메뉴 건너뛰기




Volumn 8, Issue 3, 1993, Pages 1173-1183

A unique multipurpose damping circuit for shunt capacitor bank switching

Author keywords

circuit breakers; metal oxide varistors; shunt capacitor banks; surge arresters; switching; voltage and current transients

Indexed keywords

CAPACITORS; ELECTRIC CURRENTS; ELECTRIC NETWORK SYNTHESIS; ELECTRIC POWER DISTRIBUTION; ELECTRIC POWER SYSTEMS; ELECTRIC SURGES; PARAMETER ESTIMATION; POWER CONTROL; REACTIVE POWER; SWITCHING CIRCUITS; TRANSIENTS; VARISTORS;

EID: 0027632524     PISSN: 08858977     EISSN: 19374208     Source Type: Journal    
DOI: 10.1109/61.252642     Document Type: Article
Times cited : (16)

References (16)
  • 3
    • 26844468019 scopus 로고
    • Evaluation of methods for controlling the overvoltages produced by the energization of a Shunt Capacitor Bank
    • R.P. O'Leary, R.H. Harner : “Evaluation of methods for controlling the overvoltages produced by the energization of a Shunt Capacitor Bank”, 1988 CIGRE session, report 13–05.
    • (1988) CIGRE session, report 13–05
    • O'Leary, R.P.1    Harner, R.H.2
  • 4
    • 0022116728 scopus 로고
    • Synchronous closing control for shunt capacitor banks
    • September
    • R. Alexander : “Synchronous closing control for shunt capacitor banks”, IEEE Transaction-PAS, vol. 104, N° 9, pp. 2619–2626, September 1985.
    • (1985) IEEE Transaction-PAS , vol.104 , Issue.9 , pp. 2619-2626
    • Alexander, R.1
  • 5
    • 85095906590 scopus 로고
    • Synchronous energization of shunt capacitors at 230-kV
    • Presented at the 1978 Winter Meeting, New York, January 29 to February 3, Abstract A78 148–9
    • J. Brunke, G. Schockelt :“Synchronous energization of shunt capacitors at 230-kV”, Presented at the 1978 Winter Meeting, New York, January 29 to February 3, Abstract A78 148–9.
    • (1978)
    • Brunke, J.1    Schockelt, G.2
  • 7
    • 17844376946 scopus 로고
    • Development of controlled switching of reactors, capacitors, transformers and lines
    • A. Holm and al. :“Development of controlled switching of reactors, capacitors, transformers and lines”, 1990 CIGRE session, report 13–201.
    • (1990) CIGRE session, report 13–201
    • Holm, A.1
  • 8
    • 84939722066 scopus 로고
    • Design and installation of 500-kV back-to-back shunt capacitor banks
    • New York, NY, February 3–7 paper 91 WM 241–0 PWRD
    • B. Furumasu, R. Hasibar :“Design and installation of 500-kV back-to-back shunt capacitor banks”, IEEE /PES Winter Power Meeting, New York, NY, February 3–7 1991, paper 91 WM 241–0 PWRD.
    • (1991) IEEE /PES Winter Power Meeting
    • Furumasu, B.1    Hasibar, R.2
  • 9
    • 84939714801 scopus 로고
    • Group 13, discussion of preferential subject 1
    • H. Kempen : CIGRE Proceedings session 1990, Group 13, discussion of preferential subject 1, p15.
    • (1990) CIGRE Proceedings session , pp. 15
    • Kempen, H.1
  • 11
    • 84939704319 scopus 로고
    • Préoccupations d'Hydro-Quebec concernant les performances des disjoncteurs SF6
    • Montreal Septemberpaper 2–04
    • R. Beauchemin, Y. Latour, M. landry, P. Riffon : “Préoccupations d'Hydro-Quebec concernant les performances des disjoncteurs SF6”, CIGRE Symposium Montreal September 1991, paper 2–04.
    • (1991) CIGRE Symposium
    • Beauchemin, R.1    Latour, Y.2    landry, M.3    Riffon, P.4
  • 12
    • 84939707271 scopus 로고
    • Overvoltages occurring in HV/MV distribution substations with shunt capacitor banks when breaking fault currents
    • M. Malaguti, G. Mazza, G. Sani : “Overvoltages occurring in HV/MV distribution substations with shunt capacitor banks when breaking fault currents”, CIRED session 1977, report 1.10.
    • (1977) CIRED session 1977, report 1.10
    • Malaguti, M.1    Mazza, G.2    Sani, G.3
  • 13
    • 33747387194 scopus 로고
    • Controlling the transient currents and overvoltages after the interruption of a fault near shunt capacitor banks
    • A. Janssen, L. Van Der Sluis : “Controlling the transient currents and overvoltages after the interruption of a fault near shunt capacitor banks”, 1988 CIGRE session, report 13–13.
    • (1988) CIGRE session, report 13–13
    • Janssen, A.1    Van Der Sluis, L.2
  • 14
    • 33747416661 scopus 로고
    • Clearing faults near shunt capacitor banks
    • July
    • A. Janssen, L. Van Der Sluis : “Clearing faults near shunt capacitor banks”, IEEE Power Delivery, July 1990, vol 5, n° 3, pp 1346–1354.
    • (1990) IEEE Power Delivery , vol.5 , Issue.3 , pp. 1346-1354
    • Janssen, A.1    Van Der Sluis, L.2
  • 15
    • 84939714198 scopus 로고
    • Effectiveness of pre-insertion inductors for mitigating remote overvollages due to shunt capacito energization
    • Seattle, Washington, July 12–16paper SM 92 495–2 PWRD
    • B. Bhargava, A. H. Khan, A. F. imece, J. DiPietro : “Effectiveness of pre-insertion inductors for mitigating remote overvollages due to shunt capacito energization”, IEEE / PES Summer Meeting, Seattle, Washington, July 12–16 1992, paper SM 92 495–2 PWRD
    • (1992) IEEE / PES Summer Meeting
    • Bhargava, B.1    Khan, A.H.2    imece, A.F.3    DiPietro, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.