메뉴 건너뛰기




Volumn 28, Issue 12, 1990, Pages 2219-2242

Quality control in a single state production system: Open and closed loop policies

Author keywords

[No Author keywords available]

Indexed keywords

MAINTENANCE--OPTIMIZATION; MATHEMATICAL STATISTICS; MATHEMATICAL TECHNIQUES--LEAST SQUARES APPROXIMATIONS;

EID: 0025669388     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549008942863     Document Type: Article
Times cited : (9)

References (63)
  • 1
    • 0020590182 scopus 로고
    • Designof attribute control charts for multi-stage production systems-based on cost criteria
    • ADULBAHN, P., TANG, J. C. S., and BOONDISKULCHOK, R., 1983, Designof attribute control charts for multi-stage production systems-based on cost criteria. Computers and Industrial Engineering, 7, 79-99.
    • (1983) Computers and Industrial Engineering , vol.7 , pp. 79-99
    • Adulbahn, P.1    Tang, J.2    Boondiskulchok, R.3
  • 2
    • 0017417159 scopus 로고
    • A bayesian approach to the optimal control of continuous industrial processes
    • ALBRIGHT, S. C, and COLLINS, R. S., 1977, A bayesian approach to the optimal control of continuous industrial processes. International Journal of Production Research, 15, 37-45.
    • (1977) International Journal of Production Research , vol.15 , pp. 37-45
    • Albright, S.C.1    Collins, R.S.2
  • 3
    • 0022162362 scopus 로고
    • Selectionof the most economical production plan in a tool-wear process
    • ARCELUS, F. J., and BANERJEE, P. K., 1985, Selectionof the most economical production plan in a tool-wear process. Technometrics, 27, 433-437.
    • (1985) Technometrics , vol.27 , pp. 433-437
    • Arcelus, F.J.1    Banerjee, P.K.2
  • 4
    • 0020140865 scopus 로고
    • Optimal production run for a normally distributed quality characteristic exhibiting non-negative shifts in process mean and variance
    • ARCELUS, F. J., BANERJEE, P. K., and CHANDRA, R., 1982, Optimal production run for a normally distributed quality characteristic exhibiting non-negative shifts in process mean and variance. IIE Transactions, 14, 90-98.
    • (1982) IIE Transactions , vol.14 , pp. 90-98
    • Arcelus, F.J.1    Banerjee, P.K.2    Chandra, R.3
  • 5
    • 84985822431 scopus 로고
    • Designing inspection strategies for uncertain environments
    • BALLOU, D. P., and PAZER, H. L., 1987, Designing inspection strategies for uncertain environments. Decision Sciences, 18, 217-233.
    • (1987) Decision Sciences , vol.18 , pp. 217-233
    • Ballou, D.P.1    Pazer, H.L.2
  • 8
    • 0005382717 scopus 로고
    • Some statistical aspects of adaptive optimization and control
    • Box, G. E. P., and JENKINS, G. M., 1962, Some statistical aspects of adaptive optimization and control. Journal of the Royal Statistical Society B, 24, 297-331.
    • (1962) Journal of the Royal Statistical Society B , vol.24 , pp. 297-331
    • Box, G.1    Jenkins, G.M.2
  • 9
    • 0000096788 scopus 로고
    • Optimal screening plans for non-serial production systems
    • BRITNEY, R. R., 1972, Optimal screening plans for non-serial production systems. Management Science, 18, 550-559.
    • (1972) Management Science , vol.18 , pp. 550-559
    • Britney, R.R.1
  • 10
    • 1242264153 scopus 로고
    • A bayesian approach to quality control
    • CARTER, P. L., 1972, A bayesian approach to quality control. Management Science, 18, 647-655.
    • (1972) Management Science , vol.18 , pp. 647-655
    • Carter, P.L.1
  • 11
    • 0021140211 scopus 로고
    • Optimal estimation of linear discrete-time systems with stochastic parameters
    • DE KONING, W. L., 1984, Optimal estimation of linear discrete-time systems with stochastic parameters. Automatica, 20, 113-115.
    • (1984) Automatica , vol.20 , pp. 113-115
    • De Koning, W.L.1
  • 13
    • 0000058150 scopus 로고
    • A sampling inspection plan for continuous production
    • DODGE, H. F., 1943, A sampling inspection plan for continuous production. Annals of Mathematical Statistics, 14, 264-279.
    • (1943) Annals of Mathematical Statistics , vol.14 , pp. 264-279
    • Dodge, H.F.1
  • 14
    • 0018005425 scopus 로고
    • The economic design of p-charts to maintain current control of a process: Some numerical results
    • DUNCAN, A. J., 1978, The economic design of p-charts to maintain current control of a process: Some numerical results. Technometrics, 20, 235-243.
    • (1978) Technometrics , vol.20 , pp. 235-243
    • Duncan, A.J.1
  • 15
    • 0016048858 scopus 로고
    • Optimal location of inspection stations in a multi-stage production process
    • EPPEN, G. D., and HURST, E. G. Jr., 1974, Optimal location of inspection stations in a multi-stage production process. Management Science, 20, 1194-1200.
    • (1974) Management Science , vol.20 , pp. 1194-1200
    • Eppen, G.D.1    Hurst, E.G.2
  • 16
    • 0022792327 scopus 로고
    • Quality improvement and learning in productive systems
    • FINE, C; 1986, Quality improvement and learning in productive systems. Management Science, 32, 1301-1315.
    • (1986) Management Science , vol.32 , pp. 1301-1315
    • Fine, C.1
  • 17
    • 0001769328 scopus 로고
    • Optimal control of processes subject to linear trends
    • GIBRA, I. N., 1967, Optimal control of processes subject to linear trends. Journal of Industrial Engineering, 18, 35-41.
    • (1967) Journal of Industrial Engineering , vol.18 , pp. 35-41
    • Gibra, I.N.1
  • 18
    • 0009808535 scopus 로고
    • Economic design of attribute control charts for multiple assignable causes
    • GIBRA, I. N., 1981, Economic design of attribute control charts for multiple assignable causes. Journal of Quality Technology, 13,93-99.
    • (1981) Journal of Quality Technology , vol.13 , pp. 93-99
    • Gibra, I.N.1
  • 20
    • 0021437507 scopus 로고
    • Dynamic programming analysis of special multi-stage inspection systems
    • GRACIADIAZ, A., FOSTER, J. W., and BONYUET, M., 1984, Dynamic programming analysis of special multi-stage inspection systems. AIIE Transactions, 16, 115-126.
    • (1984) AIIE Transactions , vol.16 , pp. 115-126
    • Graciadiaz, A.1    Foster, J.W.2    Bonyuet, M.3
  • 23
    • 0016345630 scopus 로고
    • On unknown state-dependent noise, modelling errors, and adaptive filtering
    • (North Hollywood, California: Western Periodicals
    • HAMPTON, R. L. T., 1974, On unknown state-dependent noise, modelling errors, and adaptive filtering. Proceedings of the Fourth Symposium on Non-Linear Estimation Theory and its Applications (North Hollywood, California: Western Periodicals), 102-106.
    • (1974) Proceedings of the Fourth Symposium on Non-Linear Estimation Theory and Its Applications , pp. 102-106
    • Hampton, R.1
  • 24
    • 0018292494 scopus 로고
    • An optimal quality control design for a single-product serial manufacturing system
    • HASSAN, M. Z., and KNOWLES, T. W., 1979, An optimal quality control design for a single-product serial manufacturing system. Journal of Quality Technology, 11, 20-27.
    • (1979) Journal of Quality Technology , vol.11 , pp. 20-27
    • Hassan, M.Z.1    Knowles, T.W.2
  • 26
    • 84939007907 scopus 로고
    • An innovations approach to least squares estimation. Part I: Linear filtering with additive noise
    • AC-13
    • KAILATH, T., 1968, An innovations approach to least squares estimation. Part I: Linear filtering with additive noise. IEEE Transactions on Automatic Control, AC-13, 646-655.
    • (1968) IEEE Transactions on Automatic Control , pp. 646-655
    • Kailath, T.1
  • 27
    • 85024429815 scopus 로고
    • A new approach to linear filtering and prediction problems. Transactions of the ASME
    • KALMAN, R. E., 1960, A new approach to linear filtering and prediction problems. Transactions of the ASME, Journal of Basic Engineering, 820, 35-45.
    • (1960) Journal of Basic Engineering , vol.820 , pp. 35-45
    • Kalman, R.E.1
  • 28
    • 0016940646 scopus 로고
    • A smoothed bayes control procedure for the control of a variable quality characteristic with linear shift
    • KAMAT, S. J., 1976, A smoothed bayes control procedure for the control of a variable quality characteristic with linear shift. Journal of Quality Technology, 8, 98-104.
    • (1976) Journal of Quality Technology , vol.8 , pp. 98-104
    • Kamat, S.J.1
  • 30
    • 0000140746 scopus 로고
    • Allocation of screening inspection effort-a dynamic programming approach
    • LINDSAY, G. F., and BISHOP, A. B., 1964, Allocation of screening inspection effort-a dynamic programming approach. Management Science, 10, 342-352.
    • (1964) Management Science , vol.10 , pp. 342-352
    • Lindsay, G.F.1    Bishop, A.B.2
  • 31
    • 0020751745 scopus 로고
    • On the problem of optimization of a quality inspection process structure
    • LUBICZ, M., 1983, On the problem of optimization of a quality inspection process structure. International Journal of Production Research, 21, 369-381.
    • (1983) International Journal of Production Research , vol.21 , pp. 369-381
    • Lubicz, M.1
  • 32
    • 0023420338 scopus 로고
    • On product liability and quality control
    • MARUCHECK, A. S., 1987, On product liability and quality control. IIE Transactions, 19, 355-360.
    • (1987) IIE Transactions , vol.19 , pp. 355-360
    • Marucheck, A.S.1
  • 33
    • 0023439341 scopus 로고
    • Warnings of malfunction: The decision to inspect and maintain production processes on schedule or on demand
    • PATE-CORNELL, M. E., LEE, H. L., and TAGARAS, G., 1987, Warnings of malfunction: The decision to inspect and maintain production processes on schedule or on demand. Management Science, 33, 1277-1290.
    • (1987) Management Science , vol.33 , pp. 1277-1290
    • Pate-Cornell, M.E.1    Lee, H.L.2    Tagaras, G.3
  • 34
    • 0023313761 scopus 로고
    • Economic design of quality monitoring efforts for multi-stage production systems
    • PETERS, M. H., and WILLIAMS, W. W., 1987, Economic design of quality monitoring efforts for multi-stage production systems. IIE Transactions, 19, 81-87.
    • (1987) IIE Transactions , vol.19 , pp. 81-87
    • Peters, M.H.1    Williams, W.W.2
  • 35
    • 0020191840 scopus 로고
    • Quality evaluation plan using adaptive kalman filtering
    • PHADKE, M. S., 1982, Quality evaluation plan using adaptive kalman filtering. The Bell System Technical Journal, 61, 2081-2107.
    • (1982) The Bell System Technical Journal , vol.61 , pp. 2081-2107
    • Phadke, M.S.1
  • 36
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • PORTEUS, E. L., 1986, Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137-144.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 38
    • 0010828109 scopus 로고
    • A dynamic programming application in production line inspection
    • PRUZAN, P. M., and JACKSON, J.T. R., 1967, A dynamic programming application in production line inspection. Technometrics, 9, 73-81.
    • (1967) Technometrics , vol.9 , pp. 73-81
    • Pruzan, P.M.1    Jackson, J.2
  • 41
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • ROSENBLATT, M. J., and LEE, H. L., 1986, Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 42
    • 0000113607 scopus 로고
    • Quality control under markovian deterioration
    • Ross, S. M., 1971, Quality control under markovian deterioration. Management Science, 17, 587-596.
    • (1971) Management Science , vol.17 , pp. 587-596
    • Ross, S.M.1
  • 45
    • 0042367935 scopus 로고
    • A learning model for processes with tool wear
    • SMITH, B. E., and VEMUGANTI, R. R., 1968, A learning model for processes with tool wear. Technometrics, 10, 379-387.
    • (1968) Technometrics , vol.10 , pp. 379-387
    • Smith, B.E.1    Vemuganti, R.R.2
  • 46
    • 0019709656 scopus 로고
    • Widhelm and Lessing revisited: An alternative markovian model for processing systems with imperfect review
    • STRATHIE, E. J., SINCLAIR, M. A., and PETTIT, A. N., 1981, Widhelm and Lessing revisited: An alternative markovian model for processing systems with imperfect review. AIIE Transactions, 13, 363-370.
    • (1981) AIIE Transactions , vol.13 , pp. 363-370
    • Strathie, E.J.1    Sinclair, M.A.2    Pettit, A.N.3
  • 47
    • 0024063983 scopus 로고
    • An integrated cost model for the joint optimization of process control and maintenance
    • TAGARAS, G., 1988, An integrated cost model for the joint optimization of process control and maintenance. The Journal of the Operational Research Society, 39, 757-766.
    • (1988) The Journal of the Operational Research Society , vol.39 , pp. 757-766
    • Tagaras, G.1
  • 48
    • 0023599080 scopus 로고
    • Acceptance sampling in serial production systems
    • Wisconsin: American Society for Quality Control
    • TAGARAS, G., and LEE, H. L., 1987, Acceptance sampling in serial production systems. ASQC Quality Congress Transactions-Minneapolis (Wisconsin: American Society for Quality Control), pp. 120-124.
    • (1987) ASQC Quality Congress Transactions-Minneapolis , pp. 120-124
    • Tagaras, G.1    Lee, H.L.2
  • 49
    • 0022754098 scopus 로고
    • Quality control by the optimal control ofa discrete-state stochastic process
    • TAPIERO, C. S., 1986, Quality control by the optimal control ofa discrete-state stochastic process. International Journal of Production Research, 24, 927-937.
    • (1986) International Journal of Production Research , vol.24 , pp. 927-937
    • Tapiero, C.S.1
  • 50
    • 0023594221 scopus 로고
    • Production learning and quality control
    • TAPIERO, C. S., 1987, Production learning and quality control. IIE Transactions, 19, 362-370.
    • (1987) IIE Transactions , vol.19 , pp. 362-370
    • Tapiero, C.S.1
  • 52
    • 0024030627 scopus 로고
    • Quality control of an unreliable random FMS: With Bernoulli and CPS sampling
    • TAPIERO, C. S., and Hsu, L.-F., 1988, Quality control of an unreliable random FMS: With Bernoulli and CPS sampling. International Journal of Production Research, 26, 1125-1135.
    • (1988) International Journal of Production Research , vol.26 , pp. 1125-1135
    • Tapiero, C.S.1    Hsu, L.-F.2
  • 53
    • 0023347716 scopus 로고
    • Product failures, manufacturing reliability and quality control: A dynamic framework
    • TAPIERO, C. S., REISMAN, A., and RITCHKEN, P., 1987, Product failures, manufacturing reliability and quality control: A dynamic framework. INFOR, 25,152-164.
    • (1987) INFOR , vol.25 , pp. 152-164
    • Tapiero, C.S.1    Reisman, A.2    Ritchken, P.3
  • 55
    • 0001606041 scopus 로고
    • Markovian sequential replacement processes
    • TAYLOR, H. M. 1965, Markovian sequential replacement processes. Annals of Mathematical Statistics, 36, 1677-1694.
    • (1965) Annals of Mathematical Statistics , vol.36 , pp. 1677-1694
    • Taylor, H.M.1
  • 56
    • 0016114215 scopus 로고
    • An on-line computational model for inspection resource allocation
    • TRIPPI, R., 1974, An on-line computational model for inspection resource allocation. Journal of Quality Technology, 6, 167-174.
    • (1974) Journal of Quality Technology , vol.6 , pp. 167-174
    • Trippi, R.1
  • 57
    • 0016510980 scopus 로고
    • The warehouse location formulation as a special type of inspection problem
    • TRIPPI, R., 1975, The warehouse location formulation as a special type of inspection problem. Management Science, 21, 986-988.
    • (1975) Management Science , vol.21 , pp. 986-988
    • Trippi, R.1
  • 58
    • 0010945943 scopus 로고
    • The analysis of a simple class of multi-stage inspection plans
    • WHITE, L. S., 1966, The analysis of a simple class of multi-stage inspection plans. Management Science, 12, 685-693.
    • (1966) Management Science , vol.12 , pp. 685-693
    • White, L.S.1
  • 59
    • 0010820352 scopus 로고
    • Shortest route models for the allocation of inspection effort on a production line
    • WHITE, L. S., 1969, Shortest route models for the allocation of inspection effort on a production line. Management Science, 15, 249-259.
    • (1969) Management Science , vol.15 , pp. 249-259
    • White, L.S.1
  • 60
    • 0016962510 scopus 로고
    • A markovian model for processing systems with imperfect review
    • WIDHELM, W. S., and LESSING, R., 1976, A markovian model for processing systems with imperfect review. AIIE Transactions, 8, 248-257.
    • (1976) AIIE Transactions , vol.8 , pp. 248-257
    • Widhelm, W.S.1    Lessing, R.2
  • 61
    • 0003131458 scopus 로고
    • Optimum allocation of inspection effort in multi-stage manufacturing processes
    • Woo, W. K., and METCALFE, J. E., 1972, Optimum allocation of inspection effort in multi-stage manufacturing processes. Western Electric Engineering, 16, 8-16.
    • (1972) Western Electric Engineering , vol.16 , pp. 8-16
    • Woo, W.K.1    Metcalfe, J.E.2
  • 62
    • 0019657928 scopus 로고
    • The optional allocation of inspection effort in a class of nonserial production systems
    • YUM, B. J., and MCDOWELL, E. D., 1981, The optional allocation of inspection effort in a class of nonserial production systems. AIIE Transactions, 13, 285-293.
    • (1981) AIIE Transactions , vol.13 , pp. 285-293
    • Yum, B.J.1    McDowell, E.D.2
  • 63
    • 0023435379 scopus 로고
    • Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach
    • YUM, B. J., and MCDOWELL, E. D., 1987, Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach. International Journal of Production Research, 25, 1451-1464.
    • (1987) International Journal of Production Research , vol.25 , pp. 1451-1464
    • Yum, B.J.1    McDowell, E.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.