메뉴 건너뛰기




Volumn 77, Issue 6, 1989, Pages 891-898

Emerging Issues in Power System Planning

Author keywords

[No Author keywords available]

Indexed keywords

ELECTRIC POWER GENERATION--COSTS; ELECTRIC UTILITIES--PLANNING; SYSTEMS ENGINEERING--COMPUTER SIMULATION;

EID: 0024679992     PISSN: 00189219     EISSN: 15582256     Source Type: Journal    
DOI: 10.1109/5.29329     Document Type: Article
Times cited : (17)

References (7)
  • 2
    • 0024103858 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation, 1982-87
    • Nov.
    • R.N. Allan, R. Billinton, S.M. Shahidehpour, and C. Singh, “Bibliography on the application of probability methods in power system reliability evaluation, 1982-87,” IEEE Trans. Power Syst., vol. 3, no. 4, pp. 1555–1564, Nov. 1988.
    • (1988) IEEE Trans. Power Syst. , vol.3 , Issue.4 , pp. 1555-1564
    • Allan, R.N.1    Billinton, R.2    Shahidehpour, S.M.3    Singh, C.4
  • 4
    • 84939705426 scopus 로고
    • Environmental and Socioeconomic Consequences of a Shortage in Installed Generating Capacity
    • EPRI Rep. EA-2462, June
    • EPRI Rep. EA-2462, “Environmental and Socioeconomic Consequences of a Shortage in Installed Generating Capacity,” June 1982.
    • (1982)
  • 5
    • 84941474992 scopus 로고
    • P-4463-SR, May
    • Electric Power Research Institute, “TAG-technical assessment guide,” vol. 3, P-4463-SR, May 1987.
    • (1987) TAG-technical assessment guide , vol.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.