Volumn 80, Issue 2, 1992, Pages 262-280

On-line power system security analysis

Author keywords

[No Author keywords available]

Indexed keywords

ELECTRIC POWER SYSTEMS - INTERCONNECTION; RISK STUDIES - ASSESSMENT;

EID: 0026818189     PISSN: 00189219     EISSN: None     Source Type: Journal    
DOI: 10.1109/5.123296     Document Type: Article
Times cited : (185)

References (41)
  • 1
    • 84939345058 scopus 로고
    • The other electric company
    • G. D. Friedlander The other electric company IEEE Spectrum 11 6 48 54 1974
    • (1974) IEEE Spectrum , vol.11 , Issue.6 , pp. 48-54
    • Friedlander, G.D.1
  • 2
    • 85143035133 scopus 로고
    • Security application of on-line digital computers
    • H. D. Limmer Security application of on-line digital computers Proc. Second PSCC Proc. Second PSCC Stockholm Sweden 1966-July
    • (1966)
    • Limmer, H.D.1
  • 3
    • 84938002163 scopus 로고
    • The adaptive reliability control system
    • T. E. DyLiacco The adaptive reliability control system IEEE Trans. Parallel Dist. Syst. PAS-86 517 531 1967
    • (1967) IEEE Trans. Parallel Dist. Syst. , vol.PAS-86 , pp. 517-531
    • DyLiacco, T.E.1
  • 4
    • 27744508596 scopus 로고
    • Reliability Concepts in Bulk Power Electric Systems
    • North American Electric Reliability Council
    • Reliability Concepts in Bulk Power Electric Systems 1985 North American Electric Reliability Council
    • (1985)
  • 5
    • 0018161982 scopus 로고
    • Statistical characterizations of power system stability and security
    • CA
    • G. L. Blankenship L. H. Fink Statistical characterizations of power system stability and security Proc. 2nd Lawrence Symp. Systems and Decision Sciences 62 70 Proc. 2nd Lawrence Symp. Systems and Decision Sciences Berkeley CA 1978-Oct.
    • (1978) , pp. 62-70
    • Blankenship, G.L.1    Fink, L.H.2
  • 6
    • 0023290677 scopus 로고
    • Probabilistic steady-state and dynamic security assessment
    • F. F. Wu Y-K. Tsai Y-X. Yu Probabilistic steady-state and dynamic security assessment IEEE Trans. Power Syst. PWRS-3 1 9 1988
    • (1988) IEEE Trans. Power Syst. , vol.PWRS-3 , pp. 1-9
    • Wu, F.F.1    Tsai, Y-K.2    Yu, Y-X.3
  • 7
    • 0020720036 scopus 로고
    • Probabilistic dynamic security assessment of power systems: Part I-basic model
    • F. F. Wu Y-K. Tsai Probabilistic dynamic security assessment of power systems: Part I-basic model IEEE Trans. Circuits Syst. 3 148 159 1983
    • (1983) IEEE Trans. Circuits Syst. , Issue.3 , pp. 148-159
    • Wu, F.F.1    Tsai, Y-K.2
  • 8
    • 0023593826 scopus 로고
    • Reactive load and reserve calculation in real time computer control system
    • J. Feinstein J. Tscherne M. Koenig Reactive load and reserve calculation in real time computer control system IEEE/PFS Proc. PICA 121 127 IEEE/PFS Proc. PICA 1987
    • (1987) , pp. 121-127
    • Feinstein, J.1    Tscherne, J.2    Koenig, M.3
  • 9
    • 0014614602 scopus 로고
    • Security and voltage applications of the public service dispatch computer
    • W. S. Ku P. Van Olinda Security and voltage applications of the public service dispatch computer Proc. IEEE/PES PICA 201 207 Proc. IEEE/PES PICA 1969
    • (1969) , pp. 201-207
    • Ku, W.S.1    Van Olinda, P.2
  • 10
    • 85143025280 scopus 로고
    • Security: Its meanings and objectives
    • IA
    • L. H. Fink Security: Its meanings and objectives Proc. workshop on power system security assessment 35 41 Proc. workshop on power system security assessment Ames IA 1988-Apr.
    • (1988) , pp. 35-41
    • Fink, L.H.1
  • 11
    • 0023291420 scopus 로고
    • Efficient bounding method for linear contingency analysis
    • V. Brandwajn Efficient bounding method for linear contingency analysis IEEE Trans. Power Syst. PWRS-3 38 43 Feb. 1988
    • (1988) IEEE Trans. Power Syst. , vol.PWRS-3 , pp. 38-43
    • Brandwajn, V.1
  • 13
    • 85143025805 scopus 로고
    • Approximate sparse vector techniques for power network solutions
    • WA
    • R. Bacher G. C. Ejebe W. F. Tinney Approximate sparse vector techniques for power network solutions 16th Power Industry Computer Applications (PICA) Conf. 16th Power Industry Computer Applications (PICA) Conf. Seattle WA 1989-May-1-5
    • (1989)
    • Bacher, R.1    Ejebe, G.C.2    Tinney, W.F.3
  • 14
    • 0018919267 scopus 로고
    • Fast contingency evaluation using concentric relaxation
    • J. Zaborsky K. W. Whang K. Prasad Fast contingency evaluation using concentric relaxation IEEE Trans. Power App. Syst. PAS-99 28 36 Jan./Feb. 1980
    • (1980) IEEE Trans. Power App. Syst. , vol.PAS-99 , pp. 28-36
    • Zaborsky, J.1    Whang, K.W.2    Prasad, K.3
  • 15
    • 0020890718 scopus 로고
    • Contingency selection of branch outages causing voltage problems
    • M. G. Lauby T. A. Mikolinnas N. D. Reppen Contingency selection of branch outages causing voltage problems IEEE Trans. Power App. Syst. PAS-102 3899 3904 Dec. 1983
    • (1983) IEEE Trans. Power App. Syst. , vol.PAS-102 , pp. 3899-3904
    • Lauby, M.G.1    Mikolinnas, T.A.2    Reppen, N.D.3
  • 16
    • 4243748334 scopus 로고
    • Transmission system reliability methods
    • Transmission system reliability methods 1-2 July 1982 EL-2526
    • (1982) , vol.1-2
  • 17
    • 84938446439 scopus 로고
    • Iterative linear AC power flow solution for fast approximate outage studies
    • N. M. Peterson W. F. Tinney D. W. Bree Iterative linear AC power flow solution for fast approximate outage studies IEEE Trans. Power App. Syst. PAS-91 2048 2053 Sept./Oct. 1972
    • (1972) IEEE Trans. Power App. Syst. , vol.PAS-91 , pp. 2048-2053
    • Peterson, N.M.1    Tinney, W.F.2    Bree, D.W.3
  • 18
    • 0020003294 scopus 로고
    • Reactive power considerations in automatic contingency selection
    • F. Albuyeh A. Bose B. Heath Reactive power considerations in automatic contingency selection IEEE Trans. Power App. Syst. PAS-101 107 112 Jan. 1982
    • (1982) IEEE Trans. Power App. Syst. , vol.PAS-101 , pp. 107-112
    • Albuyeh, F.1    Bose, A.2    Heath, B.3
  • 19
    • 84862009480 scopus 로고
    • On-line contingency selection for voltage security analysis
    • K. Nara On-line contingency selection for voltage security analysis IEEE Trans. Power App. Syst. PAS-104 847 856 Apr. 1985
    • (1985) IEEE Trans. Power App. Syst. , vol.PAS-104 , pp. 847-856
    • Nara, K.1
  • 20
    • 0023349456 scopus 로고
    • Adaptive reductions for power flow equivalents
    • W. F. Tinney J. M. Bright Adaptive reductions for power flow equivalents IEEE Trans. Power App. Syst. PWRS-2 351 360 May 1987
    • (1987) IEEE Trans. Power App. Syst. , vol.PWRS-2 , pp. 351-360
    • Tinney, W.F.1    Bright, J.M.2
  • 22
    • 0024668301 scopus 로고
    • Complete bounding method for AC contingency screening
    • V. Brandwajn M. G. Lauby Complete bounding method for AC contingency screening IEEE Trans. Power Syst. PWRS-4 724 729 May 1989
    • (1989) IEEE Trans. Power Syst. , vol.PWRS-4 , pp. 724-729
    • Brandwajn, V.1    Lauby, M.G.2
  • 23
    • 85143044580 scopus 로고
    • Adaptive pre-filter for the voltage contingency selection function
    • NY
    • Y. Chen A. Bose Adaptive pre-filter for the voltage contingency selection function IEEE PES Winter Power Meeting IEEE PES Winter Power Meeting New York NY 1989
    • (1989)
    • Chen, Y.1    Bose, A.2
  • 24
    • 0024769945 scopus 로고
    • Faster local power flow solutions: The zero mismatch approach
    • R. Bacher W. F. Tinney Faster local power flow solutions: The zero mismatch approach IEEE Trans. Power Syst. 4 1345 1354 Nov. 1989
    • (1989) IEEE Trans. Power Syst. , vol.4 , pp. 1345-1354
    • Bacher, R.1    Tinney, W.F.2
  • 25
    • 85143027408 scopus 로고
    • Techniques for power network solutions
    • WA
    • R. Bacher W. F. Tinney Techniques for power network solutions Power Industry Computer Applications (PICA) Conf. Power Industry Computer Applications (PICA) Conf. Seattle WA 1989-May-1-5
    • (1989)
    • Bacher, R.1    Tinney, W.F.2
  • 26
    • 85143035892 scopus 로고    scopus 로고
    • Security enhancement system final report
    • Security enhancement system final report RP1712
  • 28
    • 0020765926 scopus 로고
    • Online load flows from a system operator's viewpoint
    • Online load flows from a system operator's viewpoint IEEE Trans. Power Syst. PWRS-102 1818 1822 June 1983
    • (1983) IEEE Trans. Power Syst. , vol.PWRS-102 , pp. 1818-1822
  • 29
    • 0018467775 scopus 로고
    • Linear Programming for Power System Security Applications
    • B. Stott J. L. Marino Linear Programming for Power System Security Applications IEEE Trans. Power Syst. PAS-98 837 848 May 1979
    • (1979) IEEE Trans. Power Syst. , vol.PAS-98 , pp. 837-848
    • Stott, B.1    Marino, J.L.2
  • 30
    • 85143043175 scopus 로고
    • Utility Expands Storm Monitoring
    • Utility Expands Storm Monitoring Electrical World 15 Feb. 1980
    • (1980) Electrical World
  • 32
    • 85143025412 scopus 로고
    • An integrated package for real-time security enhancement
    • WA
    • T. J. Bertram K. D. Demaree L. C. Dangelmaier An integrated package for real-time security enhancement IEEE/PES 1989 PICA Conf. IEEE/PES 1989 PICA Conf. Seattle WA 1989-May-1-5
    • (1989)
    • Bertram, T.J.1    Demaree, K.D.2    Dangelmaier, L.C.3
  • 34
    • 0023592567 scopus 로고
    • Security analysis and optimization
    • B. Stott O. Alsac A. Monticelli Security analysis and optimization Proc. IEEE 75 1623 1644 Dec. 1987
    • (1987) Proc. IEEE , vol.75 , pp. 1623-1644
    • Stott, B.1    Alsac, O.2    Monticelli, A.3
  • 36
    • 84941428499 scopus 로고
    • Security constrained optimal power flow with post-contingency rescheduling
    • A. Monticelli M. V. F. Pereira S. Granville Security constrained optimal power flow with post-contingency rescheduling IEEE Trans. Power Syst. PWRS-2 175 182 Feb. 1987
    • (1987) IEEE Trans. Power Syst. , vol.PWRS-2 , pp. 175-182
    • Monticelli, A.1    Pereira, M.V.F.2    Granville, S.3
  • 38
    • 0000187083 scopus 로고
    • Evaluation of a local DC load flow screening method for branch contingency selection of overloads
    • M. G. Lauby Evaluation of a local DC load flow screening method for branch contingency selection of overloads IEEE Trans. Power Syst. PWRS-3 923 928 Aug. 1988
    • (1988) IEEE Trans. Power Syst. , vol.PWRS-3 , pp. 923-928
    • Lauby, M.G.1
  • 40
    • 0021497228 scopus 로고
    • Bound estimates of severity of line outages in power system analysis and ranking
    • F. D. Galiana Bound estimates of severity of line outages in power system analysis and ranking IEEE Trans. Power Syst. PWRS-103 2612 2622 Sept. 1984
    • (1984) IEEE Trans. Power Syst. , vol.PWRS-103 , pp. 2612-2622
    • Galiana, F.D.1
  • 41
    • 85143028526 scopus 로고
    • Critical review of branch contingency selection methods
    • V. Brandwajn M. G. Lauby Critical review of branch contingency selection methods IFAC Symp. Power Systems and Power Plant Control IFAC Symp. Power Systems and Power Plant Control Seoul Korea 1989-Aug.-22-24
    • (1989)
    • Brandwajn, V.1    Lauby, M.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.