-
1
-
-
0023290459
-
Requirements for Composite System Reliability Evaluation Models
-
February
-
Bhavaraju, M.P., R. Billinton, N.D. Reppen, R.J. Ringlee, and P.F. Albrecht, “Requirements for Composite System Reliability Evaluation Models,” IEEE Transactions on Power Systems, Volume 3, No. 1, February 1988, pp. 149 — 157.
-
(1988)
IEEE Transactions on Power Systems
, vol.3
, Issue.1
, pp. 149-157
-
-
Bhavaraju, M.P.1
Billinton, R.2
Reppen, N.D.3
Ringlee, R.J.4
Albrecht, P.F.5
-
3
-
-
0021392742
-
Power-System Reliability in Perspective
-
March
-
Billinton, R. and R.N. Allan, “Power-System Reliability in Perspective,” Electronics and Power, March 1984, pp 231 — 236.
-
(1984)
Electronics and Power
, pp. 231-236
-
-
Billinton, R.1
Allan, R.N.2
-
5
-
-
84944989318
-
CIGRE Working Group 38.03
-
International Conference on Large High Voltage Electric Systems
-
CIGRE Working Group 38.03, Power System Reliability Analysis - Application Guide, International Conference on Large High Voltage Electric Systems, 1988.
-
(1988)
Power System Reliability Analysis - Application Guide
-
-
-
7
-
-
0020176923
-
Bulk Power System Reliability Assessment - Why and How? Part I: Why?
-
September
-
Endrenyi, J., P.F. Albrecht, R. Billinton, G.E. Marks, N.D. Reppen, L. Salvaderi, “Bulk Power System Reliability Assessment - Why and How? Part I: Why?”, IEEE Transactions on Power Apparatus and Systems, Vol. PAS - 101, No. 9, September 1982, pp 3439 - 3445.
-
(1982)
IEEE Transactions on Power Apparatus and Systems
, vol.PAS - 101
, Issue.9
, pp. 3439-3445
-
-
Endrenyi, J.1
Albrecht, P.F.2
Billinton, R.3
Marks, G.E.4
Reppen, N.D.5
Salvaderi, L.6
-
8
-
-
0020177195
-
Bulk Power System Reliability Assessment - Why and How? Part II: How?
-
September
-
Endrenyi, J., P.E. Albrecht, R. Billinton, G.E. Marks, N.D. Reppen, L. Salvaderi, “Bulk Power System Reliability Assessment - Why and How? Part II: How?,” IEEE Transactions on Power Apparatus and Systems, Vol PAS-101, No. 9, September 1982, pp 3446–3456.
-
(1982)
IEEE Transactions on Power Apparatus and Systems
, vol.PAS-101
, Issue.9
, pp. 3446-3456
-
-
Endrenyi, J.1
Albrecht, P.E.2
Billinton, R.3
Marks, G.E.4
Reppen, N.D.5
Salvaderi, L.6
-
9
-
-
0022121919
-
Analysis of Pooling 345 kV Bulk Transmission Outage Data between the Mid-Continent Area Power Pool and Northeast Utilities
-
September
-
Lauby, M.G., R.P. Ludorf, J.H. Doudna, D.D. Klempel, P.J. Lehman, C.G. Dahl, “Analysis of Pooling 345 kV Bulk Transmission Outage Data between the Mid-Continent Area Power Pool and Northeast Utilities,” IEEE Transactions on Power Apparatus and Systems, Vol PAS - 104, No. 9, September 1985, pp 2427 - 2434.
-
(1985)
IEEE Transactions on Power Apparatus and Systems
, vol.PAS - 104
, Issue.9
, pp. 2427-2434
-
-
Lauby, M.G.1
Ludorf, R.P.2
Doudna, J.H.3
Klempel, D.D.4
Lehman, P.J.5
Dahl, C.G.6
-
11
-
-
85013510834
-
Measuring and Reporting Overall Reliability of Bulk Electricity Systems
-
Paper No. 32–15, August 27 to September 4, Paris
-
Winter, W.H., “Measuring and Reporting Overall Reliability of Bulk Electricity Systems,” Paper No. 32–15, CIGRE 1980 Session - August 27 to September 4, Paris.
-
(1980)
CIGRE 1980 Session
-
-
Winter, W.H.1
-
12
-
-
84944989321
-
Disturbance Performance of Bulk Electricity Systems
-
Paper No. 37/38/39-02, August 27 to September 4, Paris
-
Winter, W.H. and B.K. LeReverend, “Disturbance Performance of Bulk Electricity Systems,” Paper No. 37/38/39-02, CIGRE 1986 Session - August 27 to September 4, Paris.
-
(1986)
CIGRE 1986 Session
-
-
Winter, W.H.1
LeReverend, B.K.2
-
13
-
-
0017996591
-
Reliability Indices for use in Bulk Power Supply Adequacy Evaluation
-
Working Group on Performance Records for Optimizing System Design, July/August
-
Working Group on Performance Records for Optimizing System Design, “Reliability Indices for use in Bulk Power Supply Adequacy Evaluation,” IEEE Transactions on Power Apparatus and Systems, Vol PAS-97, No. 4, July/August 1978, pp 1097–1103.
-
(1978)
IEEE Transactions on Power Apparatus and Systems
, vol.PAS-97
, Issue.4
, pp. 1097-1103
-
-
|