Optimum seeking with branch and bound
-
Agin, N. (1966). “Optimum seeking with branch and bound.” Mgmt. Sci., 4(13), 176–185.
-
(1966)
Mgmt. Sci
, vol.4
, Issue.13
, pp. 176-185
-
-
Agin, N.1
-
2
-
-
0009771003
-
-
thesis presented to the University of California, at Berkeley, Calif., in partial fulfillment of the requirements for the degree of Doctor of Philosophy
-
Chang, T. C. (1987). “Network resource allocation using an expert system with fuzzy logic reasoning,” thesis presented to the University of California, at Berkeley, Calif., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
-
(1987)
Network Resource Allocation Using an Expert System with Fuzzy Logic Reasoning
-
-
Chang, T.C.1
-
3
-
-
0025200146
-
An algorithm for solving expected possibility and its application in construction resource allocation
-
Chang, T. C., and Crandall, K. C. (1990). “An algorithm for solving expected possibility and its application in construction resource allocation.” Fuzzy Sets and Systems.
-
(1990)
Fuzzy Sets and Systems
-
-
Chang, T.C.1
Crandall, K.C.2
-
4
-
-
84930117027
-
Priority ranking—A fuzzy expert system for priority decision making in building construction resource scheduling
-
Chang, T. C., and Ibbs, C. W. (1989). “Priority ranking—A fuzzy expert system for priority decision making in building construction resource scheduling.” Build. Envir.
-
(1989)
Build. Envir
-
-
Chang, T.C.1
Ibbs, C.W.2
-
5
-
-
84974329439
-
A fuzzy logic system for expert systems
-
Chang, T. C., Ibbs, C. W., and Crandall, K. C. (1989). “A fuzzy logic system for expert systems.” Artif. Intell. for Engrg. Design, Anal, and Manufacturing (AI EDAM), 2(3), 83–193.
-
(1989)
Artif. Intell. for Engrg. Design, Anal, and Manufacturing (AI EDAM)
, vol.2
, Issue.3
, pp. 83-193
-
-
Chang, T.C.1
Ibbs, C.W.2
Crandall, K.C.3
-
6
-
-
0022325158
-
Resource allocation with project manager control
-
C. W. Ibbs, ed., ASCE
-
Crandall, K. C. (1985),. “Resource allocation with project manager control.” Construction research applied to practice, C. W. Ibbs, ed., ASCE, 1–17.
-
(1985)
Construction Research Applied to Practice
, pp. 1-17
-
-
Crandall, K.C.1
-
7
-
-
0015725454
-
Project scheduling under resource constraints: Historical review and categorization of procedures
-
Davis, E. W. (1973). “Project scheduling under resource constraints: Historical review and categorization of procedures.” AIIE Trans., 5(4), 297–313.
-
(1973)
AIIE Trans
, vol.5
, Issue.4
, pp. 297-313
-
-
Davis, E.W.1
-
8
-
-
84909749918
-
Networks: Resource allocation
-
Davis, E. W. (1974). “Networks: Resource allocation.” J. Ind. Engrg., 6(4), 117–120.
-
(1974)
J. Ind. Engrg
, vol.6
, Issue.4
, pp. 117-120
-
-
Davis, E.W.1
-
9
-
-
0016520377
-
Project network summary measures and constrained resource scheduling
-
Davis, E. W. (1975). “Project network summary measures and constrained resource scheduling.” AIIE Trans., 7(2), 132–142.
-
(1975)
AIIE Trans
, vol.7
, Issue.2
, pp. 132-142
-
-
Davis, E.W.1
-
10
-
-
0000813734
-
An algorithm for optimal project scheduling under multiple resource constraints
-
Davis, E. W., and Heidom, G. E. (1971). “An algorithm for optimal project scheduling under multiple resource constraints.” Mgmt. Sci., 17(12), 803–816.
-
(1971)
Mgmt. Sci
, vol.17
, Issue.12
, pp. 803-816
-
-
Davis, E.W.1
Heidom, G.E.2
-
11
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
Davis, E. W., and Patterson, J. H. (1975a). “A comparison of heuristic and optimum solutions in resource-constrained project scheduling.” Mgmt. Sci., 21(8), 944–955.
-
(1975)
Mgmt. Sci
, vol.21
, Issue.8
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
12
-
-
0343918516
-
Resource-based project scheduling: Which rules perform best?
-
Davis, E. W., and Patterson, J. H. (1975b). “Resource-based project scheduling: Which rules perform best?” Project Mgmt. Q., 6(4), 25–31.
-
(1975)
Project Mgmt. Q
, vol.6
, Issue.4
, pp. 25-31
-
-
Davis, E.W.1
Patterson, J.H.2
-
15
-
-
0003676781
-
-
thesis presented to the Massachusetts Institute of Technology, at Cambridge, Mass., in partial fulfillment of the requirements for the degree of Doctor of Philosophy
-
Johnson, T. J. R. (1967). “An algorithm for the resource constrained project scheduling problem,” thesis presented to the Massachusetts Institute of Technology, at Cambridge, Mass., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
-
(1967)
An Algorithm for the Resource Constrained Project Scheduling Problem
-
-
Johnson, T.1
-
16
-
-
84930127425
-
-
thesis presented to Stanford University, at Stanford, Calif., in partial fulfillment of the requirements for the degree of Doctor of Philosophy
-
Patton, G. T. (1968). “Optimal scheduling of resource constrained projects,” thesis presented to Stanford University, at Stanford, Calif., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
-
(1968)
Optimal Scheduling of Resource Constrained Projects
-
-
Patton, G.T.1
-
17
-
-
0000478729
-
Solving resource-constrained network problems by impact enumeration-non-preemptive case
-
Schrage, L. (1970). “Solving resource-constrained network problems by impact enumeration-non-preemptive case.” Oper. Res., 18(2), 263–278.
-
(1970)
Oper. Res
, vol.18
, Issue.2
, pp. 263-278
-
-
Schrage, L.1
-
19
-
-
0018011301
-
Multiple resource-constrained scheduling using branch and bound
-
Stinson, J. P., Davis, E. W., and Khumawala, B. M. (1978). “Multiple resource-constrained scheduling using branch and bound.” AIIE Trans., 10(3), 252–259.
-
(1978)
AIIE Trans
, vol.10
, Issue.3
, pp. 252-259
-
-
Stinson, J.P.1
Davis, E.W.2
Khumawala, B.M.3
-
20
-
-
84930140889
-
-
Working Paper No. 200, Grad. School of Business Administration, Univ. of Michigan, Ann Arbor, Mich
-
Talbot, F. B. (1980). “Project scheduling with resource-duration interactions: The nonpreemptive case.” Working Paper No. 200, Grad. School of Business Administration, Univ. of Michigan, Ann Arbor, Mich.
-
(1980)
Project Scheduling with Resource-Duration Interactions: The Nonpreemptive Case
-
-
Talbot, F.B.1
-
21
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
-
Talbot, F. B., and Patterson, J. H. (1978). “An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems.” Mgmt. Sci., 24(11), 1163–1174.
-
(1978)
Mgmt. Sci
, vol.24
, Issue.11
, pp. 1163-1174
-
-
Talbot, F.B.1
Patterson, J.H.2
-
22
-
-
0343918512
-
Optimal methods for scheduling project under resource constraints
-
Talbot, F. B., and Patterson, J. H. (1979). “Optimal methods for scheduling project under resource constraints.” Project Mgmt. Q., 10(4), 26–33.
-
(1979)
Project Mgmt. Q
, vol.10
, Issue.4
, pp. 26-33
-
-
Talbot, F.B.1
Patterson, J.H.2
-
23
-
-
84930122122
-
Heuristic project scheduling
-
Thesen, A. (1978). “Heuristic project scheduling.” Project Mgmt. Q., 9(1), 23–29.
-
(1978)
Project Mgmt. Q
, vol.9
, Issue.1
, pp. 23-29
-
-
Thesen, A.1
-
24
-
-
0001694940
-
A heuristic model for scheduling large projects with limited resources
-
Weist, J. D. (1967). “A heuristic model for scheduling large projects with limited resources.” Mgmt. Sci., 13(6), 337–359.
-
(1967)
Mgmt. Sci
, vol.13
, Issue.6
, pp. 337-359
-
-
Weist, J.D.1
-
25
-
-
84930142123
-
Planning networks and resource allocation
-
Woodgate, H. S. (1968). “Planning networks and resource allocation.” DATAMATION, Jan., 36–43.
-
(1968)
DATAMATION, Jan
, pp. 36-43
-
-
Woodgate, H.S.1
-
26
-
-
84989436573
-
A heuristic algorithm for resource levelling in multi-project, multi-resource scheduling
-
Woodworth, B. M., and Willie, C. J. (1975). “A heuristic algorithm for resource levelling in multi-project, multi-resource scheduling.” Decision Sci., 6(3), 525–540.
-
(1975)
Decision Sci
, vol.6
, Issue.3
, pp. 525-540
-
-
Woodworth, B.M.1
Willie, C.J.2
-
27
-
-
3242857538
-
A time constrained approach to resource levelling in multi-project scheduling
-
Woodworth, B. M., and Willie, C. J. (1976). “A time constrained approach to resource levelling in multi-project scheduling.” Project Mgmt. Q., 7(2), 26–33.
-
(1976)
Project Mgmt. Q
, vol.7
, Issue.2
, pp. 26-33
-
-
Woodworth, B.M.1
Willie, C.J.2
-
28
-
-
34248666540
-
Fuzzy sets
-
Zadeh, L. A. (1965). “Fuzzy sets.” Inf. Control, 8(3), 338–353.
-
(1965)
Inf. Control
, vol.8
, Issue.3
, pp. 338-353
-
-
Zadeh, L.A.1
-
29
-
-
34250406938
-
Fuzzy logic and approximate reasoning
-
Zadeh, L. A. (1975). “Fuzzy logic and approximate reasoning.” Synthese, 30(3/4), 407–428.
-
(1975)
Synthese
, vol.30
, Issue.3-4
, pp. 407-428
-
-
Zadeh, L.A.1
-
30
-
-
85082277205
-
Possibility theory and soft data analysis
-
L. Cobb and R. M. Thrall, eds., Westview Press, Inc., Boulder, Colo.
-
Zadeh, L. A. (1981). “Possibility theory and soft data analysis.” Mathematical frontiers of the social and policy sciences, L. Cobb and R. M. Thrall, eds., Westview Press, Inc., Boulder, Colo., 69–129.
-
(1981)
Mathematical Frontiers of the Social and Policy Sciences
, pp. 69-129
-
-
Zadeh, L.A.1
-
31
-
-
0020843799
-
The role of fuzzy logic in the management of uncertainty in expert systems
-
Zadeh, L. A. (1983). “The role of fuzzy logic in the management of uncertainty in expert systems.” Fuzzy Sets and Systems, 11(3), 199–227.
-
(1983)
Fuzzy Sets and Systems
, vol.11
, Issue.3
, pp. 199-227
-
-
Zadeh, L.A.1
|