-
1
-
-
0025598377
-
Formal development of line-of-balance technique
-
ASCE
-
Al Sarraj, Z. M. (1990). “Formal development of line-of-balance technique.” J Constr. Engrg. and Mgmt., ASCE, 116(4), 689–704.
-
(1990)
J Constr. Engrg. and Mgmt.
, vol.116
, Issue.4
, pp. 689-704
-
-
Al Sarraj, Z.M.1
-
2
-
-
0019064535
-
Construction planning—Beyond critical path
-
ASCE
-
Birrell, G. S. (1980). “Construction planning—Beyond critical path.” J. Constr. Div., ASCE, 106(3), 389–407.
-
(1980)
J. Constr. Div
, vol.106
, Issue.3
, pp. 389-407
-
-
Birrell, G.S.1
-
3
-
-
0021730519
-
The natural disposition of the efficient construction processes
-
Project Management Institute
-
Birrell, G. S. (1984). “’The natural disposition of the efficient construction processes.” Symp. Proc., Project Management Institute, 12–30.
-
(1984)
Symp. Proc.
, pp. 12-30
-
-
Birrell, G.S.1
-
4
-
-
0000981977
-
Planning construction of repetitive building units
-
ASCE
-
Cart, R. I., and Meyer, W. L. (1974). “Planning construction of repetitive building units.” J. Constr. Div., ASCE, 100(3), 403–412.
-
(1974)
J. Constr. Div
, vol.100
, Issue.3
, pp. 403-412
-
-
Cart, R.I.1
Meyer, W.L.2
-
5
-
-
0022917749
-
Application of linear scheduling
-
ASCE
-
Chrzanowski, E. N., and Johnston, D. W. (1986). “Application of linear scheduling.” J. Constr. Engrg. and Mgmt., ASCE, 112(4), 476–491.
-
(1986)
J. Constr. Engrg. and Mgmt
, vol.112
, Issue.4
, pp. 476-491
-
-
Chrzanowski, E.N.1
Johnston, D.W.2
-
6
-
-
0019583188
-
Linear scheduling methods for highway construction
-
ASCE
-
Johnston, D. W. (1981). “Linear scheduling methods for highway construction.” J. Constr. Div., ASCE, 107(2), 247–261.
-
(1981)
J. Constr. Div
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston, D.W.1
-
7
-
-
40849087469
-
-
MS thesis, Concordia University, Montreal, Quebec, Canada
-
Laramee, J. B. (1983). “A planning and scheduling system for high-rise building construction,” MS thesis, Concordia University, Montreal, Quebec, Canada.
-
(1983)
A planning and scheduling system for high-rise building construction
-
-
Laramee, J.B.1
-
8
-
-
0016643558
-
VPM scheduling for high-rise buildings
-
ASCE
-
O’Brien, J. J. (1975). “VPM scheduling for high-rise buildings.” J. Constr. Div., ASCE, 101(4), 895–905.
-
(1975)
J. Constr. Div
, vol.101
, Issue.4
, pp. 895-905
-
-
O’Brien, J.J.1
-
9
-
-
0025447970
-
RPM: Repetitive project modeling
-
ASCE
-
Reda, R. M. (1990). “RPM: Repetitive project modeling.” J. Constr. Engrg. and Mgmt., ASCE, 116(2), 318–330.
-
(1990)
J. Constr. Engrg. and Mgmt
, vol.116
, Issue.2
, pp. 318-330
-
-
Reda, R.M.1
-
11
-
-
0022081905
-
Microcomputers, management, and high-rise construction: The next step
-
Russell, A. D. (1985). “Microcomputers, management, and high-rise construction: The next step.” Can. J. Civ. Engrg., 12(2), 396–414.
-
(1985)
Can. J. Civ. Engrg
, vol.12
, Issue.2
, pp. 396-414
-
-
Russell, A.D.1
-
12
-
-
84929981559
-
REPCON: An innovative construction management system
-
International Council for Building Research Studies and Documentation (Australia), V. Ireland and T. Uher, eds
-
Russell, A. D. (1990). “REPCON: An innovative construction management system.” Managing projects (Int. Symp. on Building Economics and Constr. Mgmt.), International Council for Building Research Studies and Documentation (Australia), V. Ireland and T. Uher, eds., 6, 405–416.
-
(1990)
Managing Projects (Int. Symp. on Building Economics and Constr. Mgmt.)
, vol.6
, pp. 405-416
-
-
Russell, A.D.1
-
13
-
-
0023984188
-
Extensions to linear scheduling optimization
-
ASCE
-
Russell, A. D., and Caselton, W. F. (1988). “Extensions to linear scheduling optimization.” J. Constr. Engrg. and Mgmt., ASCE, 114(1), 36–52.
-
(1988)
J. Constr. Engrg. and Mgmt
, vol.114
, Issue.1
, pp. 36-52
-
-
Russell, A.D.1
Caselton, W.F.2
-
14
-
-
0019030431
-
Construction planning for linear projects
-
ASCE
-
Selinger, S. (1980). “Construction planning for linear projects.” J. Constr. Div., ASCE, 106(2), 195–205.
-
(1980)
J. Constr. Div
, vol.106
, Issue.2
, pp. 195-205
-
-
Selinger, S.1
-
15
-
-
0020178299
-
Time space scheduling method
-
ASCE
-
Stradal, O., and Cacha, J. (1982). “Time space scheduling method.” J. Constr. Div., ASCE, 108(3), 445–457.
-
(1982)
J. Constr. Div
, vol.108
, Issue.3
, pp. 445-457
-
-
Stradal, O.1
Cacha, J.2
|