, December
    • R. Tomastik and P. B. Luh, “The facet ascending algorithm for integer programming problems” in Proceedings of the 32nd IEEE Conference on Decision and Control, San Antonio, Texas, December 1993, pp. 2880–2884.
    • (1993) Proceedings of the 32nd IEEE Conference on Decision and Control , pp. 2880-2884
    • Tomastik, R.1    Luh, P.B.2
  • 16
    • 85012764422 scopus 로고
    • Advances in the theory and practice of scheduling
    • C. T. Leondes, Ed. San Diego, CA: Academic Press, Inc.
    • K. P. White, Jr., “Advances in the theory and practice of scheduling,” in Advances in Industrial Systems, Control and Dynamic Systems, vol. 37, C. T. Leondes, Ed. San Diego, CA: Academic Press, Inc., 1990, pp. 115–158.
    • (1990) Advances in Industrial Systems, Control and Dynamic Systems , vol.37 , pp. 115-158
    • White, K.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.