메뉴 건너뛰기




Volumn 14, Issue 4, 1988, Pages 387-393

Single facility scheduling with nonlinear processing times

Author keywords

[No Author keywords available]

Indexed keywords

MATHEMATICAL PROGRAMMING, LINEAR; MATHEMATICAL TECHNIQUES--HEURISTIC; SYSTEMS SCIENCE AND CYBERNETICS--HEURISTIC PROGRAMMING;

EID: 0024137249     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/0360-8352(88)90041-1     Document Type: Article
Times cited : (319)

References (5)
  • 2
    • 0040376251 scopus 로고
    • An improved combinatorial algorithm for the flowshop scheduling problem
    • (1971) Operations Research , vol.20 , pp. 1753-1758
    • Gupta1
  • 4
    • 0015403480 scopus 로고
    • Optimal scheduling in a multi-stage flowshop
    • (1972) AIIE Trans. , vol.4 , pp. 238-243
    • Gupta1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.