|
Volumn Pi, Issue , 1990, Pages 889-898
|
New techniques and quality control find success in enhancing productivity and minimizing proppant flowback
a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
OIL WELL PRODUCTION--ENHANCED RECOVERY;
PETROLEUM RESERVOIR ENGINEERING;
FORCED CLOSURE TECHNIQUE;
PROPPANT FLOWBACK MINIMIZATION;
WELL STIMULATION;
OIL WELLS;
|
EID: 0025646850
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (40)
|
References (11)
|