|
Volumn PI, Issue , 1988, Pages 811-825-18263
|
Simultaneous multiple entry hydraulic fracture treatments of horizontally drilled wells
a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
DATA PROCESSING--DATA ACQUISITION;
OIL FIELDS--COSTS;
OIL WELL CASING;
OIL WELL CEMENTING;
OIL WELL DRILLING--DEFLECTED;
FRACTURE STIMULATION;
HORIZONTALLY DRILLED WELLS;
PERFORATION DESIGN;
SIMULTANEOUS MULTIPLE ENTRY HYDRAULIC FRACTURE;
OIL WELLS;
|
EID: 0024173783
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (4)
|
References (15)
|