메뉴 건너뛰기




Volumn 5, Issue 1, 1990, Pages 46-52

Forward contracts for the operation of an electricity industry under spot pricing

Author keywords

electricity pricing; forward contracts; power system operation under uncertainty; risk management

Indexed keywords

ELECTRIC POWER SYSTEMS--ECONOMICS;

EID: 0025387454     PISSN: 08858950     EISSN: 15580679     Source Type: Journal    
DOI: 10.1109/59.49085     Document Type: Article
Times cited : (97)

References (9)
  • 1
    • 0023401946 scopus 로고
    • Power System Planning under Spot Pricing
    • August
    • T W Berrie, “Power System Planning under Spot Pricing,” IEEE Transactions on Power Systems, vol. PWRS-2, pp. 744-750, August 1987.
    • (1987) IEEE Transactions on Power Systems , vol.PWRS-2 , pp. 744-750
    • Berrie, T.W.1
  • 6
    • 84941536766 scopus 로고
    • A Theory of Electricity Tariff Design for Optimal Operation and Investment
    • paper no. 88SM666-0, July
    • R J Kaye, H. R. Outhred, “A Theory of Electricity Tariff Design for Optimal Operation and Investment,” IEEE PES Summer Meeting, paper no. 88SM666-0, July 1988.
    • (1988) IEEE PES Summer Meeting
    • Kaye, R.J.1    Outhred, H.R.2
  • 7
    • 84941536767 scopus 로고
    • Advanced Techniques for Energy Management in Industry
    • Uni of NSW, Dept. of Elec. Pow. Eng. Report DEPE 88.020, June
    • H R Outhred, R. J. Kaye, C. H. Bannister, “Advanced Techniques for Energy Management in Industry,” Uni of NSW, Dept. of Elec. Pow. Eng. Report DEPE 88.020, June1988.
    • (1988)
    • Outhred, H.R.1    Kaye, R.J.2    Bannister, C.H.3
  • 9
    • 84941536768 scopus 로고
    • Eds. Load Management, New York: IEEE Press
    • S Talukdar, C. W. Gellings, Eds. Load Management, New York: IEEE Press, 1987.
    • (1987)
    • Talukdar, S.1    Gellings, C.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.