메뉴 건너뛰기




Volumn 38, Issue 8, 1989, Pages 1110-1123

Distributed Scheduling of Tasks with Deadlines and Resource Requirements

Author keywords

Deadlines; distributed scheduling; real time systems; resource constraints; simulation studies

Indexed keywords

COMPUTER PROGRAMMING--ALGORITHMS; COMPUTER SIMULATION; SCHEDULING;

EID: 0024716426     PISSN: 00189340     EISSN: None     Source Type: Journal    
DOI: 10.1109/12.30866     Document Type: Article
Times cited : (194)

References (25)
  • 2
    • 0022888457 scopus 로고
    • Dynamic scheduling of groups of tasks with precedence constraints in distributed hard real-time systems
    • Dec.
    • S. Cheng, J.A. Stankovic, and K. Ramamritham, “Dynamic scheduling of groups of tasks with precedence constraints in distributed hard real-time systems,” in Proc. Real-Time Syst. Symp., Dec. 1986.
    • (1986) Proc. Real-Time Syst. Symp.
    • Cheng, S.1    Stankovic, J.A.2    Ramamritham, K.3
  • 3
    • 0002792672 scopus 로고
    • Control robotics: The procedural control of physical process
    • M. Dertouzos, “Control robotics: The procedural control of physical process,” in Proc. IFIP Congress, 1974.
    • (1974) Proc. IFIP Congress
    • Dertouzos, M.1
  • 4
    • 0020139832 scopus 로고
    • Heuristic models of task assignment scheduling in distributed systems
    • June
    • K. Efe, “Heuristic models of task assignment scheduling in distributed systems,” IEEE Computer, June 1982.
    • (1982) IEEE Computer
    • Efe, K.1
  • 6
    • 0001627504 scopus 로고
    • Complexity results for multiprocessor scheduling under resource constraints
    • M.R. Garey and D.S. Johnson, “Complexity results for multiprocessor scheduling under resource constraints,” SIAM J. Comput., vol. 4, 1975.
    • (1975) SIAM J. Comput. , vol.4
    • Garey, M.R.1    Johnson, D.S.2
  • 7
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • R.L. Graham et al., “Optimization and approximation in deterministic sequencing and scheduling: A survey,” Ann. Discrete Math., vol. 5. 1979.
    • (1979) Ann. Discrete Math. , vol.5
    • Graham, R.L.1
  • 8
    • 29244434600 scopus 로고
    • Deadline scheduling for a realtime multiprocessor
    • (N76–15843), Springfield, VA, May
    • H.H. Johnson and M.S. Madison, “Deadline scheduling for a realtime multiprocessor,” in Proc. NTIS (N76–15843), Springfield, VA, May 1974.
    • (1974) Proc. NTIS
    • Johnson, H.H.1    Madison, M.S.2
  • 9
    • 0022862497 scopus 로고
    • Guaranteed response times in a distributed hard real-time environment
    • Dec.
    • D.W. Leinbaugh and M. Yamini, “Guaranteed response times in a distributed hard real-time environment,” IEEE Trans. Software Eng., pp. 1139–1144, Dec. 1986.
    • (1986) IEEE Trans. Software Eng. , pp. 1139-1144
    • Leinbaugh, D.W.1    Yamini, M.2
  • 10
    • 0020721849 scopus 로고
    • Theory formation by heuristic search-The nature of heuristics II: Background and examples
    • D.B. Lenat, “Theory formation by heuristic search-The nature of heuristics II: Background and examples,” Artif. Intell., vol. 21, 1983.
    • (1983) Artif. Intell. , vol.21
    • Lenat, D.B.1
  • 11
    • 84974687699 scopus 로고
    • Scheduling algorithms for multiprogramming in a hard real-time environment
    • Jan.
    • C.L. Liu and J. Layland, “Scheduling algorithms for multiprogramming in a hard real-time environment,” J. ACM, vol. 20, Jan. 1973.
    • (1973) J. ACM , vol.20
    • Liu, C.L.1    Layland, J.2
  • 13
    • 0019911835 scopus 로고
    • A task allocation model for distributed computing systems
    • Jan.
    • R.P. Ma, E.Y.S. Lee, and M. Tsuchiya, “A task allocation model for distributed computing systems,” IEEE Trans. Comput., vol. C-31, Jan. 1982.
    • (1982) IEEE Trans. Comput. , vol.C-31
    • Ma, R.P.1    Lee, E.Y.S.2    Tsuchiya, M.3
  • 14
    • 0021121884 scopus 로고
    • A model to solve timing-critical application problems in distributed computer systems
    • Jan.
    • P. Ma, “A model to solve timing-critical application problems in distributed computer systems,” IEEE Computer, Jan. 1984.
    • (1984) IEEE Computer
    • Ma, P.1
  • 16
    • 0014766132 scopus 로고
    • Preemptive scheduling of real-time tasks on multiprocessor systems
    • Apr.
    • R.R. Muntz and E.G. Coffman, “Preemptive scheduling of real-time tasks on multiprocessor systems,” J. ACM, vol. 17, Apr. 1970.
    • (1970) J. ACM , vol.17
    • Muntz, R.R.1    Coffman, E.G.2
  • 17
    • 0021458524 scopus 로고
    • Dynamic task scheduling in distributed hard real-time systems
    • May
    • K. Ramamritham and J.A. Stankovic, “Dynamic task scheduling in distributed hard real-time systems,” IEEE Software, vol. 1, May 1984.
    • (1984) IEEE Software , vol.1
    • Ramamritham, K.1    Stankovic, J.A.2
  • 20
    • 0019180974 scopus 로고
    • The contract net protocol: High level communication and control in a distributed problem solver
    • Dec.
    • R.G. Smith, “The contract net protocol: High level communication and control in a distributed problem solver,” IEEE Trans. Comput., vol. C-29, Dec. 1980.
    • (1980) IEEE Trans. Comput. , vol.C-29
    • Smith, R.G.1
  • 21
    • 0022305511 scopus 로고
    • Evaluation of a flexible task scheduling algorithm for distributed hard real-time systems
    • Dec.
    • J.A. Stankovic, K. Ramamritham, and S. Cheng, “Evaluation of a flexible task scheduling algorithm for distributed hard real-time systems,” IEEE Trans. Comput., Dec. 1985.
    • (1985) IEEE Trans. Comput.
    • Stankovic, J.A.1    Ramamritham, K.2    Cheng, S.3
  • 23
    • 0022028304 scopus 로고
    • Load sharing in distributed systems
    • Mar.
    • Y. Wang and R. Morris, “Load sharing in distributed systems,” IEEE Trans. Comput., vol. C-34, Mar. 1985.
    • (1985) IEEE Trans. Comput. , vol.C-34
    • Wang, Y.1    Morris, R.2
  • 24
  • 25
    • 0023412971 scopus 로고
    • Simple and integrated heuristic algorithms for scheduling tasks with time and resource constraints
    • W. Zhao and K. Ramamritham, “Simple and integrated heuristic algorithms for scheduling tasks with time and resource constraints,” J. Syst. Software, 1987.
    • (1987) J. Syst. Software
    • Zhao, W.1    Ramamritham, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.