Volumn 6, Issue 2, 1991, Pages 433-441

A Comprehensive Approach For Adequacy And Security Evaluation Of Bulk Power System

Author keywords

[No Author keywords available]

Indexed keywords

ELECTRIC NETWORKS - TRANSIENTS; ELECTRIC POWER TRANSMISSION - LOSSES; PROBABILITY; SYSTEM STABILITY;

EID: 0026153719     PISSN: 08858950     EISSN: 15580679     Source Type: Journal    
DOI: 10.1109/59.76684     Document Type: Article
Times cited : (49)

References (12)
  • 1
    • 0022246040 scopus 로고
    • A Comparison Between Two Fundamentally Different Approaches to Composite System Reliability Evaluation
    • December
    • L. Salvaderi, R. Billinton, “A Comparison Between Two Fundamentally Different Approaches to Composite System Reliability Evaluation,” IEEE Transactions, PAS-104, December 1985, pp. 3486–3492.
    • (1985) IEEE Transactions , vol.PAS-104 , pp. 3486-3492
    • Salvaderi, L.1    Billinton, R.2
  • 2
    • 0022133805 scopus 로고
    • Composite Generation and Transmission Reliability Evaluation in Large Hydroelectric Systems
    • October
    • S. H. F. Cunha, M.V.F. Pereira, L.M.V.C. Pinto, G. C. Oliveira, “Composite Generation and Transmission Reliability Evaluation in Large Hydroelectric Systems,” IEEE Transactions, PAS-104, October 1985, pp. 2657–2664.
    • (1985) IEEE Transactions , vol.PAS-104 , pp. 2657-2664
    • Cunha, S.H.F.1    Pereira, M.V.F.2    Pinto, L.M.V.C.3    Oliveira, G.C.4
  • 3
    • 84941861139 scopus 로고
    • Adequacy Evaluation of a Composite Power System - A Comparative Study of Existing Computer Programs
    • Paper 85-SP-141, Montreal, March
    • R. Billinton, S. Kumar, “Adequacy Evaluation of a Composite Power System - A Comparative Study of Existing Computer Programs,” Transactions of CEA, Engineering and Operating Division, Vol. 24, Part 3, Paper 85-SP-141, Montreal, March, 1985.
    • (1985) Transactions of CEA, Engineering and Operating Division , vol.24
    • Billinton, R.1    Kumar, S.2
  • 4
    • 0022108645 scopus 로고
    • New Probabilistic Approach Taking into Account Reliability and Operation Security in EHV Power System Planning at EDF
    • August
    • J. C. Dodu, A. Merlin, “New Probabilistic Approach Taking into Account Reliability and Operation Security in EHV Power System Planning at EDF,” IEEE Transactions, PWRS-1, No. 3, August 1986, pp. 175–181.
    • (1986) IEEE Transactions , vol.PWRS-1 , Issue.3 , pp. 175-181
    • Dodu, J.C.1    Merlin, A.2
  • 5
    • 0022108524 scopus 로고
    • Bulk Power System Reliability Assessment Experience With the RECS Program
    • August
    • A. P. Meliopoulos, A.G. Bakirtizis, R.R. Kovacs, R. J. Beck, “Bulk Power System Reliability Assessment Experience With the RECS Program,” IEEE Transactions, PWRS-1, No. 3, August 1986, pp 235–243.
    • (1986) IEEE Transactions , vol.PWRS-1 , Issue.3 , pp. 235-243
    • Meliopoulos, A.P.1    Bakirtizis, A.G.2    Kovacs, R.R.3    Beck, R.J.4
  • 8
    • 0023290405 scopus 로고
    • Bulk Power System Reliability Concepts and Applications
    • Task Force on Bulk Power System Reliability of Probability Methods Subcommittee,February
    • Task Force on Bulk Power System Reliability of Probability Methods Subcommittee, “Bulk Power System Reliability Concepts and Applications,” IEEE Transactions, Vol. PWRS-3, No. 1, February 1988, pp. 109–117.
    • (1988) IEEE Transactions , vol.PWRS-3 , Issue.1 , pp. 109-117
  • 9
    • 0023290459 scopus 로고
    • Requirements for Composite System Reliability Evaluation Models
    • February
    • M. P. Bhavaraju, R. Billinton, N. D. Reppen, F.J. Ringlee, P.F. Albrecht, “Requirements for Composite System Reliability Evaluation Models,” IEEE Transactions, Vol. PWRS-3, No. 1, February 1988, pp. 149–157.
    • (1988) IEEE Transactions , vol.PWRS-3 , Issue.1 , pp. 149-157
    • Bhavaraju, M.P.1    Billinton, R.2    Reppen, N.D.3    Ringlee, F.J.4    Albrecht, P.F.5
  • 10
    • 85095912304 scopus 로고
    • Concepts for Composite System Reliability Applied to the Two-Area Planning Problem
    • Paper A79 New York February
    • B. Porretta, “Concepts for Composite System Reliability Applied to the Two-Area Planning Problem,” IEEE PES Winter Meeting, Paper A79, February 1979.
    • (1979) IEEE PES Winter Meeting , vol.109
    • Porretta, B.1
  • 11
    • 0018544097 scopus 로고
    • IEEE Reliability Test System
    • IEEE Committee Report, November/December
    • IEEE Committee Report, “IEEE Reliability Test System,” IEEE Transactions on PAS, Vol. PAS-98, No. 6, November/December 1979, pp. 2047–2054.
    • (1979) IEEE Transactions on PAS , vol.PAS-98 , Issue.6 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.