메뉴 건너뛰기




Volumn 42, Issue 3, 1993, Pages 401-407

Decision Theory in Maintenance Strategy for a 2-Unit Redundant Standby System

Author keywords

2 Unit redundant system; Decision theory; Delay time to repair; Maintenance; Multi attribute utility theory; Prior knowledge; Standby system

Indexed keywords

COSTS; DECISION THEORY; DELAY CONTROL SYSTEMS; MAINTENANCE; MATHEMATICAL MODELS; PROBABILITY; REPAIR; SENSITIVITY ANALYSIS; STRATEGIC PLANNING; SYSTEM STABILITY; SYSTEMS ANALYSIS;

EID: 0027666923     PISSN: 00189529     EISSN: 15581721     Source Type: Journal    
DOI: 10.1109/24.257823     Document Type: Article
Times cited : (42)

References (13)
  • 1
    • 0019070480 scopus 로고
    • A review of standby systems
    • Aug
    • A. Kumar, M. Agarwal, “A review of standby systems”, IEEE Trans. Reliability, vol 29, 1980 Aug, pp 290-294.
    • (1980) IEEE Trans. Reliability , vol.29 , pp. 290-294
    • Kumar, A.1    Agarwal, M.2
  • 2
    • 0038697780 scopus 로고
    • Standby redundancy in reliability: A review
    • Aug
    • R. D. Yearout, P. Reddy, D. L. Grosh, “Standby redundancy in reliability: A review”, IEEE Trans. Reliability, vol 35, 1986 Aug, pp 285-292.
    • (1986) IEEE Trans. Reliability , vol.35 , pp. 285-292
    • Yearout, R.D.1    Reddy, P.2    Grosh, D.L.3
  • 3
    • 0019479463 scopus 로고
    • Analysis of a reparable redundant system with delayed replacement
    • M. Agarwal, A. Kumar, “Analysis of a reparable redundant system with delayed replacement”, Microelectronics & Reliability, vol 21, num 2, 1981, pp 165-171.
    • (1981) Microelectronics & Reliability , vol.21 , Issue.2 , pp. 165-171
    • Agarwal, M.1    Kumar, A.2
  • 4
    • 0016562735 scopus 로고
    • A 2-unit warm standby redundant system with delay and one repair facility
    • Oct
    • P. K. Kapur, K. R. Kapoor, “A 2-unit warm standby redundant system with delay and one repair facility”, IEEE Trans. Reliability, vol 24, 1975 Oct, p 275.
    • (1975) IEEE Trans. Reliability , vol.24 , pp. 275
    • Kapur, P.K.1    Kapoor, K.R.2
  • 5
    • 0001687830 scopus 로고
    • Optimum replacement policies with delay
    • Mar
    • T. Nagakawa, S. Osaki, “Optimum replacement policies with delay”, J. Applied Probability, vol 11, 1974 Mar, pp 102-110.
    • (1974) J. Applied Probability , vol.11 , pp. 102-110
    • Nagakawa, T.1    Osaki, S.2
  • 6
    • 0024928589 scopus 로고
    • On a two-dissimilar-unit standby system with three modes and administrative delay in repair
    • G. S. Mokaddis, S. S. Elias, S. W. Labib, “On a two-dissimilar-unit standby system with three modes and administrative delay in repair”, Microelectronics & Reliability, vol 29, num 4, 1989, pp 511-515.
    • (1989) Microelectronics & Reliability , vol.29 , Issue.4 , pp. 511-515
    • Mokaddis, G.S.1    Elias, S.S.2    Labib, S.W.3
  • 7
    • 0024909832 scopus 로고
    • Stochastic analysis of a two-unit priority cold standby redundant system with administrative delay in repair
    • J. P. Singh Joorel, “Stochastic analysis of a two-unit priority cold standby redundant system with administrative delay in repair”, Microelectronics & Reliability, vol 29, num 4, 1989, pp 489-491.
    • (1989) Microelectronics & Reliability , vol.29 , Issue.4 , pp. 489-491
    • Singh Joorel, J.P.1
  • 8
    • 46149138454 scopus 로고
    • Profit analysis of a two-unit standby system with two types of repair and preventive maintenance
    • L. R. Goel, R. Gupta, A. K. Rasiogi, “Profit analysis of a two-unit standby system with two types of repair and preventive maintenance”, Microelectronics & Reliability, vol 26, num 3, 1986, pp 435-441.
    • (1986) Microelectronics & Reliability , vol.26 , Issue.3 , pp. 435-441
    • Goel, L.R.1    Gupta, R.2    Rasiogi, A.K.3
  • 9
    • 0021316758 scopus 로고
    • Cost analysis in a two-unit standby system with a regular repairman and patience time
    • V. Goyal, K. Murari, “Cost analysis in a two-unit standby system with a regular repairman and patience time”, Microelectronics and Reliability, vol 24 num 3, 1984, pp 453-459.
    • (1984) Microelectronics and Reliability , vol.24 , Issue.3 , pp. 453-459
    • Goyal, V.1    Murari, K.2
  • 10
    • 0022243603 scopus 로고
    • Profit consideration of a 2-unit standby-system with a regular repairman and 2-fold patience time
    • Dec
    • V. Goyal, K. Murari, “Profit consideration of a 2-unit standby-system with a regular repairman and 2-fold patience time”, IEEE Trans. Reliability, vol 34, 1985 Dec, p 544.
    • (1985) IEEE Trans. Reliability , vol.34 , pp. 544
    • Goyal, V.1    Murari, K.2
  • 12
    • 84947355523 scopus 로고
    • The assessment of prior distributions in Bayesian analysis
    • Sep
    • R. L. Winkler, “The assessment of prior distributions in Bayesian analysis”, J. Amer. Statistical Assoc., vol 62, 1967 Sep, pp 777-800.
    • (1967) J. Amer. Statistical Assoc. , vol.62 , pp. 777-800
    • Winkler, R.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.