메뉴 건너뛰기




Volumn 19, Issue 1-3, 1990, Pages 189-199

Medium to short term finite capacity scheduling: A planning methodology for capacity constrained workshops

Author keywords

[No Author keywords available]

Indexed keywords

INVENTORY CONTROL--MANAGEMENT; PRODUCTION ENGINEERING--PLANNING; SCHEDULING;

EID: 0025433556     PISSN: 0167188X     EISSN: None     Source Type: Journal    
DOI: 10.1016/0167-188X(90)90042-G     Document Type: Article
Times cited : (14)

References (22)
  • 3
    • 0020013653 scopus 로고
    • A state-of-art survey of dispatching rules for manufacturing jobshop operations
    • (1982) Int. J. Prod. Res. , vol.20 , Issue.1 , pp. 27-45
    • Blackstone1
  • 8
    • 0019617819 scopus 로고
    • A model to examine the effect of loading conditions on scheduling rules in a jobshop environment
    • (1981) Int. J. Prod. Res. , vol.19 , Issue.5 , pp. 577-587
    • Das1    Dowsland2
  • 9
    • 0020783093 scopus 로고
    • New attention for computer scheduling of multi-product plants working batchwise under constraints
    • (1983) Int. J. Prod. Res. , vol.21 , Issue.4 , pp. 499-509
    • Durand1    Silver2
  • 10
    • 0022120120 scopus 로고
    • Decision support systems aid in management of operations
    • September
    • (1985) Ind. Eng. , pp. 26-34
    • Leary1
  • 17
  • 19
    • 0022186482 scopus 로고
    • Basic production techniques for small manufacturers: HI, Production planning, control and scheduling methods
    • 4th quarter
    • (1985) Prod. Inv. Manage. , pp. 14-26
    • Chrisman1
  • 20
    • 0021424669 scopus 로고
    • A comparative study of priority dispatching rules in a hybrid assembly/jobshop
    • (1984) Int. J. Prod. Res. , vol.22 , Issue.3 , pp. 375-387
    • Huang1
  • 21
    • 0022810264 scopus 로고
    • Production problems with deadline penalties
    • (1986) Int. J. Prod. Res. , vol.24 , Issue.6 , pp. 1383-1394
    • Hall1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.