-
3
-
-
84939723497
-
Power System Operation and Control
-
ed. A.H.Elabiad), McGraw Hill
-
L.H.Fink: Power System Operation and Control; POWER SYSTEMS ANALYSIS AND PLANNING (ed. A.H.Elabiad), McGraw Hill, 1983, pp.159-86.
-
(1983)
POWER SYSTEMS ANALYSIS AND PLANNING
, pp. 159-186
-
-
Fink, L.H.1
-
5
-
-
0023348490
-
The Role of Plant Control System (Part III, 3 in PES Task Force Report: Power System Restoration)
-
May
-
P.J.Clelland: The Role of Plant Control System (Part III,3 in PES Task Force Report: Power System Restoration); IEEE TRANS. v.PWRS-2 n.2, May 1987, pp. 271-77.
-
(1987)
IEEE TRANS. v
, vol.PWRS-2
, Issue.2
, pp. 271-277
-
-
Clelland, P.J.1
-
7
-
-
0023290946
-
Issues and Problems in Power System Restoration (in PES Task Force Report: System Operations Challenges)
-
M.M.Adibi: Issues and Problems in Power System Restoration (in PES Task Force Report: System Operations Challenges); IEEE TRANS. v.PWRS-3 n.1, 1987, pp.118-26.
-
(1987)
IEEE TRANS. v
, vol.PWRS-3
, Issue.1
, pp. 118-126
-
-
Adibi, M.M.1
-
8
-
-
84939730545
-
discussion of PES Task Force Report: System Operations Challenges
-
J.Feinstein: Discussion of PES Task Force Report: System Operations Challenges; IEEE TRANS. v.PWRS-3 n.1, 1987, pp.118-26.
-
(1987)
IEEE TRANS.
, vol.PWRS-3
, Issue.1
, pp. 118-126
-
-
Feinstein, J.1
-
11
-
-
0023348625
-
Restoration in Sweden and Experience Gained from the Blackout of 1983
-
R.Kearsley: Restoration in Sweden and Experience Gained from the Blackout of 1983; IEEE TRANS. v.PWRS-2 n.2, 1987, pp.422-28.
-
(1983)
IEEE TRANS
, vol.PWRS-2
, Issue.2
, pp. 422-428
-
-
Kearsley, R.1
-
12
-
-
0021479084
-
Blackstart Utilization of Remote Combustion Turbines, Analytical Analysis and Field Tests
-
R.D.Shultz, G.A.Mason: Blackstart Utilization of Remote Combustion Turbines, Analytical Analysis and Field Tests; IEEE TRANS. v.PAS-103 n.8, 1984, pp.2186-91.
-
(1984)
IEEE TRANS.
, vol.PWRS-103
, Issue.8
, pp. 2186-2191
-
-
Shultz, R.D.1
Mason, G.A.2
-
13
-
-
0023348490
-
Reactive Power Balance (Part IV,1 in PES Task Force Report: Power System Restoration)
-
May
-
J. G.Raine: Reactive Power Balance (Part IV,1 in PES Task Force Report: Power System Restoration); IEEE TRANS. v.PWRS-2 n.2, May 1987, pp.271-77.
-
(1987)
IEEE TRANS.
, vol.PWRS-2
, Issue.2
, pp. 271-277
-
-
Raine, G.1
-
14
-
-
0020783018
-
Adaptation of the Simplex Algorithm to Modeling of Cold Load Pickup of a Large Secondary Network Distribution System
-
M.H.Yolcu et al.: Adaptation of the Simplex Algorithm to Modeling of Cold Load Pickup of a Large Secondary Network Distribution System; IEEE TRANS. v.PAS-102 n.7, 1983, pp.2064-68.
-
(1983)
IEEE TRANS.
, vol.PWRS-102
, Issue.2
, pp. 2064-2068
-
-
Yolcu, M.H.1
-
15
-
-
0021455333
-
Malhami: Statistical Synthesis of Physically Based Load Models with Application to Cold Load Pickup
-
C. Y. Chong, R.P.Malhami: Statistical Synthesis of Physically Based Load Models with Application to Cold Load Pickup; IEEE TRANS. v.PAS-103 n.7, 1984, pp.1621-28.
-
(1984)
IEEE TRANS.
, vol.PWRS-103
, Issue.7
, pp. 1621-1628
-
-
Chong, C.Y.1
Malhami, R.P.2
-
17
-
-
0019600493
-
System Restoration Plan Development for a Metropolitan Electric System; (81WM 044–7)
-
R.J.Kafka et al.: System Restoration Plan Development for a Metropolitan Electric System; (81WM 044–7) IEEE TRANS'. v.PAS-100 n.8, 1981, pp.3703-13.
-
(1981)
IEEE TRANS
, vol.PAS-100
, Issue.8
, pp. 3703-3713
-
-
Kafka, R.J.1
-
18
-
-
0023348490
-
PES Task Force Report: Power System Restoration, Parts III, Power System Characteristics
-
May
-
PES Task Force Report: Power System Restoration, Parts III, Power System Characteristics; IEEE TRANS. v.PWRS-2 n.2, May 1987, pp.271-77.
-
(1987)
IEEE TRANS.
, vol.PWRS-2
, Issue.2
, pp. 271-277
-
-
-
19
-
-
0023348490
-
PES Task Force Report: Power System Restoration, Parts II, IV.3, (Strategies)
-
May
-
PES Task Force Report: Power System Restoration, Parts II, IV.3, (Strategies); IEEE TRANS. v.PWRS-2 n.2, May 1987, pp.271-77.
-
(1987)
IEEE TRANS.
, vol.PWRS-2
, Issue.2
, pp. 271-277
-
-
-
21
-
-
0023348490
-
Sequential vs. Parallel Restoration (Part IV,3 in PES Task Force Report: Power System Restoration)
-
May
-
D.Scheurer: Sequential vs. Parallel Restoration (Part IV,3 in PES Task Force Report: Power System Restoration); IEEE TRANS. v.PWRS-2 n.2, May 1987, pp.271-77.
-
(1987)
IEEE TRANS.
, vol.PWRS-2
, Issue.2
, pp. 271-277
-
-
Scheurer, D.1
-
22
-
-
0019637832
-
Low Voltage Bulk Power System Restoration Simulation
-
E.J.Simburger, F.J.Hubert: Low Voltage Bulk Power System Restoration Simulation; IEEE TRANS. v.PAS-100 n.11, 1981, pp.4479-84.
-
(1981)
IEEE TRANS.
, vol.PAS-100
, Issue.11
, pp. 4479-4484
-
-
Simburger, E.J.1
Hubert, F.J.2
-
23
-
-
0021461342
-
Field Experience in Reenergization of Electrical Networks from Thermal and Hydro Units
-
E.Mariani et al.: Field Experience in Reenergization of Electrical Networks from Thermal and Hydro Units; IEEE TRANS. v.PAS-103 n.7, 1984, pp.1707-13.
-
(1984)
IEEE TRANS
, vol.PAS-103
, Issue.7
, pp. 1707-1713
-
-
Mariani, E.1
-
24
-
-
0023346664
-
Policies for Restoration of a Power System
-
J.Gutierrez et al.: Policies for Restoration of a Power System; IEEE TRANS. v.PWRS-2 n.2, May 1987, pp.436-42.
-
(1987)
IEEE TRANS.
, vol.PWRS-2
, Issue.2
, pp. 436-442
-
-
Gutierrez, J.1
-
25
-
-
0021515469
-
Analysis of Overvoltages Caused by Self-Excitation in a Separated Power System With Heavy Load and Large Shunt Capacitance
-
S.Nishida et al.: Analysis of Overvoltages Caused by Self-Excitation in a Separated Power System With Heavy Load and Large Shunt Capacitance; IEEE TRANS. v. PAS-103 n.8, 1984, pp.293-5-42.
-
(1984)
IEEE TRANS.
, vol.PAS-103
, Issue.8
, pp. 2935-2942
-
-
Nishida, S.1
-
26
-
-
84939724516
-
Emergency Plans: Revise, Rewrite, or Leave Them Alone?
-
July
-
S.Mullen: Emergency Plans: Revise, Rewrite, or Leave Them Alone?, ELECTRICAL WORLD, July 1991, p.17.
-
(1991)
ELECTRICAL WORLD
, pp. 17.
-
-
Mullen, S.1
-
28
-
-
0022234948
-
Development of Operator Training Curricula Using the Instructional Systems Development Approach
-
J.P.Smith et al.: Development of Operator Training Curricula Using the Instructional Systems Development Approach; IEEE TRANS. v.PAS-104 n.12, 1985, pp. 3446-52.
-
(1985)
IEEE TRANS.
, vol.PAS-104
, Issue.12
, pp. 3446-3452
-
-
Smith, J.P.1
-
29
-
-
0024718926
-
Development of a Guidance Method for Power System Restoration
-
Y.Kojima, et al.: Development of a Guidance Method for Power System Restoration; IEEE TRANS. v.PWRS-4 n.3, 1989, pp.1219-27.
-
(1989)
IEEE TRANS.
, vol.PWRS-4
, Issue.3
, pp. 1219-1227
-
-
Kojima, Y.1
-
30
-
-
0024719352
-
The Development of Power System Restoration Method for a Bulk Power System by Applying Knowledge Engineering Techniques
-
August
-
Y.Kojima et al.: The Development of Power System Restoration Method for a Bulk Power System by Applying Knowledge Engineering Techniques; IEEE TRANS. v.PWRS-4 n.3, August 1989, pp.1228-35.
-
(1989)
IEEE TRANS.
, vol.PWRS-4
, Issue.3
, pp. 1228-1235
-
-
Kojima, Y.1
-
31
-
-
0026155714
-
Guiding a Power System Restoration with an Expert System
-
May
-
D.S.Kirschen, T.L. Volkmann: Guiding a Power System Restoration with an Expert System; IEEE TRANS. v.PWRS-6 n.2, May 1991, pp.558-66.
-
(1991)
IEEE TRANS.
, vol.PWRS-6
, Issue.2
, pp. 558-566
-
-
Kirschen, D.S.1
Volkmann, T.L.2
-
32
-
-
84939726376
-
Generation Capability Dispatch for Bulk Power System Restoration: A Knowledge-Based Approach
-
C-C.Liu et al.: Generation Capability Dispatch for Bulk Power System Restoration: A Knowledge-Based Approach; 92WM108-1PWRS
-
92WM108-1PWRS
-
-
Liu, C.C.1
|