메뉴 건너뛰기




Volumn 31, Issue 11, 1993, Pages 2531-2545

Product structure complexity and inventory storage capacity on the performance of a multi-level manufacturing system

Author keywords

[No Author keywords available]

Indexed keywords

INVENTORY CONTROL; MATERIALS HANDLING; OPERATIONS RESEARCH; STORAGE (MATERIALS); WAREHOUSES;

EID: 0027694374     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549308956881     Document Type: Article
Times cited : (10)

References (15)
  • 1
    • 84985756865 scopus 로고
    • Product structure complexity and multi-level lot sizing using alternative costing policies
    • Benton, W. C., and Srivastava, R., 1985, Product structure complexity and multi-level lot sizing using alternative costing policies. Decision Sciences, 16(4), 357-369.
    • (1985) Decision Sciences , vol.16 , Issue.4 , pp. 357-369
    • Benton, W.C.1    Srivastava, R.2
  • 2
    • 0002668750 scopus 로고
    • Lot sizing procedures for material requirements planning systems: A framework for analysis
    • Berry, W. L., 1972, Lot sizing procedures for material requirements planning systems: a framework for analysis. Production and Inventory Management, 13,(3)
    • (1972) Production and Inventory Management , vol.13 , Issue.3
    • Berry, W.L.1
  • 3
    • 0040553743 scopus 로고
    • The impact of a rolling schedule in multi-level MRP systems
    • Blackburn, J. D., and Millen, R. A., 1982, The impact of a rolling schedule in multi-level MRP systems. Journal of Operations Management, 1, 125-136.
    • (1982) Journal of Operations Management , vol.1 , pp. 125-136
    • Blackburn, J.D.1    Millen, R.A.2
  • 4
    • 0021410601 scopus 로고
    • Simultaneous lot-sizing and capacity planning in multi-stage assembly processes
    • Blackburn, J. D., and Millen, R. A., 1984, Simultaneous lot-sizing and capacity planning in multi-stage assembly processes. European Journal of Operational Research, 16, 84-93.
    • (1984) European Journal of Operational Research , vol.16 , pp. 84-93
    • Blackburn, J.D.1    Millen, R.A.2
  • 5
    • 0017439919 scopus 로고
    • Lot sizing rules in a hierarchial multistage inventory systems
    • Biggs, J. R., Goodman, S. H., and Hardy, S. T., 1977, Lot sizing rules in a hierarchial multistage inventory systems. Production and Inventory Management, 18(1), 104-115.
    • (1977) Production and Inventory Management , vol.18 , Issue.1 , pp. 104-115
    • Biggs, J.R.1    Goodman, S.H.2    Hardy, S.T.3
  • 6
    • 0000879068 scopus 로고
    • Optimal policies for multi-echelon inventory problem
    • Clark, A. J., and Scarf, H., 1960, Optimal policies for multi-echelon inventory problem. Management Science, 6(4).
    • (1960) Management Science , vol.6 , Issue.4
    • Clark, A.J.1    Scarf, H.2
  • 7
    • 0347344463 scopus 로고
    • Research issues for multi-level lot sizing in MRP systems
    • Collier, D., 1982, Research issues for multi-level lot sizing in MRP systems. Journal of Operations Management, 2.
    • (1982) Journal of Operations Management
    • Collier, D.1
  • 8
    • 0001887653 scopus 로고
    • Dynamic lot size models for multistage assembly systems
    • Crowston, W. B., and Wagner, M. H., 1973, Dynamic lot size models for multistage assembly systems. Management Science, 19(1), 517-527.
    • (1973) Management Science , vol.19 , Issue.1 , pp. 517-527
    • Crowston, W.B.1    Wagner, M.H.2
  • 9
    • 33749286452 scopus 로고
    • A heuristic procedure for the multi-item, single level, limited capacity, lot-sizing problem
    • Dixon, and Silver, E. A., 1981, A heuristic procedure for the multi-item, single level, limited capacity, lot-sizing problem. Journal of Operations Management, 2(1), 23-29.
    • (1981) Journal of Operations Management , vol.2 , Issue.1 , pp. 23-29
    • Dixon1    Silver, E.A.2
  • 10
    • 0012501431 scopus 로고
    • Optimal programming of lot sizes, inventories and labor allocations
    • Dzielinski, B., and Gomory, R., 1965, Optimal programming of lot sizes, inventories and labor allocations. Management Science, 11(9), 875-890.
    • (1965) Management Science , vol.11 , Issue.9 , pp. 875-890
    • Dzielinski, B.1    Gomory, R.2
  • 11
    • 0014856641 scopus 로고
    • Planning tire production
    • Gorenstein, S., 1970, Planning tire production. Management Science, 17(2), 72-82.
    • (1970) Management Science , vol.17 , Issue.2 , pp. 72-82
    • Gorenstein, S.1
  • 12
    • 0002959778 scopus 로고
    • A heuristic algorithm for capacity sensitive requirements planning
    • Harl, J., and Ritzman, L. P., 1985, A heuristic algorithm for capacity sensitive requirements planning. Journal of Operations Management, 6, 309-326.
    • (1985) Journal of Operations Management , vol.6 , pp. 309-326
    • Harl, J.1    Ritzman, L.P.2
  • 13
    • 84910839247 scopus 로고
    • Multi-product production scheduling via extreme point properties of linear programming
    • Kortanek, K. O., Sodaro, D., and Soyster, A. L., 1968, Multi-product production scheduling via extreme point properties of linear programming. Naval Logistics Quarterly, 15, 287-300.
    • (1968) Naval Logistics Quarterly , vol.15 , pp. 287-300
    • Kortanek, K.O.1    Sodaro, D.2    Soyster, A.L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.