Volumn 4, Issue 3, 1989, Pages 1122-1132

Bibliography on composiie system reliabiliiy (1964 - 1988)

Author keywords

Composite system reliability

Indexed keywords

ELECTRIC POWER SYSTEMS--RELIABILITY;

EID: 0024717289     PISSN: 08858950     EISSN: 15580679     Source Type: Journal    
DOI: 10.1109/59.32608     Document Type: Article
Times cited : (40)

References (239)
  • 1
    • 0002641026 scopus 로고
    • Power System Reliability I: Measure of Reliability and Methods of Calculation
    • Jul
    • Power System Reliability I: Measure of Reliability and Methods of Calculation,” D. P. Gaver, F. E. Montmeat, A.D. Patton, IEEE Trans. on PAS, vol. PAS-83, Jul 1964, pp. 727–737.
    • (1964) IEEE Trans. on PAS , vol.PAS-83 , pp. 727-737
    • Gaver, D.P.1    Montmeat, F.E.2    Patton, A.D.3
  • 2
    • 84911623919 scopus 로고
    • A Method for Calculating Transmission System Reliability
    • Mar
    • “A Method for Calculating Transmission System Reliability,” S.A. Mallard, V.C. Thomas, IEEE Trans. on PAS, vol. PAS-87, no. 3, Mar 1968, pp. 824–834.
    • (1968) IEEE Trans. on PAS , vol.PAS-87 , Issue.3 , pp. 824-834
    • Mallard, S.A.1    Thomas, V.C.2
  • 3
    • 0011852981 scopus 로고
    • Composite System Reliability Evaluation
    • Apr
    • “Composite System Reliability Evaluation,” R. Billinton, IEEE Trans. on PAS, vol. PAS-88, Apr 1969, pp. 276–280.
    • (1969) IEEE Trans. on PAS , vol.PAS-88 , pp. 276-280
    • Billinton, R.1
  • 4
    • 84944989456 scopus 로고
    • Reliability Computations of Electricity Supply for Important Industrial Consumers and of Large Transmissions Systems
    • paper STY I, Rome, Jun
    • “Reliability Computations of Electricity Supply for Important Industrial Consumers and of Large Transmissions Systems,” A. Kaminski, M. Kula, K. Oziemblewski, Proc. 3rd PSCC, vol. 2, paper STY I, Rome, Jun 1969.
    • (1969) Proc. 3rd PSCC , vol.2
    • Kaminski, A.1    Kula, M.2    Oziemblewski, K.3
  • 5
    • 84944989457 scopus 로고
    • Quantitative Power System Reliability Evaluation
    • paper STY 2, Rome, Jun
    • “Quantitative Power System Reliability Evaluation,” R. Billinton, Proc. 3rd PSCC, vol. 2, paper STY 2, Rome, Jun 1969.
    • (1969) Proc. 3rd PSCC , vol.2
    • Billinton, R.1
  • 6
    • 84944989458 scopus 로고
    • Estimation of Failures of a Transportation Network PERU Model
    • Rome, Jun (in French)
    • “Estimation of Failures of a Transportation Network PERU Model,” J. Auge, J. Bergougnoux, J.C. Dodu, J. Pouget, Proc. 3rd PSCC, vol. 2, Rome, Jun 1969 (in French).
    • (1969) Proc. 3rd PSCC , vol.2
    • Auge, J.1    Bergougnoux, J.2    Dodu, J.C.3    Pouget, J.4
  • 7
    • 0014700921 scopus 로고
    • Transmission Planning Using a Reliability Criterion, Part 1: A Reliability Criterion
    • Jan
    • “Transmission Planning Using a Reliability Criterion, Part 1: A Reliability Criterion,” R. Billinton, M.P. Bhavaraju, IEEE Trans. on PAS, vol. PAS-89, no. I, Jan 1970, pp. 28–34.
    • (1970) IEEE Trans. on PAS , vol.PAS-89 , Issue.1 , pp. 28-34
    • Billinton, R.1    Bhavaraju, M.P.2
  • 8
    • 84944989459 scopus 로고
    • Probabilistic Study of a Transmission System Interconnection (PERU Model)
    • paper 32–16, Paris, Aug/Sep
    • “Probabilistic Study of a Transmission System Interconnection (PERU Model),” J. Auge, J. Bergougnoux, J.C. Uodu, J. Pouget, CIGRE, paper 32–16, Paris, Aug/Sep 1970.
    • (1970) CIGRE
    • Auge, J.1    Bergougnoux, J.2    Uodu, J.C.3    Pouget, J.4
  • 9
    • 84944989460 scopus 로고
    • Generation and Transmission Reliability
    • paper 32–11, Paris, Aug/Sep
    • “Generation and Transmission Reliability,” J.A. Casazza, S.A. Mallard, CIGRE, paper 32–11, Paris, Aug/Sep 1970.
    • (1970) CIGRE
    • Casazza, J.A.1    Mallard, S.A.2
  • 10
    • 0014972682 scopus 로고
    • Composite System Reliability Methods
    • IEEE Tutorial Course, Course Text 71M 30-PWR
    • “Composite System Reliability Methods,” M.P. Bhavaraju, In Probability Analysis of Power System Reliability, IEEE Tutorial Course, Course Text 71M 30-PWR, 1971, pp. 32–39.
    • (1971) Probability Analysis of Power System Reliability , pp. 32-39
    • Bhavaraju, M.P.1
  • 12
    • 84944989462 scopus 로고
    • Probabilistic Model for the Overall Study of a Transportation Network's Feeding Security (Mexico Model)
    • Bulletin de la Direction des Etudes et Recherches, Serie B, (in French)
    • “Probabilistic Model for the Overall Study of a Transportation Network's Feeding Security (Mexico Model),” J. Dodu, Electriclte de France, Bulletin de la Direction des Etudes et Recherches, Serie B, no. 4, 1971, pp. 5–38 (in French).
    • (1971) Electriclte de France , Issue.4 , pp. 5-38
    • Dodu, J.1
  • 13
    • 0015283620 scopus 로고
    • A Probability Method for Bulk Power System Security Assessment, I-Basic Concepts
    • Jan/Feb
    • “A Probability Method for Bulk Power System Security Assessment, I-Basic Concepts,” A.D. Patton, IEEE Trans. on PAS, vol. PAS-91, no. 1, Jan/Feb 1972, pp. 54–61.
    • (1972) IEEE Trans. on PAS , vol.PAS-91 , Issue.1 , pp. 54-61
    • Patton, A.D.1
  • 14
    • 84921080863 scopus 로고
    • Quantitative Evaluation of Power System Reliability in Planning Studies
    • Mar/Apr
    • “Quantitative Evaluation of Power System Reliability in Planning Studies,” P.L. Noferi, L. Paris, IEEE Trans. on PAS, vol. PAS-91, no. 2, Mar/Apr 1972, pp. 611–618.
    • (1972) IEEE Trans. on PAS , vol.PAS-91 , Issue.2 , pp. 611-618
    • Noferi, P.L.1    Paris, L.2
  • 15
    • 0015315894 scopus 로고
    • Transmission System Reliability Methods
    • Mar/Apr
    • “Transmission System Reliability Methods,” M. P. Bhavaraju, R. Billinton, IEEE Trans. on PAS, vol. PAS-91, Mar/Apr 1972, pp. 628-637.
    • (1972) IEEE Trans. on PAS , vol.PAS-91 , pp. 628-637
    • Bhavaraju, M.P.1    Billinton, R.2
  • 16
    • 84941438886 scopus 로고
    • Reliability Evaluation in Large Transmission Systems
    • paper C72 475-2, San Francisco, Jul
    • “Reliability Evaluation in Large Transmission Systems,” R. Billinton, C. Singh, IEEE Summer Meeting, paper C72 475-2, San Francisco, Jul 1972.
    • (1972) IEEE Summer Meeting
    • Billinton, R.1    Singh, C.2
  • 17
    • 84921105719 scopus 로고
    • The Study of UHV System Reliability in Connection with its Structure and Component Characteristics
    • paper 31–14, Paris, Aug/Sep
    • “The Study of UHV System Reliability in Connection with its Structure and Component Characteristics,” L. Paris, F. Reggiani, M. Valtorta, CIGRE, paper 31–14, Paris, Aug/Sep 1972.
    • (1972) CIGRE
    • Paris, L.1    Reggiani, F.2    Valtorta, M.3
  • 18
    • 84944989465 scopus 로고
    • A Probabilistic Model for an Overall Study of Power Transmission Network Supply Reliability
    • paper 1.2/6, Grenoble, Sep
    • “A Probabilistic Model for an Overall Study of Power Transmission Network Supply Reliability,” J.C. Uodu, Proc. 4th PSCC, vol. 1, paper 1.2/6, Grenoble, Sep 1972.
    • (1972) Proc. 4th PSCC , vol.1
    • Uodu, J.C.1
  • 19
    • 84944989466 scopus 로고
    • Security Assessment and Control of Probability Methods
    • paper 2.2/2, Grenoble, Sep
    • “Security Assessment and Control of Probability Methods,” A.D. Patton, Proc. 4th PSCC, vol. 2, paper 2.2/2, Grenoble, Sep 1972.
    • (1972) Proc. 4th PSCC , vol.2
    • Patton, A.D.1
  • 20
    • 84944989467 scopus 로고
    • Computation of the Operation Security in a Power System
    • paper 2.2/5, Grenoble, Sep
    • “Computation of the Operation Security in a Power System,” J.A. Bubenko, M.A. Anderson, Proc. 4th PSCC, vol. 2, paper 2.2/5, Grenoble, Sep 1972.
    • (1972) Proc. 4th PSCC , vol.2
    • Bubenko, J.A.1    Anderson, M.A.2
  • 21
    • 84944989468 scopus 로고
    • Power System Reliability Indicators
    • paper 1.2/4, Grenoble, Sep
    • “Power System Reliability Indicators,” V.I. Nitu, H. Albert, S. lonescu, H. Cimpeanu, Proc. 4th PSCC, vol. 1, paper 1.2/4, Grenoble, Sep 1972.
    • (1972) Proc. 4th PSCC , vol.1
    • Nitu, V.I.1    Albert, H.2    Lonescu, S.3    Cimpeanu, H.4
  • 22
    • 0002994689 scopus 로고
    • Transportation Networks with Random Arc Capacities
    • Informatique et Recherche Operationelle (RAIR0), Nov
    • “Transportation Networks with Random Arc Capacities,” P. Doulliez, E. Jamoulle, Revue Francaise d'Automatique, Informatique et Recherche Operationelle (RAIR0), V-3, Nov 1972, pp. 45–60.
    • (1972) Revue Francaise d'Automatique , vol.V-3 , pp. 45-60
    • Doulliez, P.1    Jamoulle, E.2
  • 23
    • 0015431413 scopus 로고
    • A Probability Method for Bulk Power System Security Assessment, II-Development of Probability Models for Normally Operating Components
    • Nov/Dec
    • “A Probability Method for Bulk Power System Security Assessment, II-Development of Probability Models for Normally Operating Components,” A.D. Patton, IEEE Trans. on PAS, vol. PAS-91, no. 6, Nov/Dec, 1972, pp. 2480–2485.
    • (1972) IEEE Trans. on PAS , vol.PAS-91 , Issue.6 , pp. 2480-2485
    • Patton, A.D.1
  • 24
    • 0015435917 scopus 로고
    • A Probability Method for Bulk Power System Security Assessment, III-Models for Stand-by Generators and Field Data Collection and Analysis
    • Nov/Dec
    • “A Probability Method for Bulk Power System Security Assessment, III-Models for Stand-by Generators and Field Data Collection and Analysis,” A.D. Patton, IEEE Trans. on PAS, vol. PAS-91, no. 6, Nov/Dec 1972, pp. 2486–2493.
    • (1972) IEEE Trans. on PAS , vol.PAS-91 , Issue.6 , pp. 2486-2493
    • Patton, A.D.1
  • 27
    • 84944978504 scopus 로고
    • Capacity Availability Computations in Composite Power Systems
    • Oct
    • “Capacity Availability Computations in Composite Power Systems,” V.P. Batra, S.P. Jain, Electr. India, vol. 13, no. 19, Oct 1973, pp. 5–10.
    • (1973) Electr. India , vol.13 , Issue.19 , pp. 5-10
    • Batra, V.P.1    Jain, S.P.2
  • 28
    • 84943131884 scopus 로고
    • Using Equivalent Characteristics to Represent Power-System Objects in Reliability Calculations
    • Jan
    • “Using Equivalent Characteristics to Represent Power-System Objects in Reliability Calculations,” Y.N. Rudenko, G.A. Fedotov, M.B. Cheltsov, Power Engineering (Acad. Sci. USSR), vol. 12, no. 1, Jan 1974, pp. 12–18.
    • (1974) Power Engineering (Acad. Sci. USSR) , vol.12 , Issue.1 , pp. 12-18
    • Rudenko, Y.N.1    Fedotov, G.A.2    Cheltsov, M.B.3
  • 29
    • 84941503512 scopus 로고
    • Mefisto Procedure Evaluates Reliability
    • Feb 1
    • “Mefisto Procedure Evaluates Reliability,” D. Brancart, Electrical World, Feb 1, 1974, pp. 56-57.
    • (1974) Electrical World , pp. 56-57
    • Brancart, D.1
  • 30
    • 84943130528 scopus 로고
    • Use of REI Equivalents and REI Schemes for the Computation of Power System Reliability
    • Feb, (in Romanian)
    • “Use of REI Equivalents and REI Schemes for the Computation of Power System Reliability,” D.S. Necsulescu, Revista de Studii si Cercetari Energetice si Electrotehnice, vol. 24, Feb 1974, pp. 339–355 (in Romanian).
    • (1974) Revista de Studii si Cercetari Energetice si Electrotehnice , vol.24 , pp. 339-355
    • Necsulescu, D.S.1
  • 31
    • 84921088956 scopus 로고
    • Improvement in Quantitative Evaluation of Power System Reliability
    • paper C 74 137–6, New York, Jan/Feb
    • “Improvement in Quantitative Evaluation of Power System Reliability,” O. Bertoldi, P.L. Noferi, F. Reggiani, IEEE Winter Power Meeting, paper C 74 137–6, New York, Jan/Feb 1974.
    • (1974) IEEE Winter Power Meeting
    • Bertoldi, O.1    Noferi, P.L.2    Reggiani, F.3
  • 32
    • 84919032596 scopus 로고
    • Reliability Research in Electric Power Engineering
    • Apr, (in German)
    • “Reliability Research in Electric Power Engineering,” K.W. Edwin, Elektrizitaetswirtschaft, vol. 73, no. 9, Apr 1974, pp. 243–247 (in German).
    • (1974) Elektrizitaetswirtschaft , vol.73 , Issue.9 , pp. 243-247
    • Edwin, K.W.1
  • 33
    • 67650123055 scopus 로고
    • Reliability Evaluation of Power Transmission Networks - Models and Methods
    • paper 32–06. Paris, Aug
    • “Reliability Evaluation of Power Transmission Networks - Models and Methods,” J. Endrenyi, R. Billinton, CIGRE, paper 32–06. Paris, Aug 1974.
    • (1974) CIGRE
    • Endrenyi, J.1    Billinton, R.2
  • 34
    • 84921094023 scopus 로고
    • An Original Method for Computing Shortfall in Power Systems (Mefisto Method)
    • paper 32–09, Paris, Aug
    • An Original Method for Computing Shortfall in Power Systems (Mefisto Method),” H.Brancart, D. Brancart, J. Vankelecom, CIGRE, paper 32–09, Paris, Aug 1974.
    • (1974) CIGRE
    • Baleriaux, H.1    Brancart, D.2    Vankelecom, J.3
  • 35
    • 0016105806 scopus 로고
    • Effects of Voltage and Reactive Power Constraints on Power System Reliability
    • Sep, (in Italian)
    • “Effects of Voltage and Reactive Power Constraints on Power System Reliability,” P.L. Noferi, L'Elettrotecnica, vol. 61, Sep 1974, 835–843 (in Italian).
    • (1974) L'Elettrotecnica , vol.61 , pp. 835-843
    • Noferi, P.L.1
  • 36
    • 0346086259 scopus 로고
    • System Reduction as a Condition for the System Reliability Calculation
    • Oct, (in German)
    • “System Reduction as a Condition for the System Reliability Calculation,” A. Laue, D. Nelles, Elektrizitaetswirtschaft, vol. 73, no. 22, Oct 1974. pp. 649–653 (in German).
    • (1974) Elektrizitaetswirtschaft , vol.73 , Issue.22 , pp. 649-653
    • Laue, A.1    Nelles, D.2
  • 37
    • 0016594885 scopus 로고
    • Monte Carlo Method for Power System Reliability Evaluation in Transmission and Generation Planning
    • Washington D.C., IEEE cat. no. 75-CHO 918-3 RQC, paper 1294, Jan
    • “Monte Carlo Method for Power System Reliability Evaluation in Transmission and Generation Planning,” P.L. Noferi, L. Paris, L. Salvaderi, Proceedings 1975 Annual Reliability and Maintainability Symp., Washington D.C., IEEE cat. no. 75-CHO 918-3 RQC, paper 1294, Jan 1975. 449–459.
    • (1975) Proceedings 1975 Annual Reliability and Maintainability Symp. , pp. 449-459
    • Noferi, P.L.1    Paris, L.2    Salvaderi, L.3
  • 38
    • 0016480007 scopus 로고
    • Effects of Voltage and Reactive Power Constraints on Power System Reliability
    • Mar/Apr
    • “Effects of Voltage and Reactive Power Constraints on Power System Reliability,” P.L. Noferi, L. Paris, IEEE Trans. on PAS, vol. PAS-94, vol. 2, Mar/Apr 1975, 482–490.
    • (1975) IEEE Trans. on PAS , vol.2 PAS-94 , pp. 482-490
    • Noferi, P.L.1    Paris, L.2
  • 39
    • 84944989471 scopus 로고
    • Definitions of Customer and Load Reliability Indices for Evaluating Electric Power System Performance
    • IEEE Summer Meeting, paper A75 588-4, San Francisco, Jul
    • “Definitions of Customer and Load Reliability Indices for Evaluating Electric Power System Performance,” IEEE Working Group on Performance Records for Optimizing System Design, Power System Engineering Committee, IEEE Summer Meeting, paper A75 588-4, San Francisco, Jul 1975.
    • (1975) IEEE Working Group on Performance Records for Optimizing System Design, Power System Engineering Committee
  • 40
    • 3943083789 scopus 로고
    • An Application of Linear Programming to the Planning of Large Scale Power Transmission Systems: The Mexico Program
    • paper 2.2/9, Cambridge, England, September
    • “An Application of Linear Programming to the Planning of Large Scale Power Transmission Systems: The Mexico Program, J.C. Dodu, A. Merlin, Proc. 5th PSCC, vol. 1, paper 2.2/9, Cambridge, England, September 1975.
    • (1975) Proc. 5th PSCC , vol.1
    • Dodu, J.C.1    Merlin, A.2
  • 41
    • 84944989472 scopus 로고
    • Experience with the Application of Probability Methods to Bulk Power Transmission Planning
    • paper PG. 75 627–0, Sep/Oct
    • “Experience with the Application of Probability Methods to Bulk Power Transmission Planning,” M.B. Guertin, IEEE Joint Power Generation Technical Conference, paper PG. 75 627–0, Sep/Oct 1975.
    • (1975) IEEE Joint Power Generation Technical Conference
    • Guertin, M.B.1
  • 42
    • 0016545461 scopus 로고
    • The Influence of Generator Loss of Excitation on Bulk Power System Reliability
    • Sep/Oct
    • “The Influence of Generator Loss of Excitation on Bulk Power System Reliability,” H.G. Darron, IEEE Trans. on PAS, vol. PAS-94, Sep/Oct 1975, 1473–1483.
    • (1975) IEEE Trans. on PAS , vol.PAS-94 , pp. 1473-1483
    • Darron, H.G.1
  • 43
    • 0016551348 scopus 로고
    • A Reliability Approach to Interconnection Planning
    • Sep/Oct
    • “A Reliability Approach to Interconnection Planning,” G.L. Landgren, S.W. Anderson, R. White, IEEE Trans. on PAS, vol. PAS-94, no. 5, Sep/Oct 1975, 1644–1656.
    • (1975) IEEE Trans. on PAS , vol.PAS-94 , Issue.5 , pp. 1644-1656
    • Landgren, G.L.1    Anderson, S.W.2    White, R.3
  • 44
    • 0016565525 scopus 로고
    • Evaluation Methods for Power System Reliability
    • (in German)
    • “Evaluation Methods for Power System Reliability,” H.J. Koglin, ETZ-A, Bd. 96, Heft10, 1975, 486–490 (in German).
    • (1975) ETZ-A, Bd. 96, Heft10 , pp. 486-490
    • Koglin, H.J.1
  • 46
    • 84944981452 scopus 로고
    • A Probability Distribution for the Interruption Times in Electric Power Systems
    • May, (in German)
    • “A Probability Distribution for the Interruption Times in Electric Power Systems,” K.D. Kruger, Elektrie, vol. 30, no. 5, May 1976, 248–249 (in German).
    • (1976) Elektrie , vol.30 , Issue.5 , pp. 248-249
    • Kruger, K.D.1
  • 47
    • 0016953778 scopus 로고
    • Common Mode Forced Outages of Overhead Transmission Lines
    • May/Jun
    • “Common Mode Forced Outages of Overhead Transmission Lines,” IEEE PES Task Force, IEEE Trans. on PAS, vol. PAS-95, May/Jun 1976, 859–863.
    • (1976) IEEE PES Task Force, IEEE Trans. on PAS , vol.PAS-95 , pp. 859-863
  • 48
    • 85095901884 scopus 로고
    • Load Modeling in Power System Reliability Evaluation
    • paper no. A76 305–3, Portland, Jul
    • “Load Modeling in Power System Reliability Evaluation,” R. Billinton, J. Endrenyi, IEEE Summer Meeting, paper no. A76 305–3, Portland, Jul 1976.
    • (1976) IEEE Summer Meeting
    • Billinton, R.1    Endrenyi, J.2
  • 49
    • 85095909127 scopus 로고
    • Identification of Power System Steady-State Security Regions Under Load Uncertainty
    • paper A76 495–2, Portland, Jul
    • “Identification of Power System Steady-State Security Regions Under Load Uncertainty,” R. Fischi, G.C. Ejebe, J.A. de Maio, IEEE Summer Power Meeting, paper A76 495–2, Portland, Jul 1976.
    • (1976) IEEE Summer Power Meeting
    • Fischi, R.1    Ejebe, G.C.2    de Maio, J.A.3
  • 50
    • 85095913706 scopus 로고
    • Automatic Load Flow Contingency Evaluation Using a Reliability Index
    • paper A76 395–4, Portland, Jul
    • “Automatic Load Flow Contingency Evaluation Using a Reliability Index,” E. Masud, IEEE Summer Power Meeting, paper A76 395–4, Portland, Jul 1976.
    • (1976) IEEE Summer Power Meeting
    • Masud, E.1
  • 51
    • 84921088955 scopus 로고
    • Elements of Composite System Reliability Evaluation
    • paper 76-SP-148
    • “Elements of Composite System Reliability Evaluation,” R. Billinton, CEA Trans., vol. 15, Pt. 2, paper 76-SP-148, 1976.
    • (1976) CEA Trans. , vol.15
    • Billinton, R.1
  • 52
    • 84944983611 scopus 로고
    • Power System Reliability Indices
    • edited by E.J. Henley and J.W. Lynn, Noordhoff Int. Publishing, Leyden, Holland
    • “Power System Reliability Indices,” R. Billinton, in Generic Techniques in Systems Reliability Assessment, edited by E.J. Henley and J.W. Lynn, Noordhoff Int. Publishing, Leyden, Holland, 1976, 61–81.
    • (1976) Generic Techniques in Systems Reliability Assessment , pp. 61-81
    • Billinton, R.1
  • 53
    • 84944989476 scopus 로고
    • Risk Indices for Evaluating the Reliability of an Electrical System
    • edited by E.J. Henley and J.W. Lynn, Noordhoff Int. Publishing, Leyden, Holland
    • “Risk Indices for Evaluating the Reliability of an Electrical System,” G. Manzoni, P.L. Noferi, L. Paris, M. Valtorta, in Generic Techniques in Systems Reliability Assessment, edited by E.J. Henley and J.W. Lynn, Noordhoff Int. Publishing, Leyden, Holland, 1976, 255–265.
    • (1976) Generic Techniques in Systems Reliability Assessment , pp. 255-265
    • Manzoni, G.1    Noferi, P.L.2    Paris, L.3    Valtorta, M.4
  • 55
    • 84939374656 scopus 로고
    • Ranking of Types of Power System Contingencies in Most Probable Order of Occurrence
    • EPRI LL-377-SR Special Report, Feb
    • “Ranking of Types of Power System Contingencies in Most Probable Order of Occurrence,” J.L. Davidson in Power System Planning and Operations: Future Problems and Research Needs, EPRI LL-377-SR Special Report, Feb 1977.
    • (1977) Power System Planning and Operations: Future Problems and Research Needs
    • Davidson, J.L.1
  • 56
    • 84938004134 scopus 로고
    • Reliability Criteria for System Dynamic Performance
    • IEEE Working Group on Dynamic System Performance, Nov/Dec
    • “Reliability Criteria for System Dynamic Performance,” IEEE Working Group on Dynamic System Performance, IEEE Trans. on PAS, vol. PAS-96, no. 6, Nov/Dec 1977, 1815–1818.
    • (1977) IEEE Trans. on PAS , vol.PAS-96 , Issue.6 , pp. 1815-1818
  • 57
    • 85095913730 scopus 로고
    • Linear Programming vs. Network Flow Methods Applied to Bulk Power Supply Adequacy Assessment
    • paper A78 062–2, New York, Jan
    • “Linear Programming vs. Network Flow Methods Applied to Bulk Power Supply Adequacy Assessment,” K.A. Clements, G.C. Ejebe, B.F. Wollenberg, IEEE PES Winter Meeting, paper A78 062–2, New York, Jan 1978.
    • (1978) IEEE PES Winter Meeting
    • Clements, K.A.1    Ejebe, G.C.2    Wollenberg, B.F.3
  • 58
    • 85095901907 scopus 로고
    • Load Models for Bulk Power Supply Adequacy Assessment
    • paper A78 232–1, Jan
    • “Load Models for Bulk Power Supply Adequacy Assessment,” T.A. Mikolinnas, K.A. Clements, IEEE PES Winter Meeting, paper A78 232–1, Jan 1978.
    • (1978) IEEE PES Winter Meeting
    • Mikolinnas, T.A.1    Clements, K.A.2
  • 59
    • 85095902637 scopus 로고
    • Composite Generation and Transmission System Reliability Evaluation
    • paper A/8 237-0, New York, Jan
    • “Composite Generation and Transmission System Reliability Evaluation,” R. Billinton, T.K.P. Medicherla, IEEE PES Winter Meeting, paper A/8 237-0, New York, Jan 1978.
    • (1978) IEEE PES Winter Meeting
    • Billinton, R.1    Medicherla, T.K.P.2
  • 60
    • 85095903484 scopus 로고
    • A Method of Combining High Speed Contingency Load Flow Analysis with Stochastic Probability Methods to Calculate a Quantitative Measure of Overall Power System Reliability
    • paper A78 053–1, New York, Jan
    • “A Method of Combining High Speed Contingency Load Flow Analysis with Stochastic Probability Methods to Calculate a Quantitative Measure of Overall Power System Reliability,” G.E. Marks, IEEE PES Winter Meeting, paper A78 053–1, New York, Jan 1978.
    • (1978) IEEE PES Winter Meeting
    • Marks, G.E.1
  • 61
    • 85095903861 scopus 로고
    • Network Limitations on Generating Systems Reliability Evaluation Techniques
    • paper A78 070–5, New York, Jan
    • “Network Limitations on Generating Systems Reliability Evaluation Techniques,” R.N. Allan, F. N. Takieddine, IEEE PES Winter Meeting, paper A78 070–5, New York, Jan 1978.
    • (1978) IEEE PES Winter Meeting
    • Allan, R.N.1    Takieddine, F.N.2
  • 62
    • 0018212563 scopus 로고
    • Recent Improvements of the Mexico Model for Probability Planning Studies
    • Darmstadt, (This paper was also published at Int. Journal of Electrical Power and Energy Systems, vol. 1, no. 1, Apr 1979, 45-56.)
    • “Recent Improvements of the Mexico Model for Probability Planning Studies,” J.C. Dodu, A. Merlin, Proc. 6th. PSCC, vol. 1, Darmstadt, 1978, 589–597. (This paper was also published at Int. Journal of Electrical Power and Energy Systems, vol. 1, no. 1, Apr 1979, 45-56.)
    • (1978) Proc. 6th. PSCC , vol.1 , pp. 589-597
    • Dodu, J.C.1    Merlin, A.2
  • 63
    • 0017956421 scopus 로고
    • Why and Wherefores of Power System Blackouts
    • Apr
    • “Why and Wherefores of Power System Blackouts,” D.N. Ewart, IEEE Spectrum, Apr 1978, 36–41.
    • (1978) IEEE Spectrum , pp. 36-41
    • Ewart, D.N.1
  • 65
    • 33746611202 scopus 로고
    • Application of a Variance Reducing Technique to a Monte Carlo Simulation Model of Power Transmission Systems
    • EPRI Report WS77-60, Oct
    • “Application of a Variance Reducing Technique to a Monte Carlo Simulation Model of Power Transmission Systems,” A. Merlin, P. Oger, in Workshop Proceedings: Power System Reliability - Research Needs and Priorities, EPRI Report WS77-60, Oct 1978, 3-35, 3-44.
    • (1978) Workshop Proceedings: Power System Reliability - Research Needs and Priorities , pp. 3-35-3-44
    • Merlin, A.1    Oger, P.2
  • 66
    • 0018282923 scopus 로고
    • A Line Overload Alleviation Technique for Composite System Reliability Studies
    • IEEE cat. no. 78 CH 1373–0 Reg. 7, Montreal, Oct
    • “A Line Overload Alleviation Technique for Composite System Reliability Studies,” R. Billinton, T.K.P. Medicherla, M.S. Sachdev, Canadian Communication and Power Conference, IEEE cat. no. 78 CH 1373–0 Reg. 7, Montreal, Oct 1978.
    • (1978) Canadian Communication and Power Conference
    • Billinton, R.1    Medicherla, T.K.P.2    Sachdev, M.S.3
  • 67
    • 84921102685 scopus 로고
    • Reliability Calculation and Modeling for Composite Generation-Transmission Systems with Applications to Power System Containing Non-Conventional Energy Sources
    • Stockholm
    • “Reliability Calculation and Modeling for Composite Generation-Transmission Systems with Applications to Power System Containing Non-Conventional Energy Sources,” T.S. Dillon et alii, Int. Symp. on System Reliability for Power Engineering, Stockholm, 1978.
    • (1978) Int. Symp. on System Reliability for Power Engineering
    • Dillon et alii, T.S.1
  • 68
    • 84944989482 scopus 로고
    • A Method of Simplifying an Electrical Network for Reliability Study
    • Jan, (in Italian)
    • “A Method of Simplifying an Electrical Network for Reliability Study,” A. Fallabrino, L'Elettrotecnica, vol. LXV1I, no. 1, Jan 1979 (in Italian).
    • (1979) L'Elettrotecnica , vol.LXV1I , Issue.1
    • Fallabrino, A.1
  • 69
    • 85095907581 scopus 로고
    • Adequacy Indices for Composite Generation and Transmission System Reliability Evaluation
    • paper A79 024–1, New York, Feb
    • “Adequacy Indices for Composite Generation and Transmission System Reliability Evaluation,” R. BllUnton, T.K.P. Medicherla, M.S. Sachdev, IEEE PES Winter Meeting, paper A79 024–1, New York, Feb 1979.
    • (1979) IEEE PES Winter Meeting
    • BllUnton, R.1    Medicherla, T.K.P.2    Sachdev, M.S.3
  • 70
    • 85095912304 scopus 로고
    • Concepts for Composite System Reliability Applied to the Iwo-Area Planning Problem
    • paper A79 109–0, New York, Feb
    • “Concepts for Composite System Reliability Applied to the Iwo-Area Planning Problem,” B. Porretta, IEEE PES Winter Meeting, paper A79 109–0, New York, Feb 1979.
    • (1979) IEEE PES Winter Meeting
    • Porretta, B.1
  • 71
    • 85095905368 scopus 로고
    • An Approach for Bulk Power System Reliability Evaluation in Power System Planning
    • paper A79 108–2, New York, Feb
    • “An Approach for Bulk Power System Reliability Evaluation in Power System Planning,” I. Atiyyah, A. El-Abiad, IEEE PES Winter Meeting, paper A79 108–2, New York, Feb 1979.
    • (1979) IEEE PES Winter Meeting
    • Atiyyah, I.1    El-Abiad, A.2
  • 72
    • 0018326251 scopus 로고
    • Introduction of Security Constraints in a Probabilistic Model for Estimating the Supply Reliability of Power Transmission Systems (The Mexico Model)
    • IEEE cat. no. 19CH 1381-3-PWR, May
    • “Introduction of Security Constraints in a Probabilistic Model for Estimating the Supply Reliability of Power Transmission Systems (The Mexico Model),” J.C. Dodu, A. Merlin, Proc. IEEE Power Industry Computer Applications Conference (PICA), IEEE cat. no. 19CH 1381-3-PWR, May 1979, pp. 82–89.
    • (1979) Proc. IEEE Power Industry Computer Applications Conference (PICA) , pp. 82-89
    • Dodu, J.C.1    Merlin, A.2
  • 74
    • 0018494744 scopus 로고
    • A Bounded Set Theoretical Approach to Reliability Modeling and Calculations for Composite Generation-Transmission Systems Including Systems with Unconventional Energy Sources
    • “A Bounded Set Theoretical Approach to Reliability Modeling and Calculations for Composite Generation-Transmission Systems Including Systems with Unconventional Energy Sources,” H. Cheong, T. Dillon, Int. Journal of Electrical Power and Energy Systems, vol. 1, no. 2, 1979, 95–106.
    • (1979) Int. Journal of Electrical Power and Energy Systems , vol.1 , Issue.2 , pp. 95-106
    • Cheong, H.1    Dillon, T.2
  • 76
    • 0018544097 scopus 로고
    • IEEE Reliability Test System
    • IEEE Committee Report, Nov/Dec
    • “IEEE Reliability Test System,” IEEE Committee Report, IEEE Trans. on PAS, vol. PAS-98, no. 6, Nov/Dec 1979, 2047–2054.
    • (1979) IEEE Trans. on PAS , vol.PAS-98 , Issue.6 , pp. 2047-2054
  • 77
    • 0018711131 scopus 로고
    • On More Precise Evaluation of Power System Reliability
    • “On More Precise Evaluation of Power System Reliability,” G.N. Lyalik, I.V. Dubrovina, Electric Technology USSR, no. 4, 1979, 126–134.
    • (1979) Electric Technology USSR , Issue.4 , pp. 126-134
    • Lyalik, G.N.1    Dubrovina, I.V.2
  • 78
    • 0018467884 scopus 로고
    • Load Supplying Capability of Generation - Transmission Systems
    • “Load Supplying Capability of Generation - Transmission Systems,” L.L. Garver, P.R. Van Horne, K.A. Wirgau, IEEE Trans. on PAS, vol. PAS-98, 1979, pp. 957–962.
    • (1979) IEEE Trans. on PAS , vol.PAS-98 , pp. 957-962
    • Garver, L.L.1    Van Horne, P.R.2    Wirgau, K.A.3
  • 79
    • 0018998466 scopus 로고
    • Overall Approach to the Reliability Evaluation of Composite Generation and Transmission Systems
    • Mar
    • “Overall Approach to the Reliability Evaluation of Composite Generation and Transmission Systems,” R. Billinton, T.K.P. Madlcherla, Proc. IEE, Part C, vol. 127, no. 2, Mar 1980, 72–81.
    • (1980) Proc. IEE , vol.127 , Issue.2 , pp. 72-81
    • Billinton, R.1    Madlcherla, T.K.P.2
  • 80
    • 85013510834 scopus 로고
    • Measuring and Reporting Overall Reliability of Bulk Electricity Systems
    • paper 32–15, Paris, Sep
    • “Measuring and Reporting Overall Reliability of Bulk Electricity Systems,” W.H. Winter, CIGRE, paper 32–15, Paris, Sep 1980.
    • (1980) CIGRE
    • Winter, W.H.1
  • 81
    • 0019033771 scopus 로고
    • Application of Methods and Computing Programs to System Planning. Part 1: Generation System, Part 2: Transmission System
    • Jul
    • “Application of Methods and Computing Programs to System Planning. Part 1: Generation System, Part 2: Transmission System,” G. Manzoni, L. Paris, L. Salvaderi, M. Valtorta, Int. Journal of Electrical Power and Energy Systems, Jul 1980, vol. 2, no. 3, 147–158.
    • (1980) Int. Journal of Electrical Power and Energy Systems , vol.2 , Issue.3 , pp. 147-158
    • Manzoni, G.1    Paris, L.2    Salvaderi, L.3    Valtorta, M.4
  • 82
    • 0019068195 scopus 로고
    • Extensions to the Bounded - Set Theoretical Approach to Reliability Modeling and Calculations for Composite Generation - Transmission Systems Using a DC Load - Flow Model
    • “Extensions to the Bounded - Set Theoretical Approach to Reliability Modeling and Calculations for Composite Generation - Transmission Systems Using a DC Load - Flow Model,” H.K. Cheong, T.S. Dillon, Int. Journal of Electrical Power and Energy Systems, vol. 2, no. 4, 1980, 169–180.
    • (1980) Int. Journal of Electrical Power and Energy Systems , vol.2 , Issue.4 , pp. 169-180
    • Cheong, H.K.1    Dillon, T.S.2
  • 83
    • 0019094920 scopus 로고
    • Fundamentals of Power System Reliability
    • “Fundamentals of Power System Reliability,” F.I. Sln’chugov, Electric Technology USSR, no. 2, 1980,1-10.
    • (1980) Electric Technology USSR , Issue.2 , pp. 1-10
    • Sln'Chugov, F.I.1
  • 85
    • 0019893521 scopus 로고
    • Interconnected Power System Reliability Evaluation
    • IEEE cat. no. 81 CH 1618–8, Philadelphia, Jan
    • “Interconnected Power System Reliability Evaluation,” S.B. Dhar C.K. Pang, Proceedings Annual Reliability and Maintainability Symp., IEEE cat. no. 81 CH 1618–8, Philadelphia, Jan 1981, 173–179.
    • (1981) Proceedings Annual Reliability and Maintainability Symp. , pp. 173-179
    • Dhar, S.B.1    Pang, C.K.2
  • 86
    • 0019546880 scopus 로고
    • Computing Methods and Devices for the Reliability Evaluation of Large Power Systems
    • Mar, (Paper previously published under code A80 070-3)
    • “Computing Methods and Devices for the Reliability Evaluation of Large Power Systems,” K. Galiyas, J. Endrenyi, IEEE Trans. on PAS, vol. PAS-100, no. 3, Mar 1981, 1250–1258 (Paper previously published under code A80 070-3).
    • (1981) IEEE Trans. on PAS , vol.PAS-100 , Issue.3 , pp. 1250-1258
    • Galiyas, K.1    Endrenyi, J.2
  • 87
    • 0019557922 scopus 로고
    • A Dual Interval Programming Approach to Power System Reliability Evaluation
    • Apr
    • “A Dual Interval Programming Approach to Power System Reliability Evaluation,” G.J. Anders, E.A. Gunn, IEEE Trans. on PAS, vol. PAS-100, no. 4, Apr 1981, 1665–1673.
    • (1981) IEEE Trans. on PAS , vol.PAS-100 , Issue.4 , pp. 1665-1673
    • Anders, G.J.1    Gunn, E.A.2
  • 88
    • 0019587069 scopus 로고
    • Application of Common-Cause Outage Models in Composite System Reliability Evaluation
    • Jul, (Paper previously published under code A79 461–5)
    • “Application of Common-Cause Outage Models in Composite System Reliability Evaluation,” R. Billinton, T.K.P. Medicherla, M.S. Sachdev, IEEE Trans. on PAS, vol. PAS-100, no. 7, Jul 1981, 3648–3657 (Paper previously published under code A79 461–5).
    • (1981) IEEE Trans. on PAS , vol.PAS-100 , Issue.7 , pp. 3648-3657
    • Billinton, R.1    Medicherla, T.K.P.2    Sachdev, M.S.3
  • 89
    • 0019589705 scopus 로고
    • A Reliability Analysis Technique for Bulk System Planning
    • Jul
    • “A Reliability Analysis Technique for Bulk System Planning,” S.J. Ranade, R.L. Sullivan, IEEE Trans. on PAS, vol. PAS-100, no. 7, Jul 1981, 3658–3665.
    • (1981) IEEE Trans. on PAS , vol.PAS-100 , Issue.7 , pp. 3658-3665
    • Ranade, S.J.1    Sullivan, R.L.2
  • 90
    • 0019669447 scopus 로고
    • Network Reliability Evaluation: Peculiar Problems to be Faced When Planning Bulk Meshed Transmission Systems
    • Jul
    • “Network Reliability Evaluation: Peculiar Problems to be Faced When Planning Bulk Meshed Transmission Systems,” I. Facchinei, L. Salvaderi, E. Giampieri, S. Scalcino, Proc. 7th PSCC Lausanne, Jul 1981, 97–103.
    • (1981) Proc. 7th PSCC Lausanne , pp. 97-103
    • Facchinei, I.1    Salvaderi, L.2    Giampieri, E.3    Scalcino, S.4
  • 91
    • 0019666798 scopus 로고
    • A New Probabilistic Model for Long-term Planning Studies of EHV Power Transmission Systems Using a Stochastic Subgradient Method
    • Lausanne, Jul
    • “A New Probabilistic Model for Long-term Planning Studies of EHV Power Transmission Systems Using a Stochastic Subgradient Method,” J.C. Dodu, A. Hertz, J.P. Quadrat, Proc. 7th PSCC, Lausanne, Jul 1981, 125–133.
    • (1981) Proc. 7th PSCC , pp. 125-133
    • Dodu, J.C.1    Hertz, A.2    Quadrat, J.P.3
  • 92
    • 0019691352 scopus 로고
    • A Direct Method for Bulk Power System Reliability Evaluation
    • Lausanne, Jul
    • “A Direct Method for Bulk Power System Reliability Evaluation,” K. Moslehi, F.F. Wu, Proc. 7th PSCC, Lausanne, Jul 1981, 149–153.
    • (1981) Proc. 7th PSCC , pp. 149-153
    • Moslehi, K.1    Wu, F.F.2
  • 93
    • 0019680778 scopus 로고
    • A Bounded Set lheoretical Approach to Reliability Calculations
    • Lausanne, Jul
    • “A Bounded Set lheoretical Approach to Reliability Calculations,” H.K. Cheong, T.S. Dillon, Proc. 7th PSCC, Lausanne, Jul 1981, 154–161.
    • (1981) Proc. 7th PSCC , pp. 154-161
    • Cheong, H.K.1    Dillon, T.S.2
  • 94
    • 0019685169 scopus 로고
    • The Algorithms for Reliability Studies of Complex Electric Power Systems by the Analytical Method
    • Lausanne, Jul
    • “The Algorithms for Reliability Studies of Complex Electric Power Systems by the Analytical Method,” G.F. Kovalev, Yu. N. Rudenko, Proc. 7th PSCC, Lausanne, Jul 1981, 176–185.
    • (1981) Proc. 7th PSCC , pp. 176-185
    • Kovalev, G.F.1    Rudenko, Y.N.2
  • 95
    • 0019685643 scopus 로고
    • Simultaneous Outages of Components in Power System Networks
    • Lausanne, Jul
    • “Simultaneous Outages of Components in Power System Networks,” B.E. Bitzer, H.R. Gebler, H.J Koglin, Proc. 7th PSCC, Lausanne, Jul 1981, 196–192.
    • (1981) Proc. 7th PSCC , pp. 192-196
    • Bitzer, B.E.1    Gebler, H.R.2    Koglin, H.J.3
  • 96
    • 0019700185 scopus 로고
    • Forecasting the Permissible Level of Risk in Assessing Short Term System Operation Reliability for the Power System
    • Lausanne, Jul
    • “Forecasting the Permissible Level of Risk in Assessing Short Term System Operation Reliability for the Power System,” V.I. Nitu, A.M. Petrescu, Proc. 7th PSCC, Lausanne, Jul 1981, 193–200.
    • (1981) Proc. 7th PSCC , pp. 193-200
    • Nitu, V.I.1    Petrescu, A.M.2
  • 97
    • 0019667635 scopus 로고
    • Network Reliability Evaluation: Reduction in Computer lime
    • Lausanne, Jul
    • “Network Reliability Evaluation: Reduction in Computer lime,” O. Bertoldi, Proc. 7th PSCC, Lausanne, Jul 1981, 210–215.
    • (1981) Proc. 7th PSCC , pp. 210-215
    • Bertoldi, O.1
  • 98
    • 0019680776 scopus 로고
    • A Decomposition-Monte Carlo Approach for Multi-Area Reliability Calculations
    • Lausanne, Jul
    • “A Decomposition-Monte Carlo Approach for Multi-Area Reliability Calculations,” D.P. Clancy, G. Gross, F.F. Wu, Proc. 7th PSCC, Lausanne, Jul 1981, 261–269.
    • (1981) Proc. 7th PSCC , pp. 261-269
    • Clancy, D.P.1    Gross, G.2    Wu, F.F.3
  • 99
    • 0019714575 scopus 로고
    • Computational Aspects in the Reliability Evaluation of Composite Systems
    • Lausanne, Jul
    • “Computational Aspects in the Reliability Evaluation of Composite Systems,” R.N. Allan, C. Arruda, F.M. Barbosa, Proc. 7th PSCC, Lausanne, Jul 1981, 225–229.
    • (1981) Proc. 7th PSCC , pp. 225-229
    • Allan, R.N.1    Arruda, C.2    Barbosa, F.M.3
  • 100
    • 0019597743 scopus 로고
    • Station Originated Multiple Outages in the Reliability Analysis of a Composite Generation and Transmission System
    • Aug
    • “Station Originated Multiple Outages in the Reliability Analysis of a Composite Generation and Transmission System,” R. Billinton, T.K.P. Medicherla, IEEE Trans. on PAS, vol PAS-100, no. 8, Aug 1981, 3870–3878.
    • (1981) IEEE Trans. on PAS , vol.PAS-100 , Issue.8 , pp. 3870-3878
    • Billinton, R.1    Medicherla, T.K.P.2
  • 101
    • 0019673606 scopus 로고
    • Forming Power System State Space in Reliability Analysis
    • “Forming Power System State Space in Reliability Analysis,” F.I. Sinchugov, S.F. Makarov, Electric Technology USSR, no. 3, 1981, 27–37.
    • (1981) Electric Technology USSR , Issue.3 , pp. 27-37
    • Sinchugov, F.I.1    Makarov, S.F.2
  • 102
    • 84944989488 scopus 로고
    • Methodology for Statistical Evaluation of Power Systems Reliability
    • (SNPTEE), Florianopolis, Brazil, (in Portuguese)
    • “Methodology for Statistical Evaluation of Power Systems Reliability,” A. Vian, E.J. Robba, C.H. Ping, 6th Brazilian Power System Seminar, (SNPTEE), Florianopolis, Brazil, 1981, (in Portuguese).
    • (1981) 6th Brazilian Power System Seminar
    • Vian, A.1    Robba, E.J.2    Ping, C.H.3
  • 105
    • 0020003305 scopus 로고
    • TRAP: An Innovative Approach to Analyzing the Reliability of Transmission Plans
    • Jan
    • “TRAP: An Innovative Approach to Analyzing the Reliability of Transmission Plans,” P.R. Van Horne, C.N. Schoenberger, IEEE Trans. on PAS, vol. PAS-101, no. 1, Jan 1982, 11–16.
    • (1982) IEEE Trans. on PAS , vol.PAS-101 , Issue.1 , pp. 11-16
    • Van Horne, P.R.1    Schoenberger, C.N.2
  • 106
    • 0020221336 scopus 로고
    • Power System Reliability Indices and Their Application in the Assessment of Reliability Worth
    • paper 82-SP-143, Montreal, Mar
    • “Power System Reliability Indices and Their Application in the Assessment of Reliability Worth,” R. Billinton, G. Wacker, E. Wojczynski, B. Tongshuo, Trans. of CEA, Engineering and Operating Division, paper 82-SP-143, vol. 21, Part 3, Montreal, Mar 1982.
    • (1982) Trans. of CEA, Engineering and Operating Division , vol.21
    • Billinton, R.1    Wacker, G.2    Wojczynski, E.3    Tongshuo, B.4
  • 107
    • 0020129037 scopus 로고
    • Application of Adequacy Assessment Techniques for Bulk Power Systems
    • May
    • “Application of Adequacy Assessment Techniques for Bulk Power Systems,” T.A. Mikolinnas, W.R. Puntel, R.J. Ringlee, IEEE Trans. on PAS, vol. PAS-101, no. 5, May 1982, 1219–1288.
    • (1982) IEEE Trans. on PAS , vol.PAS-101 , Issue.5 , pp. 1219-1288
    • Mikolinnas, T.A.1    Puntel, W.R.2    Ringlee, R.J.3
  • 108
    • 0020151917 scopus 로고
    • Reliability Optimization for Transmission Expansion Planning
    • Jul
    • “Reliability Optimization for Transmission Expansion Planning,” T.A.M. Sharaf, G.J. Berg, IEEE Trans. on PAS, vol. PAS-101, no. 7, Jul 1982, 2243–2248.
    • (1982) IEEE Trans. on PAS , vol.PAS-101 , Issue.7 , pp. 2243-2248
    • Sharaf, T.A.M.1    Berg, G.J.2
  • 109
    • 84939723585 scopus 로고
    • Reliability Optimization for Transmission Expansion Planning
    • Correction to, Sep
    • Correction to “Reliability Optimization for Transmission Expansion Planning,” T.A.M. Sharaf, G.J. Berg, IEEE Trans. on PAS, vol. PAS-101, no. 9, Sep 1982, p. 3592.
    • (1982) IEEE Trans. on PAS , vol.PAS-101 , Issue.9 , pp. 3592
    • Sharaf, T.A.M.1    Berg, G.J.2
  • 110
    • 0020178691 scopus 로고
    • A Computerized Technique for Reliability Evaluation in Power System Transmission Planning
    • “A Computerized Technique for Reliability Evaluation in Power System Transmission Planning,” T.A.M. Sharaf, G.J. Berg, Electric Power Systems Research, vol. 5, 1982, 245–252.
    • (1982) Electric Power Systems Research , vol.5 , pp. 245-252
    • Sharaf, T.A.M.1    Berg, G.J.2
  • 111
    • 0020176376 scopus 로고
    • LTC Transformers and Mvar Violations in the Fast Decoupled Load Flow
    • Sep
    • “LTC Transformers and Mvar Violations in the Fast Decoupled Load Flow,” R.N. Allan, C. Arruda, IEEE Trans. on PAS, vol. PAS-101, no. 9, Sep 1982, 3328–3332.
    • (1982) IEEE Trans. on PAS , vol.PAS-101 , Issue.9 , pp. 3328-3332
    • Allan, R.N.1    Arruda, C.2
  • 114
    • 0020178967 scopus 로고
    • Bulk Power Area Reliability Evaluation Considering Probabilistic Transfer Capability
    • (PJM Transmission Reliability Task Force), Sep
    • “Bulk Power Area Reliability Evaluation Considering Probabilistic Transfer Capability,” R.B. Adler, M.P. Bhavaraju, D.G. Cole, C. Doyle, J.R. Duncan, T.G. Lawrence, W. Mitchell, G.E. Timmons, H.H. Yan (PJM Transmission Reliability Task Force), IEEE Trans. on PAS, vol. PAS-101, no. 9, Sep 1982, 3551–3562.
    • (1982) IEEE Trans. on PAS , vol.PAS-101 , Issue.9 , pp. 3551-3562
    • Adler, R.B.1    Bhavaraju, M.P.2    Cole, D.G.3    Doyle, C.4    Duncan, J.R.5    Lawrence, T.G.6    Mitchell, W.7    Timmons, G.E.8    Yan, H.H.9
  • 115
    • 84938020218 scopus 로고
    • Bulk Power Area Reliability Evaluation Considering Probabilistic transfer Capability
    • Correction to, Dec
    • Correction to “Bulk Power Area Reliability Evaluation Considering Probabilistic transfer Capability,” IEEE Task Force, IEEE Trans. on PAS, vol. PAS-101, no. 12, Dec 1982, p. 4673.
    • (1982) IEEE Task Force, IEEE Trans. on PAS , vol.PAS-101 , Issue.12 , pp. 4673
  • 116
    • 0012166422 scopus 로고
    • Impact of Construction Delays on the Reliability of a Hydro System. A Brazilian Planning Experience
    • paper 31–14, Paris, Sep
    • “Impact of Construction Delays on the Reliability of a Hydro System. A Brazilian Planning Experience,” N. de Franco, A. Ventura Filho, P.A.S. Pegado, J. Kelman, A. Vian, CIGRE, paper 31–14, Paris, Sep 1982.
    • (1982) CIGRE
    • de Franco, N.1    Filho, A.V.2    Pegado, P.A.S.3    Kelman, J.4    Vian, A.5
  • 117
    • 84944989490 scopus 로고
    • A Quality Index for Evaluating Network Equivalents
    • paper 32–11, Paris, Sep
    • “A Quality Index for Evaluating Network Equivalents,” P. Burri, G. Zajc, CIGRE, paper 32–11, Paris, Sep 1982.
    • (1982) CIGRE
    • Burri, P.1    Zajc, G.2
  • 118
    • 0020294298 scopus 로고
    • Terminal Effects and Protection System Failuresin Composite System Reliability Evaluation
    • Dec
    • “Terminal Effects and Protection System Failuresin Composite System Reliability Evaluation,” R.N. Allan, A.N. Adraktas, IEEE Trans. on PAS, vol. PAS-101, no. 12, Dec 1982, 4557–4562.
    • (1982) IEEE Trans. on PAS , vol.PAS-101 , Issue.12 , pp. 4557-4562
    • Allan, R.N.1    Adraktas, A.N.2
  • 121
    • 0020341345 scopus 로고
    • Reliability Assessment of EHV Transmission Systems - A Random Simulation Approach
    • EUROCON 82, Copenhagen, Denmark
    • “Reliability Assessment of EHV Transmission Systems - A Random Simulation Approach,” M.S. El-Sobki, H. Anis, Proc. 5th European Conference on Electrotechnics, EUROCON 82, Copenhagen, Denmark, 1982, 719–724.
    • (1982) Proc. 5th European Conference on Electrotechnics , pp. 719-724
    • El-Sobki, M.S.1    Anis, H.2
  • 122
    • 0020719255 scopus 로고
    • Evaluation of Importance and Related Reliability Measures for Electric Power Systems
    • Mar
    • “Evaluation of Importance and Related Reliability Measures for Electric Power Systems,” G.J. Anders, IEEE Trans. on PAS, vol. PAS-102, no. 3, Mar 1983, 527–537.
    • (1983) IEEE Trans. on PAS , vol.PAS-102 , Issue.3 , pp. 527-537
    • Anders, G.J.1
  • 123
    • 0020868538 scopus 로고
    • A Method for Power System Reliability Assessment
    • paper 83-SP-145, Vancouver, Mar
    • “A Method for Power System Reliability Assessment,” G. Desrochers, CEA Trans., Engineering and Operating Division, vol. 22, Part 3, paper 83-SP-145, Vancouver, Mar 1983.
    • (1983) CEA Trans., Engineering and Operating Division , vol.22
    • Desrochers, G.1
  • 124
    • 0020866664 scopus 로고
    • Hierarchical Indices in System Adequacy Assessment
    • paper 83-SP-146, Vancouver, Mar
    • “Hierarchical Indices in System Adequacy Assessment,” R. Billinton, J.S. latla, CEA Trans., Engineering and Operating Division, vol. 22, Part 3, paper 83-SP-146, Vancouver, Mar 1983.
    • (1983) CEA Trans., Engineering and Operating Division , vol.22
    • Billinton, R.1    Latla, J.S.2
  • 125
    • 0020734439 scopus 로고
    • Probabilistic Flows for Reliability Evaluation of Multiarea Power System Interconnections
    • Apr
    • “Probabilistic Flows for Reliability Evaluation of Multiarea Power System Interconnections,” D.P. Clancy, G. Gross, F.F. Wu, Int. Journal of Electrical Power and Energy Systems, vol. 5, no. 2, Apr 1983, 101–114.
    • (1983) Int. Journal of Electrical Power and Energy Systems , vol.5 , Issue.2 , pp. 101-114
    • Clancy, D.P.1    Gross, G.2    Wu, F.F.3
  • 126
    • 0020766624 scopus 로고
    • Composite Generation and Transmission System Adequacy Evaluation Including Protection System Failure Modes
    • Jun
    • “Composite Generation and Transmission System Adequacy Evaluation Including Protection System Failure Modes,” R. Billinton, J. latla, IEEE Trans. on PAS, vol. PAS-102, no. 6, Jun 1983, 1823–1830.
    • (1983) IEEE Trans. on PAS , vol.PAS-102 , Issue.6 , pp. 1823-1830
    • Billinton, R.1    Latla, J.2
  • 127
    • 0020943182 scopus 로고
    • Countering Calamitous System Disturbances
    • IEE Conference Publication no. 225, London, Sep
    • “Countering Calamitous System Disturbances,” W.R. Lachs, Third Int. Conference on Reliability of Power Supply Systems, IEE Conference Publication no. 225, London, Sep 1983, 79–83.
    • (1983) Third Int. Conference on Reliability of Power Supply Systems , pp. 79-83
    • Lachs, W.R.1
  • 129
    • 0020938369 scopus 로고
    • Influence of Limited Transmission Capacity on the Reliability of Power Systems
    • IEE Conference Publication no. 225, London, Sep
    • “Influence of Limited Transmission Capacity on the Reliability of Power Systems,” K.W. Edwin, W. G. Lehr, Third Int. Conference on Reliability of Power Supply Systems, IEE Conference Publication no. 225, London, Sep 1983, 93–98.
    • (1983) Third Int. Conference on Reliability of Power Supply Systems , pp. 93-98
    • Edwin, K.W.1    Lehr, W.G.2
  • 130
    • 0020822080 scopus 로고
    • A Reliability Assessment of the Western Canada Grid
    • Sep
    • “A Reliability Assessment of the Western Canada Grid,” P.R.S. Kuruganty, P.R. Thompson, R. Billinton, IEEE Trans. on PAS, vol. PAS-102, no. 9, Sep 1983, 2826–2833.
    • (1983) IEEE Trans. on PAS , vol.PAS-102 , Issue.9 , pp. 2826-2833
    • Kuruganty, P.R.S.1    Thompson, R.2    Billinton, R.3
  • 131
    • 0020498108 scopus 로고
    • Direct Method for Evaluation of Bulk Power System Reliability - Part I - Theoretic Foundation
    • “Direct Method for Evaluation of Bulk Power System Reliability - Part I - Theoretic Foundation,” K. Moslehi, F.F. Wu, Int. Journal of Electrical Power and Energy Systems, no. 5, 1983, 3–7.
    • (1983) Int. Journal of Electrical Power and Energy Systems , Issue.5 , pp. 3-7
    • Moslehi, K.1    Wu, F.F.2
  • 132
    • 0020588808 scopus 로고
    • Direct Method for Evaluation of Bulk Power System Reliability - Part 2 - Solution Algorithm
    • “Direct Method for Evaluation of Bulk Power System Reliability - Part 2 - Solution Algorithm,” K. Moslehi, F.F. Wu, Int. Journal of Electrical Power and Energy Systems, no. 5, 1983, 8–16.
    • (1983) Int. Journal of Electrical Power and Energy Systems , Issue.5 , pp. 8-16
    • Moslehi, K.1    Wu, F.F.2
  • 135
    • 0020544302 scopus 로고
    • Reliability Equivalents - Power System Applications
    • “Reliability Equivalents - Power System Applications,” R. Billinton, K.L. Hossain, Reliability Engineering, 1983, 239–257.
    • (1983) Reliability Engineering , pp. 239-257
    • Billinton, R.1    Hossain, K.L.2
  • 136
    • 0020590204 scopus 로고
    • Bulk Power System Reliability Evaluation via Contingency Simulation
    • on Systems Theory, Hunstvilie, AL, USA
    • “Bulk Power System Reliability Evaluation via Contingency Simulation,” A.P. Meliopoulos, A. Bakirtzis, R.P. Webb, Proc. of the Southeastern Symp, on Systems Theory, Hunstvilie, AL, USA, 1983, 210–214.
    • (1983) Proc. of the Southeastern Symp , pp. 210-214
    • Meliopoulos, A.P.1    Bakirtzis, A.2    Webb, R.P.3
  • 137
    • 0021392742 scopus 로고
    • Power System Reliability in Perspective
    • Mar
    • “Power System Reliability in Perspective,” R. Billinton, R.N. Allan, IEE Electronics and Power, vol. 30, no. 3, Mar 1984, 231–236.
    • (1984) IEE Electronics and Power , vol.30 , Issue.3 , pp. 231-236
    • Billinton, R.1    Allan, R.N.2
  • 138
    • 84916830131 scopus 로고
    • Methods and Models for Electroenergetic Systems Reliability Analysis
    • Caderno de Engenharia Eletrica, Apr, (in Portuguese)
    • “Methods and Models for Electroenergetic Systems Reliability Analysis,” M.Th. Schilling, J.C.G. Praca, R.N. Fontoura Filho, J.F. de Queiroz, K.H. Lee, Revista Brasileira de Engenharia, Caderno de Engenharia Eletrica, vol. 1, no. 1, Apr 1984, 43–68 (in Portuguese).
    • (1984) Revista Brasileira de Engenharia , vol.1-1 , pp. 43-68
    • Schilling, M.T.1    Praca, J.C.G.2    Filho, R.N.F.3    de Queiroz, J.F.4    Lee, K.H.5
  • 140
    • 0021421796 scopus 로고
    • Power System Reliability Evaluation Using Stochastic Load Flows
    • May
    • “Power System Reliability Evaluation Using Stochastic Load Flows,” A.P. Meliopoulos, A.G. Bakirtzis, R. Kovacs, IEEE Trans. on PAS, vol. PAS-103, no. 5, May 1984, 1084–1091.
    • (1984) IEEE Trans. on PAS , vol.PAS-103 , Issue.5 , pp. 1084-1091
    • Meliopoulos, A.P.1    Bakirtzis, A.G.2    Kovacs, R.3
  • 141
    • 84944989493 scopus 로고
    • Taking into Account Service Quality and Operation Security in Planning Studies for EHV Systems: The MEXICO and ANASEC Models
    • Budapest, Jul
    • “Taking into Account Service Quality and Operation Security in Planning Studies for EHV Systems: The MEXICO and ANASEC Models,” J. Batut, J.C. Dodu, A. Merlin, IFAC Proc., Budapest, Jul 1984.
    • (1984) IFAC Proc.
    • Batut, J.1    Dodu, J.C.2    Merlin, A.3
  • 143
    • 0021660902 scopus 로고
    • Transmission System Reliability Assessment by Contingency Enumeration
    • Aug
    • “Transmission System Reliability Assessment by Contingency Enumeration,” B.P. Lam, D.J. Lawrence, N.D. Reppen, N.J. Balu, Proc. 8th PSCC, Helsinki, Aug 1984, 179–183.
    • (1984) Proc. 8th PSCC, Helsinki , pp. 179-183
    • Lam, B.P.1    Lawrence, D.J.2    Reppen, N.D.3    Balu, N.J.4
  • 144
    • 0021477081 scopus 로고
    • Computation of Upper and Lower Bounds on Reliability Indices for Bulk Power Systems
    • Aug
    • “Computation of Upper and Lower Bounds on Reliability Indices for Bulk Power Systems,” K. A. Clements, B.P. Lam, D.J. Lawrence, N.D. Reppen, IEEE Trans. on PAS, vol. PAS-103, no. 8, Aug 1984, 2318–2325.
    • (1984) IEEE Trans. on PAS , vol.PAS-103 , Issue.8 , pp. 2318-2325
    • Clements, K.A.1    Lam, B.P.2    Lawrence, D.J.3    Reppen, N.D.4
  • 146
    • 0021494176 scopus 로고
    • Static Transmission Capacity Expansion Planning Under Uncertainty
    • Sep
    • “Static Transmission Capacity Expansion Planning Under Uncertainty,” I.A.M. Sharaf, G.J. Berg, Electric Power Systems Research, vol. 7, no. 4, Sep 1984, 289–296.
    • (1984) Electric Power Systems Research , vol.7 , Issue.4 , pp. 289-296
    • Sharaf, I.A.M.1    Berg, G.J.2
  • 147
    • 0021494967 scopus 로고
    • A Method for Bulk Power System Reliability Evaluation Based on Local Coherency
    • Sep
    • “A Method for Bulk Power System Reliability Evaluation Based on Local Coherency,” K. Moslehi, F.F. Wu, Electric Power Systems Research, vol. 7, no. 4, Sep 1984, 307–319.
    • (1984) Electric Power Systems Research , vol.7 , Issue.4 , pp. 307-319
    • Moslehi, K.1    Wu, F.F.2
  • 150
    • 0021539022 scopus 로고
    • Reliability Evaluation Based on Emergency Dispatch Evaluation and External Equivalents of Power Systems
    • EUROCON 84, Brighton, England
    • “Reliability Evaluation Based on Emergency Dispatch Evaluation and External Equivalents of Power Systems,” M.A. El-Kady, M.S. El-Sobki, N.K. Sinha, Proc. 6th European Conference on Electrotechnics, EUROCON 84, Brighton, England, 1984, 373–378.
    • (1984) Proc. 6th European Conference on Electrotechnics , pp. 373-378
    • El-Kady, M.A.1    El-Sobki, M.S.2    Sinha, N.K.3
  • 151
    • 84941861139 scopus 로고
    • Adequacy Evaluation of a Composite Power System - A Comparative Study of Existing Computer Programs
    • paper 85-SP-141, Montreal, Mar
    • “Adequacy Evaluation of a Composite Power System - A Comparative Study of Existing Computer Programs,” R. Billinton, S. Kumar, Trans. of CEA, Engineering and Operating Division, vol. 24, Part 3, paper 85-SP-141, Montreal, Mar 1985.
    • (1985) Trans. of CEA, Engineering and Operating Division , vol.24
    • Billinton, R.1    Kumar, S.2
  • 152
    • 84944979069 scopus 로고
    • Reliability Equivalent Models in the Reliability Evaluation of Electric Power Systems
    • Apr
    • “Reliability Equivalent Models in the Reliability Evaluation of Electric Power Systems,” E. Roos, Etz Archiv, vol. 7, no. 4, Apr 1985. 143–146.
    • (1985) Etz Archiv , vol.7 , Issue.4 , pp. 143-146
    • Roos, E.1
  • 153
    • 0022331882 scopus 로고
    • Bulk Power System Reliability Assessment Experience with the RECS Program
    • May, (Note: This paper is also published on IEEE Trans. on PWRS, vol. PWRS-1, no. 3, Aug 1986, 235-243.)
    • “Bulk Power System Reliability Assessment Experience with the RECS Program,” A.P. Meliopoulos, A.G. Bakirtizis, R.R. Kovacs, R.J. Beck, Proc. PICA, May 1985, 38–46. (Note: This paper is also published on IEEE Trans. on PWRS, vol. PWRS-1, no. 3, Aug 1986, 235-243.)
    • (1985) Proc. PICA , pp. 38-46
    • Meliopoulos, A.P.1    Bakirtizis, A.G.2    Kovacs, R.R.3    Beck, R.J.4
  • 154
    • 0022134311 scopus 로고
    • Effect of Station Originated Outages in a Composite System Adequacy Evaluation of the IEEE Reliability lest System
    • Oct
    • “Effect of Station Originated Outages in a Composite System Adequacy Evaluation of the IEEE Reliability lest System,” R. Billinton, P.K. Vohra, S. Kumar, IEEE rans. on PAS, vol. PAS-104, no. 10, Oct 1985, 2649–2656.
    • (1985) IEEE rans. on PAS , vol.PAS-104 , Issue.10 , pp. 2649-2656
    • Billinton, R.1    Vohra, P.K.2    Kumar, S.3
  • 155
    • 0022133805 scopus 로고
    • Composite Generation and Transmission Reliability Evaluation in Large Hydroelectric Systems
    • Oct
    • “Composite Generation and Transmission Reliability Evaluation in Large Hydroelectric Systems,” S.H.F. Cunha, M.V.F. Pereira, L.M.V.G. Pinto, G.C. Oliveria, IEEE Trans. on PAS, vol. PAS-104, no. 10, Oct 1985, 2657–2664.
    • (1985) IEEE Trans. on PAS , vol.PAS-104 , Issue.10 , pp. 2657-2664
    • Cunha, S.H.F.1    Pereira, M.V.F.2    Pinto, L.M.V.G.3    Oliveria, G.C.4
  • 156
    • 0022149383 scopus 로고
    • The Procedure Used in the Probabilistic Transfer Capability Analysis of the MAPP Region Bulk transmission System
    • Nov
    • “The Procedure Used in the Probabilistic ‘Transfer Capability Analysis of the MAPP Region Bulk transmission System,” M.G. Lauby, J.H. Doudna, R.W. Polesky, P.J. Lehman, D.D. Klempel, IEEE Trans. on PAS, vol. PAS-104, no. 11, Nov 1985, 3013–3019.
    • (1985) IEEE Trans. on PAS , vol.PAS-104 , Issue.11 , pp. 3013-3019
    • Lauby, M.G.1    Doudna, J.H.2    Polesky, R.W.3    Lehman, P.J.4    Klempel, D.D.5
  • 157
    • 0022246040 scopus 로고
    • A Comparison Between Two Fundamentally Different Approaches to Composite System Reliability Evaluation
    • Dec
    • “A Comparison Between Two Fundamentally Different Approaches to Composite System Reliability Evaluation,” L. Salvaderi, R. Billinton, IEEE frans. on PAS, vol. PAS-104, no. 12, Dec 1985, 3486–3493.
    • (1985) IEEE frans. on PAS , vol.PAS-104 , Issue.12 , pp. 3486-3493
    • Salvaderi, L.1    Billinton, R.2
  • 158
    • 0022242048 scopus 로고
    • Modeling Simultaneous Outages for Bulk Power System Reliability-Analysis
    • Dec
    • “Modeling Simultaneous Outages for Bulk Power System Reliability-Analysis,” J.M. Nahman, IEEE Irans. on R., vol. R-34, no. 5, Dec 1985, 554–559.
    • (1985) IEEE Irans. on R , vol.R-34 , Issue.5 , pp. 554-559
    • Nahman, J.M.1
  • 159
    • 0022206995 scopus 로고
    • Evaluation of the Reliability of Large-Scale Power Systems Using a Monte Carlo Method
    • Toronto, Canada
    • “Evaluation of the Reliability of Large-Scale Power Systems Using a Monte Carlo Method,” M.A. El-Kady, M.S. El-Sobki, N.K. Sinha, Proc. IEEE ELECTRONICOM 85, Toronto, Canada, 1985, 338–342.
    • (1985) Proc. IEEE ELECTRONICOM 85 , pp. 338-342
    • El-Kady, M.A.1    El-Sobki, M.S.2    Sinha, N.K.3
  • 160
    • 0022700780 scopus 로고
    • Reliability Evaluation for Optimally Operated, Large, Electric Power Systems
    • Apr
    • “Reliability Evaluation for Optimally Operated, Large, Electric Power Systems,” M.A. El-Kady, M.S. El-Sobki, N.K. Sinha, IEEE Trans. on R, vol R-35, no. 1, Apr 1986, 41–47.
    • (1986) IEEE Trans. on R , vol.R-35 , Issue.1 , pp. 41-47
    • El-Kady, M.A.1    El-Sobki, M.S.2    Sinha, N.K.3
  • 161
    • 0037585513 scopus 로고
    • Production Costing and Reliability Evaluation for Composite Systems with Outages and Uncertainties
    • May
    • “Production Costing and Reliability Evaluation for Composite Systems with Outages and Uncertainties,” C.L. Su, T.H. Lee, T.S. Wu, C.L. Huang, Electric Power Systems Research, vol 10, no. 3, May 1986, 215–222.
    • (1986) Electric Power Systems Research , vol.10 , Issue.3 , pp. 215-222
    • Su, C.L.1    Lee, T.H.2    Wu, T.S.3    Huang, C.L.4
  • 163
    • 84944984749 scopus 로고
    • A Novel Algorithm for Static Security Analysis
    • Edited by Wang Pingyang, Beijing, China, Aug 12-15
    • “A Novel Algorithm for Static Security Analysis,” M. Wang, J. Wu, IFAC Symp. on Power Systems and Power Plant Control, Edited by Wang Pingyang, Beijing, China, Aug 12-15, 1986, 217–222.
    • (1986) IFAC Symp. on Power Systems and Power Plant Control , pp. 217-222
    • Wang, M.1    Wu, J.2
  • 164
    • 0022768026 scopus 로고
    • A Comparative Study of System Versus Load Point Indices for Bulk Power Systems
    • Aug
    • “A Comparative Study of System Versus Load Point Indices for Bulk Power Systems,” R. Billinton, S. Kumar, IEEE Trans. on PWRS, vol. PWRS-1, no. 3, Aug 1986, 148–156.
    • (1986) IEEE Trans. on PWRS , vol.PWRS-1 , Issue.3 , pp. 148-156
    • Billinton, R.1    Kumar, S.2
  • 165
    • 0022108645 scopus 로고
    • New Probabilistic Approach Taking into Account Reliability and Operation Security in EHV Power System Planning at EDF
    • Aug
    • “New Probabilistic Approach Taking into Account Reliability and Operation Security in EHV Power System Planning at EDF,” J.C. Dodu, A. Merlin, IEEE Trans. on PWRS, vol. PWRS-1, no. 3, Aug 1986, 175-181.
    • (1986) IEEE Trans. on PWRS , vol.PWRS-1 , Issue.3 , pp. 175-181
    • Dodu, J.C.1    Merlin, A.2
  • 166
    • 3943071476 scopus 로고
    • Incorporation of Weather Effects in Transmission System Models for Composite System Adequacy Evaluation
    • Sep
    • “Incorporation of Weather Effects in Transmission System Models for Composite System Adequacy Evaluation,” R. Billinton, L. Cheng, Proc. IEE, 133 part C, no. 6, Sep 1986, 319–327.
    • (1986) Proc. IEE , vol.133 , Issue.6 , pp. 319-327
    • Billinton, R.1    Cheng, L.2
  • 167
    • 84944989497 scopus 로고
    • Special Report for the Joint Meeting of Groups 37, 38, 39 on Power Systems Reliability
    • Paris, Sep
    • “Special Report for the Joint Meeting of Groups 37, 38, 39 on Power Systems Reliability,” P. Sandrin, CIGRE, 37/38/39-00, Paris, Sep 1986.
    • (1986) CIGRE, 37/38/39-00
    • Sandrin, P.1
  • 168
    • 84944989321 scopus 로고
    • Disturbance Performance of Bulk Electricity Systems
    • Paris, Sep
    • “Disturbance Performance of Bulk Electricity Systems,” W.H. Winter, B.K. LeReverend, CIGRE, 37/38/39-02, Paris, Sep 1986.
    • (1986) CIGRE, 37/38/39-02
    • Winter, W.H.1    LeReverend, B.K.2
  • 169
    • 84944989499 scopus 로고
    • Reliability Coordination in Electric Power Systems
    • Sep
    • “Reliability Coordination in Electric Power Systems,” M. Valtorta, G. Manzoni, CIGRE 37/38/39-08, Paris, Sep 1986.
    • (1986) CIGRE 37/38/39-08, Paris
    • Valtorta, M.1    Manzoni, G.2
  • 170
    • 84944989500 scopus 로고
    • Power System Reliability: The Planner's Approach
    • Sep
    • “Power System Reliability: The Planner's Approach,” P. Sandrin, CIGRE, 37/38/39-07, Paris, Sep 1986.
    • (1986) CIGRE, 37/38/39-07, Paris
    • Sandrin, P.1
  • 173
    • 0022934162 scopus 로고
    • Analytical Methods for Evaluating Power System Transfer Capability: A Probabilistic Approach
    • Sep
    • “Analytical Methods for Evaluating Power System Transfer Capability: A Probabilistic Approach,” I. Facchinei, S. Nevaloro, G. Nicola, S. Scalcino, CIGRE, 37–09, Paris, Sep 1986.
    • (1986) CIGRE, 37–09, Paris
    • Facchinei, I.1    Nevaloro, S.2    Nicola, G.3    Scalcino, S.4
  • 174
    • 84944986287 scopus 로고
    • Operational Objectives and Criteria for Power System Operation
    • Oct
    • “Operational Objectives and Criteria for Power System Operation,” E. Hagenmeyer, Electra (CIGRE), no. 108, Oct 1986, 127–156.
    • (1986) Electra (CIGRE) , Issue.108 , pp. 127-156
    • Hagenmeyer, E.1
  • 175
    • 0022807554 scopus 로고
    • The IEEE Reliability Test System - Extensions to and Evaluation of the Generating System
    • Nov
    • “The IEEE Reliability Test System - Extensions to and Evaluation of the Generating System,” R.N. Allan, R. Billinton, N.M.K. Abdel-Gawad, IEEE Trans. on PWRS, vol. PWRS-1, no. 4, Nov 1986, 1–7.
    • (1986) IEEE Trans. on PWRS , vol.PWRS-1 , Issue.4 , pp. 1-7
    • Allan, R.N.1    Billinton, R.2    Abdel-Gawad, N.M.K.3
  • 176
    • 84921093523 scopus 로고
    • System Reliability Seeing the Whole Picture
    • Nov
    • “System Reliability Seeing the Whole Picture,” J. Douglas, EPRI Journal, Nov 1986, 30–35.
    • (1986) EPRI Journal , pp. 30-35
    • Douglas, J.1
  • 177
    • 0042629886 scopus 로고
    • Pertinent Factors in the Adequacy Assessment of a Composite Generation and Transmission System
    • paper 86-SP-141, Toronto
    • “Pertinent Factors in the Adequacy Assessment of a Composite Generation and Transmission System,” R. Billinton, S. Kumar, Trans. of CEA, Engineering and Operating Division, vol. 25, Part 3, paper 86-SP-141, Toronto, 1986.
    • (1986) Trans. of CEA, Engineering and Operating Division , vol.25
    • Billinton, R.1    Kumar, S.2
  • 178
    • 84944989504 scopus 로고
    • Computational Model for Composite Reliability Analysis of Large Scale Power Systems
    • Sao Paulo, Brazil, (in Portuguese)
    • “Computational Model for Composite Reliability Analysis of Large Scale Power Systems,” D.S. Ramos, E.J. Robba, N. Kagan, H. Prieto, 8th Brazilian Power System Seminar (SNPIEE), CESP, Sao Paulo, Brazil, 1986 (in Portuguese).
    • (1986) 8th Brazilian Power System Seminar (SNPIEE), CESP
    • Ramos, D.S.1    Robba, E.J.2    Kagan, N.3    Prieto, H.4
  • 180
    • 84944982474 scopus 로고
    • Comparison of Computer Programs for Power Systems Composite Reliability Evaluation
    • Belo Horizonte, Brazil, Nov (in Portuguese)
    • “Comparison of Computer Programs for Power Systems Composite Reliability Evaluation,” R.N. Fontoura Filho, J.F. de Queiroz, Proc. of the 6th Brazilian Congress on Automatic Control (CBA), vol. 1, Belo Horizonte, Brazil, Nov 1986, 786–792 (in Portuguese).
    • (1986) Proc. of the 6th Brazilian Congress on Automatic Control (CBA) , vol.1 , pp. 786-792
    • Filho, R.N.F.1    de Queiroz, J.F.2
  • 181
    • 0023156860 scopus 로고
    • Station-Initiated Outages in Composite-System Adequacy Evaluation
    • Jan
    • “Station-Initiated Outages in Composite-System Adequacy Evaluation,” R. Billinton, P.K. Vohra, Proc. IEE, 134 Part C, no. 1, Jan 1987, 10–16.
    • (1987) Proc. IEE , vol.134 , Issue.1 , pp. 10-16
    • Billinton, R.1    Vohra, P.K.2
  • 182
    • 0023133728 scopus 로고
    • Effect of Higher Level Independent Generator Outages in Composite System Adequacy Evaluation
    • “Effect of Higher Level Independent Generator Outages in Composite System Adequacy Evaluation,” R. Billinton, S. Kumar, Proc. IEE, 134 Part C, 1987, 17–30.
    • (1987) Proc. IEE , vol.134 , pp. 17-30
    • Billinton, R.1    Kumar, S.2
  • 183
    • 0023345268 scopus 로고
    • Reliability Equivalents in Composite System Reliability Evaluation
    • “Reliability Equivalents in Composite System Reliability Evaluation,” R. Billinton, H.J. Koglin, E. Roos, Proc. IEE, 134 Part C, 1987, 224–233.
    • (1987) Proc. IEE , vol.134 , pp. 224-233
    • Billinton, R.1    Koglin, H.J.2    Roos, E.3
  • 184
    • 0023170630 scopus 로고
    • Reliability Criteria Used in Various Countries
    • Jan
    • “Reliability Criteria Used in Various Countries,” R. Juseret, Electra (CIGRE), no. 110, Jan 1987, 67–101.
    • (1987) Electra (CIGRE) , Issue.110 , pp. 67-101
    • Juseret, R.1
  • 189
    • 84944989507 scopus 로고
    • Reliability Integration in Power System Planning: Potentialities and Application Experiences
    • Buenos Aires, Argentina, May (in Portuguese)
    • “Reliability Integration in Power System Planning: Potentialities and Application Experiences,” M. Morozowski Filho, D.S. Ramos, M.Th. Schilling, Annals of the Latin- American Seminar on Power System Planning, vol. 5, Buenos Aires, Argentina, May 1987 (in Portuguese).
    • (1987) Annals of the Latin- American Seminar on Power System Planning , vol.5
    • Filho, M.M.1    Ramos, D.S.2    Schilling, M.T.3
  • 191
    • 0023402014 scopus 로고
    • Low Bus Voltage and Ill-Conditioned Network Situations in a Composite System Adequacy Evaluation
    • Aug
    • “Low Bus Voltage and Ill-Conditioned Network Situations in a Composite System Adequacy Evaluation,” S. Kumar, R. Billinton, IEEE Trans. on PWRS, vol. PWRS-2, no. 3, Aug 1987, 652–659.
    • (1987) IEEE Trans. on PWRS , vol.PWRS-2 , Issue.3 , pp. 652-659
    • Kumar, S.1    Billinton, R.2
  • 192
    • 6244271716 scopus 로고
    • Inaccuracies in Power System Reliability Evaluation
    • Sep
    • “Inaccuracies in Power System Reliability Evaluation,” H.W. Wellssow, Proc. 9th PSCC, Cascals, Sep 1987, 133–139.
    • (1987) Proc. 9th PSCC, Cascals , pp. 133-139
    • Wellssow, H.W.1
  • 193
    • 84944989509 scopus 로고
    • Expansion Planning of Power Transmission Network with Reliability Constraint
    • Sep
    • “Expansion Planning of Power Transmission Network with Reliability Constraint,” W. Wei-jing, Y. Zhi-dong, Proc. 9th PSCC, Cascals, Sep 1987, 455–459.
    • (1987) Proc. 9th PSCC, Cascals , pp. 455-459
    • Wei-jing, W.1    Zhi-dong, Y.2
  • 194
    • 84944985056 scopus 로고
    • A Monte Carlo Simulation Approach to the Reliability Modeling of Interconnected Systems Recognizing Operating Considerations
    • Sep
    • “A Monte Carlo Simulation Approach to the Reliability Modeling of Interconnected Systems Recognizing Operating Considerations,” A.D. Patton, J.H. Blackstone, N.J. Balu, Proc. 9th PSCC, Cascais, Sep 1987, 966–972.
    • (1987) Proc. 9th PSCC, Cascais , pp. 966-972
    • Patton, A.D.1    Blackstone, J.H.2    Balu, N.J.3
  • 195
    • 84944989510 scopus 로고
    • Reliability Evaluation of the Planned Brazilian Transmission System
    • ii, Group VII, GPL, Paper BH/GPL/07, Belo Horizonte, Brazil, Oct (in Portuguese)
    • “Reliability Evaluation of the Planned Brazilian Transmission System,” E.L. da Silva et alii, 9th Brazilian Power System Seminar (SNPTEE), Group VII, GPL, Paper BH/GPL/07, Belo Horizonte, Brazil, Oct 1987 (in Portuguese).
    • (1987) 9th Brazilian Power System Seminar (SNPTEE)
    • da Silva, E.L.1
  • 196
  • 197
    • 0023365859 scopus 로고
    • Load Supplying Capability of Interconnected Power Systems: A Probabilistic Approach
    • “Load Supplying Capability of Interconnected Power Systems: A Probabilistic Approach,” M. Brucoli, M. La Scala, F. lorelli, M. Trovato, Electric Power Systems Research, vol. 12, 1987, 183–190.
    • (1987) Electric Power Systems Research , vol.12 , pp. 183-190
    • Brucoli, M.1    La Scala, M.2    Lorelli, F.3    Trovato, M.4
  • 202
    • 0023590664 scopus 로고
    • Statistical Analysis of Power Systems Using the Adjoint and Monte Carlo Methods
    • Edited by S. Krishnasamy, Pergamon Press, Oxford
    • “Statistical Analysis of Power Systems Using the Adjoint and Monte Carlo Methods,” S.L. Cress, Proc. of the First int. Symp. on Probabilistic Methods Applied to Electric Power Systems, Edited by S. Krishnasamy, Pergamon Press, Oxford, 1987, 203–212.
    • (1987) Proc. of the First int. Symp. on Probabilistic Methods Applied to Electric Power Systems , pp. 203-212
    • Cress, S.L.1
  • 205
    • 0023290646 scopus 로고
    • Modeling and Assessment of Station Originated Outages for Composite Systems Reliability Evaluation
    • Feb
    • “Modeling and Assessment of Station Originated Outages for Composite Systems Reliability Evaluation,” R.N. Allan, J.R. Ochoa, IEEE Trans. on PWRS, vol. PWRS-3, no. 1, Feb 1988, 158–165.
    • (1988) IEEE Trans. on PWRS , vol.PWRS-3 , Issue.1 , pp. 158-165
    • Allan, R.N.1    Ochoa, J.R.2
  • 206
    • 0023981753 scopus 로고
    • Realistic Power System Security Algorithm
    • Mar
    • “Realistic Power System Security Algorithm,” A. Mohamed, G.B. Jasmon, IEE Proc., vol. 135, Part C, no. 2, Mar 1988, 98–106.
    • (1988) IEE Proc. , vol.135 , Issue.2 , pp. 98-106
    • Mohamed, A.1    Jasmon, G.B.2
  • 207
    • 84944989512 scopus 로고
    • Adequacy Equivalents in Composite Power System Evaluation - Basic Concepts and System Studies
    • Spring Meeting, Montreal
    • “Adequacy Equivalents in Composite Power System Evaluation - Basic Concepts and System Studies,” R. Billinton, S. Kumar, CEA, Power System Planning and Operating Section, Spring Meeting, Montreal, 1988.
    • (1988) CEA, Power System Planning and Operating Section
    • Billinton, R.1    Kumar, S.2
  • 208
    • 84944989513 scopus 로고
    • Application of Probabilistic Transfer Capability Analysis in Transmission System Performance Studies
    • Paris
    • “Application of Probabilistic Transfer Capability Analysis in Transmission System Performance Studies,” R.M. Maliszewski, M. Chau, CIGRE, 38–01, Paris 1988.
    • (1988) CIGRE, 38–01
    • Maliszewski, R.M.1    Chau, M.2
  • 210
    • 84944989515 scopus 로고
    • Determination of Security and Quality Levels in Operational Planning Studies and Interactions with Real Time Operation
    • Paris
    • “Determination of Security and Quality Levels in Operational Planning Studies and Interactions with Real Time Operation,” X. Vieira Filho, J.J.G. Couri, H.J. Chipp, E. Nery, M. Hirota, CIGRE, 39–02, Paris, 1988.
    • (1988) CIGRE, 39–02
    • Filho, X.V.1    Couri, J.J.G.2    Chipp, H.J.3    Nery, E.4    Hirota, M.5
  • 211
    • 84944989516 scopus 로고
    • Power System Performance and Reactive Scheduling. Part 1: Voltage, Frequency and Delivery Point Performance of Bulk Electricity Systems
    • Paris
    • “Power System Performance and Reactive Scheduling. Part 1: Voltage, Frequency and Delivery Point Performance of Bulk Electricity Systems,” W.H. Winter, B.K. LeReverend, CIGRE 39–18, Paris, 1988.
    • (1988) CIGRE 39–18
    • Winter, W.H.1    LeReverend, B.K.2
  • 212
    • 0023839605 scopus 로고
    • Further Analysis of Disturbance Performance of Bulk Electricity Systems
    • Jan
    • “Further Analysis of Disturbance Performance of Bulk Electricity Systems,” T.S. Iran, Electra (CIGNE) no. 116, Jan 1988, 51-60.
    • (1988) Electra (CIGNE) , Issue.116 , pp. 51-60
    • Iran, T.S.1
  • 213
    • 0023290729 scopus 로고
    • Multiobjective Optimal Generation Dispatch Based on Probability Security Criteria
    • Feb
    • “Multiobjective Optimal Generation Dispatch Based on Probability Security Criteria,” R. Yokoyama, S.H. Bae, I. Morita, H. Sasaki, IEEE Irans. on PWRS, vol. PWRS-3, no 1, Feb 1988, 317-324.
    • (1988) IEEE Irans. on PWRS , vol.PWRS-3 , Issue.1 , pp. 317-324
    • Yokoyama, R.1    Bae, S.H.2    Morita, I.3    Sasaki, H.4
  • 215
  • 216
    • 84944989519 scopus 로고
    • Joint Development of Consistent Bulk Transmission Outage Reporting and Analysis Procedures by Two NERC Regions
    • Paper 88 SM 675–1, Jul
    • “Joint Development of Consistent Bulk Transmission Outage Reporting and Analysis Procedures by Two NERC Regions,” M.G. Lauby, IEEE PES Summer Meeting, Paper 88 SM 675–1, Jul 1988.
    • (1988) IEEE PES Summer Meeting
    • Lauby, M.G.1
  • 220
    • 84944989523 scopus 로고
    • Development of a Composite Reliability Evaluation Program for the Brazilian System - Proposal and Status of Ongoing Research
    • Sep 20–23
    • “Development of a Composite Reliability Evaluation Program for the Brazilian System - Proposal and Status of Ongoing Research,” R. Fontoura Filho, M.V.F. Pereira, 2nd. Int. Symp. on Probability Methods Applied to Power Systems, Oakland, USA, Sep 20–23, 1988.
    • (1988) 2nd. Int. Symp. on Probability Methods Applied to Power Systems, Oakland, USA
    • Filho, R.F.1    Pereira, M.V.F.2
  • 223
    • 0024051064 scopus 로고
    • Application of Reliability Evaluation Methods to the Planning of Large Hydroelectric Systems
    • Jul
    • “Application of Reliability Evaluation Methods to the Planning of Large Hydroelectric Systems,” M.V.F. Pereira, S.H.F. Cunha, G.C. Oliveira, Int. Journal of Electrical Power and Energy Systems, vol. 10, no. 3, Jul 1988, 142–160.
    • (1988) Int. Journal of Electrical Power and Energy Systems , vol.10 , Issue.3 , pp. 142-160
    • Pereira, M.V.F.1    Cunha, S.H.F.2    Oliveira, G.C.3
  • 224
    • 0024053658 scopus 로고
    • Procedures, Experience and Application of Bulk Power Reliability Evaluation at ENEL, Italy
    • Jul
    • “Procedures, Experience and Application of Bulk Power Reliability Evaluation at ENEL, Italy,” L. Salvaderi, Int. Journal of Electrical Power and Energy Systems, vol. 10, no. 3, Jul 1988, 156–167.
    • (1988) Int. Journal of Electrical Power and Energy Systems , vol.10 , Issue.3 , pp. 156-167
    • Salvaderi, L.1
  • 225
    • 0024047924 scopus 로고
    • Different Approaches to Reliability as Applied to the Generation-Transmission System and Its Components
    • Jul
    • “Different Approaches to Reliability as Applied to the Generation-Transmission System and Its Components,” J. Batut, J. Boisseau, E. Bourgade, M. Monti, Int. Journal of Electrical Power and Energy Systems, vol. 10, no. 3, Jul 1988, pp. 168-173.
    • (1988) Int. Journal of Electrical Power and Energy Systems , vol.10 , Issue.3 , pp. 168-173
    • Batut, J.1    Boisseau, J.2    Bourgade, E.3    Monti, M.4
  • 227
    • 0024047925 scopus 로고
    • Effects of Protection Systems Operation and Failures in Composite System Reliability Evaluation
    • Jul
    • “Effects of Protection Systems Operation and Failures in Composite System Reliability Evaluation,” R.N. Allan, Int. Journal of Electrical Power and Energy Systems, vol. 10, no. 3, Jul 1988, 180–189.
    • (1988) Int. Journal of Electrical Power and Energy Systems , vol.10 , Issue.3 , pp. 180-189
    • Allan, R.N.1
  • 228
    • 0000187083 scopus 로고
    • Evaluation of a Local DC Load Flow Screening Method for Branch Contingency Selection of Overloads
    • Aug
    • “Evaluation of a Local DC Load Flow Screening Method for Branch Contingency Selection of Overloads,” M.G. Lauby, IEEE Trans. on PWRS, vol. PWRS 3, no. 3, Aug 1988, 923–928.
    • (1988) IEEE Trans. on PWRS , vol.PWRS 3 , Issue.3 , pp. 923-928
    • Lauby, M.G.1
  • 229
    • 0024053999 scopus 로고
    • Monte Carlo Approach in Planing Studies: An Application to IEEE RIS
    • Aug
    • “Monte Carlo Approach in Planing Studies: An Application to IEEE RIS,” O. Bertoldi, L. Salvaderi, S. Scalcino, IEEE Trans. on PWRS, vol. PWRS-3, no. 3, Aug 1988, 1146–1154.
    • (1988) IEEE Trans. on PWRS , vol.PWRS-3 , Issue.3 , pp. 1146-1154
    • Bertoldi, O.1    Salvaderi, L.2    Scalcino, S.3
  • 230
    • 0024054212 scopus 로고
    • Adequacy Equivalents in Composite Power System Evaluation
    • Aug
    • “Adequacy Equivalents in Composite Power System Evaluation,” S. Kumar, R. Billinton, IEEE Trans. on PWRS, vol. PWRS-3, no. 3, Aug 1988, 1167–1173.
    • (1988) IEEE Trans. on PWRS , vol.PWRS-3 , Issue.3 , pp. 1167-1173
    • Kumar, S.1    Billinton, R.2
  • 231
    • 0024054745 scopus 로고
    • Reliability Evaluation in Power - System Transmission Planning: Practical Considerations
    • Aug
    • “Reliability Evaluation in Power - System Transmission Planning: Practical Considerations,” L.A.M. Sharaf, G.J. Berg, IEEE Trans. on R, vol. R-37, no. 3, Aug 1988, 274-279.
    • (1988) IEEE Trans. on R , vol.R-37 , Issue.3 , pp. 274-279
    • Sharaf, L.A.M.1    Berg, G.J.2
  • 232
    • 84944989526 scopus 로고
    • Bibliography - Application of Probability Methods in the Evaluation of Generating Capacity Requirements
    • Paper 64-SP-122
    • “Bibliography - Application of Probability Methods in the Evaluation of Generating Capacity Requirements,” R. Billinton, CEA Trans., vol 3, Part 3, Paper 64-SP-122, 1964.
    • (1964) CEA Trans. , vol.3
    • Billinton, R.1
  • 233
    • 84944989527 scopus 로고
    • Bibliography on the Application of Probability Methods in the Evaluation of Generation Capacity Planning
    • Paper 31 CP66-62, New York
    • “Bibliography on the Application of Probability Methods in the Evaluation of Generation Capacity Planning,” R. Billinton, IEEE Winter Power Meeting, Paper 31 CP66-62, New York, 1966.
    • (1966) IEEE Winter Power Meeting
    • Billinton, R.1
  • 235
    • 0015330713 scopus 로고
    • Bibliography on the Application of Probability Methods in Power System Reliability Evaluation
    • Mar/Apr
    • “Bibliography on the Application of Probability Methods in Power System Reliability Evaluation,” R. Billinton, IEEE Trans. on PAS, vol. PAS-91, Mar/Apr 1972, 649–660.
    • (1972) IEEE Trans. on PAS , vol.PAS-91 , pp. 649-660
    • Billinton, R.1
  • 236
    • 85095908720 scopus 로고
    • An Annotated Bibliography of Power System Reliability Literature – 1972-1977
    • Paper A 78 548–0, Los Angeles, Jul
    • “An Annotated Bibliography of Power System Reliability Literature – 1972-1977,” S. Vemuri, IEEE Summer Meeting, Paper A 78 548–0, Los Angeles, Jul 1978.
    • (1978) IEEE Summer Meeting
    • Vemuri, S.1
  • 237
    • 0018032476 scopus 로고
    • Bibliography on the Application of Probability Methods in Power System Reliability Evaluation, 1971-1977
    • IEEE Trans. on PAS
    • “Bibliography on the Application of Probability Methods in Power System Reliability Evaluation, 1971-1977,” IEEE Committee Report, IEEE Trans. on PAS, vol. PAS-97, 1978, 2235–2242.
    • (1978) IEEE Committee Report , vol.PAS-97 , pp. 2235-2242
  • 238
    • 0021375288 scopus 로고
    • Bibliography on the Application of Probability Methods in Power System Reliability Evaluation, 1977-1982
    • Feb
    • “Bibliography on the Application of Probability Methods in Power System Reliability Evaluation, 1977-1982,” R.N. Allan, R. Billinton, S.H. Lee, IEEE Trans. on PAS, vol. PAS-103, no. 2, Feb 1984, 275–282.
    • (1984) IEEE Trans. on PAS , vol.PAS-103 , Issue.2 , pp. 275-282
    • Allan, R.N.1    Billinton, R.2    Lee, S.H.3
  • 239
    • 0024103858 scopus 로고
    • Bibliography on the Application of Probability Methods in Power System Reliability Evaluation, 1982-1987
    • Paper 88 WM 172–9, New York, Feb
    • “Bibliography on the Application of Probability Methods in Power System Reliability Evaluation, 1982-1987,” R.N. Allan, R. Billinton, S.M. Shahidehpour, C. Singh, IEEE PES Winter Meeting, Paper 88 WM 172–9, New York, Feb 1988.
    • (1988) IEEE PES Winter Meeting
    • Allan, R.N.1    Billinton, R.2    Shahidehpour, S.M.3    Singh, C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.