메뉴 건너뛰기




Volumn 31, Issue 9, 1993, Pages 2123-2138

Operational control of a bidirectional automated guided vehicle system

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CRITICAL PATH ANALYSIS; MATHEMATICAL MODELS; SYSTEMS ANALYSIS;

EID: 0027656981     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549308956848     Document Type: Article
Times cited : (70)

References (14)
  • 1
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker, K. R., 1984, Sequencing rules and due-date assignments in a job shop. Management Science, 30 (9), 1093-1104.
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 2
    • 0023560671 scopus 로고
    • Task assignment and load balancing of autonomous vehicles in a flexible manufacturing system
    • RA-3
    • Chen, C. L., Lee, C. S. G., and McGjllem, C. D., 1987, Task assignment and load balancing of autonomous vehicles in a flexible manufacturing system. IEEE Journal of Robotics and Automation, RA-3 (6), 659-671.
    • (1987) IEEE Journal of Robotics and Automation , Issue.6 , pp. 659-671
    • Chen, C.L.1    Lee, C.2    McGjllem, C.D.3
  • 3
    • 0022785934 scopus 로고
    • Potentials for bidirectional guide-path for automated guided vehicle based systems
    • Egbelu, P. J., and Tanchoco, J. M. A., 1986, Potentials for bidirectional guide-path for automated guided vehicle based systems. International Journal of Production Research, 24 (5), 1075-1097.
    • (1986) International Journal of Production Research , vol.24 , Issue.5 , pp. 1075-1097
    • Egbelu, P.J.1    Tanchoco, J.2
  • 4
    • 0024680284 scopus 로고
    • Control of material handling transporter in automated manufacturing
    • Han, M. H., and McGinnis, L. F., 1989, Control of material handling transporter in automated manufacturing. IIE Transactions, 21 (2), 184-190.
    • (1989) IIE Transactions , vol.21 , Issue.2 , pp. 184-190
    • Han, M.H.1    McGinnis, L.F.2
  • 5
    • 0009338739 scopus 로고
    • Optimal flow path design of unidirectional AGV systems
    • Kaspi, M., and Tanchoco, J. M. A, 1990, Optimal flow path design of unidirectional AGV systems. International Journal of Production Research, 28 (6), 1023-1030.
    • (1990) International Journal of Production Research , vol.28 , Issue.6 , pp. 1023-1030
    • Kaspi, M.1    Tanchoco, J.2
  • 7
    • 0026383580 scopus 로고
    • Conflict-free shortest-time bidirectional AGV routing
    • Kim, C. W., and Tanchoco, J. M. A., 1991, Conflict-free shortest-time bidirectional AGV routing. International Journal of Production Research. 29 (12), 2377-2391.
    • (1991) International Journal of Production Research , vol.29 , Issue.12 , pp. 2377-2391
    • Kim, C.W.1    Tanchoco, J.2
  • 10
    • 0022281750 scopus 로고
    • Routing and scheduling of automated guided vehicles
    • H.-J. Bullinger and H. J. Warnecke (eds) (Berlin: Springer-Verlag)
    • Kusiak, A., and Cyrus, J. P., 1985, Routing and scheduling of automated guided vehicles. Toward the Factory of the Future (Proceedings of the 8th ICPR), H.-J. Bullinger and H. J. Warnecke (eds) (Berlin: Springer-Verlag), pp. 247-251.
    • (1985) Toward the Factory of the Future (Proceedings of the 8Th ICPR) , pp. 247-251
    • Kusiak, A.1    Cyrus, J.P.2
  • 11
    • 0343228548 scopus 로고
    • Solving material handling design problems with OR
    • April
    • Maxwell, W. L., 1981, Solving material handling design problems with OR. Industrial Engineering, April, 58-69.
    • (1981) Industrial Engineering , pp. 58-69
    • Maxwell, W.L.1
  • 12
    • 0020140765 scopus 로고
    • Design of automatic guided vehicle systems
    • Maxwell, W. L., and Muckstadt, J. A., 1982, Design of automatic guided vehicle systems. IIE Transactions, 14 (2), 114-124.
    • (1982) IIE Transactions , vol.14 , Issue.2 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 14
    • 0002554762 scopus 로고
    • Determination of the total number of vehicles in an AGV-based material transport system
    • Tanchoco, J. M. A., Egbelu, P. J., and Taghaboni, F., 1987, Determination of the total number of vehicles in an AGV-based material transport system. Material Flow, 4 (1-2), 33-51.
    • (1987) Material Flow , vol.4 , Issue.1-2 , pp. 33-51
    • Tanchoco, J.1    Egbelu, P.J.2    Taghaboni, F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.