|
Volumn 4, Issue 4, 1989, Pages 1381-1388
|
Assessing the dollar price tag for meeting the nerc 10-minute reserve rule
b b |
Author keywords
Generation cost; operational planning; reliability; short term; spinning reserve; ten minute reserve
|
Indexed keywords
ELECTRIC POWER GENERATION--COSTS;
ELECTRIC POWER PLANTS--STANDBY SERVICE;
ELECTRIC UTILITIES--OPERATIONS RESEARCH;
LOAD CONTINGENCY;
OPERATIONAL PLANNING;
POWER GENERATION RELIABILITY;
SHORT-TERM POWER GENERATION RESERVES;
SPINNING RESERVE;
TEN-MINUTE RESERVE;
ELECTRIC POWER SYSTEMS;
|
EID: 0024764749
PISSN: 08858950
EISSN: 15580679
Source Type: Journal
DOI: 10.1109/59.41688 Document Type: Article |
Times cited : (6)
|
References (5)
|