-
1
-
-
0019070480
-
A review of standby systems
-
Aug
-
A. Kumar, M. Agarwal, “A review of standby systems”, IEEE Trans. Reliability, vol 29, 1980 Aug, pp 290-294.
-
(1980)
IEEE Trans. Reliability
, vol.29
, pp. 290-294
-
-
Kumar, A.1
Agarwal, M.2
-
2
-
-
0038697780
-
Standby redundancy in reliability: A review
-
Aug
-
R. D. Yearout, P. Reddy, D. L. Grosh, “Standby redundancy in reliability: A review”, IEEE Trans. Reliability, vol 35, 1986 Aug, pp 285-292.
-
(1986)
IEEE Trans. Reliability
, vol.35
, pp. 285-292
-
-
Yearout, R.D.1
Reddy, P.2
Grosh, D.L.3
-
3
-
-
0019479463
-
Analysis of a reparable redundant system with delayed replacement
-
M. Agarwal, A. Kumar, “Analysis of a reparable redundant system with delayed replacement”, Microelectronics & Reliability, vol 21, num 2, 1981, pp 165-171.
-
(1981)
Microelectronics & Reliability
, vol.21
, Issue.2
, pp. 165-171
-
-
Agarwal, M.1
Kumar, A.2
-
4
-
-
0016562735
-
A 2-unit warm standby redundant system with delay and one repair facility
-
Oct
-
P. K. Kapur, K. R. Kapoor, “A 2-unit warm standby redundant system with delay and one repair facility”, IEEE Trans. Reliability, vol 24, 1975 Oct, p 275.
-
(1975)
IEEE Trans. Reliability
, vol.24
, pp. 275
-
-
Kapur, P.K.1
Kapoor, K.R.2
-
5
-
-
0001687830
-
Optimum replacement policies with delay
-
Mar
-
T. Nagakawa, S. Osaki, “Optimum replacement policies with delay”, J. Applied Probability, vol 11, 1974 Mar, pp 102-110.
-
(1974)
J. Applied Probability
, vol.11
, pp. 102-110
-
-
Nagakawa, T.1
Osaki, S.2
-
6
-
-
0024928589
-
On a two-dissimilar-unit standby system with three modes and administrative delay in repair
-
G. S. Mokaddis, S. S. Elias, S. W. Labib, “On a two-dissimilar-unit standby system with three modes and administrative delay in repair”, Microelectronics & Reliability, vol 29, num 4, 1989, pp 511-515.
-
(1989)
Microelectronics & Reliability
, vol.29
, Issue.4
, pp. 511-515
-
-
Mokaddis, G.S.1
Elias, S.S.2
Labib, S.W.3
-
7
-
-
0024909832
-
Stochastic analysis of a two-unit priority cold standby redundant system with administrative delay in repair
-
J. P. Singh Joorel, “Stochastic analysis of a two-unit priority cold standby redundant system with administrative delay in repair”, Microelectronics & Reliability, vol 29, num 4, 1989, pp 489-491.
-
(1989)
Microelectronics & Reliability
, vol.29
, Issue.4
, pp. 489-491
-
-
Singh Joorel, J.P.1
-
8
-
-
46149138454
-
Profit analysis of a two-unit standby system with two types of repair and preventive maintenance
-
L. R. Goel, R. Gupta, A. K. Rasiogi, “Profit analysis of a two-unit standby system with two types of repair and preventive maintenance”, Microelectronics & Reliability, vol 26, num 3, 1986, pp 435-441.
-
(1986)
Microelectronics & Reliability
, vol.26
, Issue.3
, pp. 435-441
-
-
Goel, L.R.1
Gupta, R.2
Rasiogi, A.K.3
-
9
-
-
0021316758
-
Cost analysis in a two-unit standby system with a regular repairman and patience time
-
V. Goyal, K. Murari, “Cost analysis in a two-unit standby system with a regular repairman and patience time”, Microelectronics and Reliability, vol 24 num 3, 1984, pp 453-459.
-
(1984)
Microelectronics and Reliability
, vol.24
, Issue.3
, pp. 453-459
-
-
Goyal, V.1
Murari, K.2
-
10
-
-
0022243603
-
Profit consideration of a 2-unit standby-system with a regular repairman and 2-fold patience time
-
Dec
-
V. Goyal, K. Murari, “Profit consideration of a 2-unit standby-system with a regular repairman and 2-fold patience time”, IEEE Trans. Reliability, vol 34, 1985 Dec, p 544.
-
(1985)
IEEE Trans. Reliability
, vol.34
, pp. 544
-
-
Goyal, V.1
Murari, K.2
-
12
-
-
84947355523
-
The assessment of prior distributions in Bayesian analysis
-
Sep
-
R. L. Winkler, “The assessment of prior distributions in Bayesian analysis”, J. Amer. Statistical Assoc., vol 62, 1967 Sep, pp 777-800.
-
(1967)
J. Amer. Statistical Assoc.
, vol.62
, pp. 777-800
-
-
Winkler, R.L.1
-
13
-
-
84941531117
-
Preference elicitation in reliability engineering
-
Jun 24-26, Warsaw, Poland.
-
A. T. de Almeida, G. A. Bohoris, F. M. C. de Souza, “Preference elicitation in reliability engineering”, IFAC/IFORS/IASA/TIMS Workshop on Support System for Decision and Negotiation Processes, 1992 Jun 24-26, pp 11-16; Warsaw, Poland.
-
(1992)
IFAC/IFORS/IASA/TIMS Workshop on Support System for Decision and Negotiation Processes
, pp. 11-16
-
-
de Almeida, A.T.1
Bohoris, G.A.2
de Souza, F.M.C.3
|