-
1
-
-
84941462385
-
A research agenda for models to plan and schedule manufacturing systems
-
July
-
C. Abraham, B. Dietrich, S. Graves, and W. Maxwell, “A research agenda for models to plan and schedule manufacturing systems,” IBM Watson Research Center, working paper, July, 1985.
-
(1985)
IBM Watson Research Center
-
-
Abraham, C.1
Dietrich, B.2
Graves, S.3
Maxwell, W.4
-
2
-
-
84941478155
-
Introduction to Sequencing and Scheduling
-
K. Baker, Introduction to Sequencing and Scheduling. New-York: Wiley, 1974.
-
(1974)
New-York: Wiley
-
-
Baker, K.1
-
3
-
-
84941475590
-
Computer and Job Shop Scheduling
-
E. G. Coffman, Jr., Ed. Computer and Job Shop Scheduling. New York: Wiley, 1976.
-
(1976)
New York: Wiley
-
-
Coffman, E.G.1
-
6
-
-
84941487936
-
Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop
-
S. French, Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop. New York: Wiley, 1982.
-
(1982)
New York: Wiley
-
-
French, S.1
-
7
-
-
0019585243
-
A review of production scheduling
-
Aug.
-
S. C. Graves, "A review of production scheduling,” Oper. Res., vol. 29, no. 4, pp. 646-675, Aug. 1981.
-
(1981)
Oper. Res.
, vol.29
, Issue.4
, pp. 646-675
-
-
Graves, S.C.1
-
8
-
-
84941441189
-
written communication to E. Balas
-
May 1
-
J. K. Lenstra, written communication to E. Balas, May 1, 1986.
-
(1986)
-
-
Lenstra, J.K.1
-
11
-
-
0003592198
-
Machine Scheduling Problems: Classification
-
The Netherlands. Martinus Nijhoff
-
A. H. G. Rinnooy Kan, Machine Scheduling Problems: Classification, Complexity and Computations. The Hague, The Netherlands. Martinus Nijhoff, vol. 39, 1976.
-
(1976)
Complexity and Computations. The Hague
, vol.39
-
-
Rinnooy Kan, A.H.G.1
-
14
-
-
84912902884
-
Generalizations of the machine scheduling problem.
-
Ph.D. dissertation Charlottesville, VA
-
R. V. Rogers, “Generalizations of the machine scheduling problem.” Ph.D. dissertation, Univ. Virginia, Dept. Syst. Engineering, Charlottesville, VA, 1987.
-
(1987)
Univ. Virginia, Dept. Syst. Engineering
-
-
Rogers, R.V.1
-
15
-
-
0021502578
-
MRP-II providing a natural hub for computer-integrated manufacturing system
-
Oct.
-
K. A. Fox, “MRP-II providing a natural hub for computer-integrated manufacturing system,” Ind. Eng., pp. 44-50, Oct. 1984.
-
(1984)
Ind. Eng.
, pp. 44-50
-
-
Fox, K.A.1
-
16
-
-
0012341892
-
OPT uncovered: Many production planning and scheduling concepts can be applied with or without the software
-
Oct.
-
F. R. Jacobs, “OPT uncovered: Many production planning and scheduling concepts can be applied with or without the software,” Ind. Eng., pp. 32-41, Oct. 1984.
-
(1984)
Ind. Eng.
, pp. 32-41
-
-
Jacobs, F.R.1
-
17
-
-
0020822392
-
The OPT scheduling system: A review of a new production scheduling system
-
“The OPT scheduling system: A review of a new production scheduling system,” Product. Inventory Manage., vol. 24, pp. 47-51, 1983.
-
(1983)
Product. Inventory Manage.
, vol.24
, pp. 47-51
-
-
-
19
-
-
3543143422
-
Just-In-Time production systems: Replacing complexity with simplicity in manufacturing management
-
Oct.
-
R. J. Schonberger, “Just-In-Time production systems: Replacing complexity with simplicity in manufacturing management,” Ind. Eng., pp. 52-63, Oct. 1984.
-
(1984)
Ind. Eng.
, pp. 52-63
-
-
Schonberger, R.J.1
-
20
-
-
0038709760
-
The schedule-sequencing problem
-
E. H. Bowman, “The schedule-sequencing problem,” Oper. Res., vol. 7, pp. 621-624, 1959.
-
(1959)
Oper. Res.
, vol.7
, pp. 621-624
-
-
Bowman, E.H.1
-
21
-
-
0000965956
-
Heuristics in job shop scheduling
-
Nov.
-
W. S. Gere, “Heuristics in job shop scheduling,” Management Sci., vol. 13, no. 3, pp. 167-190, Nov. 1966.
-
(1966)
Management Sci.
, vol.13
, Issue.3
, pp. 167-190
-
-
Gere, W.S.1
-
22
-
-
0000131281
-
Algorithms for solving production-scheduling problems
-
B. Giffler and G. L. Thompson, “Algorithms for solving production-scheduling problems,” Oper. Res., vol. 8, pp. 487-503, 1960.
-
(1960)
Oper. Res.
, vol.8
, pp. 487-503
-
-
Giffler, B.1
Thompson, G.L.2
-
23
-
-
0019010962
-
Heuristics for flow-shop scheduling
-
J. R. King and A. S. Spachis, “Heuristics for flow-shop scheduling,” Int. J. Product. Res., vol. 18, no. 3, pp. 345-357, 1980.
-
(1980)
Int. J. Product. Res.
, vol.18
, Issue.3
, pp. 345-357
-
-
King, J.R.1
Spachis, A.S.2
-
24
-
-
0000237789
-
On the job-shop scheduling problem
-
A. S. Manne, “On the job-shop scheduling problem,” Oper. Res., vol. 8, pp. 219-223, 1960.
-
(1960)
Oper. Res.
, vol.8
, pp. 219-223
-
-
Manne, A.S.1
-
25
-
-
0011782937
-
A review of job shop scheduling
-
June
-
P. Mellor, “A review of job shop scheduling,” Oper. Res. Quart., vol. 17, no. 2, pp. 161-171, June 1966.
-
(1966)
Oper. Res. Quart.
, vol.17
, Issue.2
, pp. 161-171
-
-
Mellor, P.1
-
26
-
-
0003054955
-
A survey of scheduling rules
-
Jan.
-
S. S. Panwalkar and W. Iskander, “A survey of scheduling rules,” Oper. Res., vol. 25, no. 1, pp. 45-61, Jan.-Feb. 1977.
-
(1977)
Oper. Res.
, vol.25
, Issue.1
, pp. 45-61
-
-
Panwalkar, S.S.1
Iskander, W.2
-
27
-
-
0018544931
-
Job-shop scheduling heuristics with local neighborhood search
-
A. S. Spachis and J. R. King, “Job-shop scheduling heuristics with local neighborhood search,” Int. J. Product. Res., vol. 17, no. 6, pp. 507-526, 1979.
-
(1979)
Int. J. Product. Res.
, vol.17
, Issue.6
, pp. 507-526
-
-
Spachis, A.S.1
King, J.R.2
-
29
-
-
0015725454
-
Project scheduling under resource constraints—historical review and categorization of procedures
-
Dec.
-
E. W. Davis, “Project scheduling under resource constraints—historical review and categorization of procedures,” AIIE Trans., vol. 5, no. 4, Dec. 1973.
-
(1973)
AIIE Trans.
, vol.5
, Issue.4
-
-
Davis, E.W.1
-
30
-
-
84941428559
-
Activity Networks: Project Planning and Control by Network Models
-
S. E. Elmaghraby, Activity Networks: Project Planning and Control by Network Models. New York: Wiley, 1977.
-
(1977)
New York: Wiley
-
-
Elmaghraby, S.E.1
-
32
-
-
0021484063
-
Performance of Hierarchical production scheduling policy
-
Sept.
-
R. Akella, Y. Choong, and S. B. Gershwin, “Performance of Hierarchical production scheduling policy,” IEEE Trans. Components Hybrids Manuf. Technol, vol. CHMT-7, no. 3, pp. 225-238, Sept. 1984.
-
(1984)
IEEE Trans. Components Hybrids Manuf. Technol
, vol.CHMT-7
, Issue.3
, pp. 225-238
-
-
Akella, R.1
Choong, Y.2
Gershwin, S.B.3
-
33
-
-
0022706976
-
A control perspective on recent trends in manufacturing systems
-
Apr.
-
S. B. Gershwin, R. R. Hildebrant, R. Suri, and S. K. Mitter, “A control perspective on recent trends in manufacturing systems,” IEEE Contr. Syst., pp. 3-15, Apr. 1986.
-
(1986)
IEEE Contr. Syst.
, pp. 3-15
-
-
Gershwin, S.B.1
Hildebrant, R.R.2
Suri, R.3
Mitter, S.K.4
-
34
-
-
0022678179
-
Simulated versus real life data in testing the efficiency of scheduling algorithms
-
Mar.
-
A. D. Amar and J. N. D. Gupta, “Simulated versus real life data in testing the efficiency of scheduling algorithms,” IIE Trans., pp. 16-25, Mar. 1986.
-
(1986)
IIE Trans.
, pp. 16-25
-
-
Amar, A.D.1
Gupta, J.N.D.2
-
35
-
-
0000450049
-
Simulation of a simplified job shop.
-
Apr.
-
C. T. Baker and Dzielinski, “Simulation of a simplified job shop.” Management Sci., vol. 6, no. 3, pp. 311-323, Apr. 1960.
-
(1960)
Management Sci.
, vol.6
, Issue.3
, pp. 311-323
-
-
Baker, C.T.1
Dzielinski2
-
36
-
-
3343016943
-
Load forecasting, priority sequencing, and simulation in a job shop control system
-
Oct.
-
M. H. Bulkin, J. L. Colley, and H. W. Steinhoff, Jr., “Load forecasting, priority sequencing, and simulation in a job shop control system,” Management Sci., vol. 13, no. 2, Oct. 1966.
-
(1966)
Management Sci.
, vol.13
, Issue.2
-
-
Bulkin, M.H.1
Colley, J.L.2
Steinhoff, H.W.3
-
37
-
-
84941484003
-
A short tutorial on perturbation analysis of discrete event dynamic systems
-
Aug.
-
Y. C. Ho, “A short tutorial on perturbation analysis of discrete event dynamic systems,” Proc. First ORSA/TIMS Special Interest Conf. Flexible Manuf. Syst., Ann Arbor, MI, Aug. 1984, pp. 372-378.
-
(1984)
Proc. First ORSA/TIMS Special Interest Conf. Flexible Manuf. Syst.
, pp. 372-378
-
-
Ho, Y.C.1
-
38
-
-
0018030586
-
An investigation of visual interactive simulation methods using the job-shop scheduling problem
-
R. D. Hurrion, “An investigation of visual interactive simulation methods using the job-shop scheduling problem,” J. Oper. Res. Soc., vol. 29, no. 11, pp. 1085-1093, 1978.
-
(1978)
J. Oper. Res. Soc.
, vol.29
, Issue.11
, pp. 1085-1093
-
-
Hurrion, R.D.1
-
39
-
-
84860789438
-
Simulation series; Part I: Introducing simulation: A tool for analyzing complex systems
-
May
-
A. M. Law, “Simulation series; Part I: Introducing simulation: A tool for analyzing complex systems,” Ind. Eng., pp. 46-63, May 1986.
-
(1986)
Ind. Eng.
, pp. 46-63
-
-
Law, A.M.1
-
40
-
-
0021640491
-
Artificial Intelligence and simulation
-
R. E. Shannon, “Artificial Intelligence and simulation,” in 1984 Winter Simulation Conf. Proc., S. Sheppard, U. Pooch, and D. Pegden, Eds., 1984.
-
(1984)
1984 Winter Simulation Conf. Proc.
-
-
Shannon, R.E.1
-
41
-
-
84952242943
-
Loading and control policies for a flexible manufacturing system
-
K. E. Stecke and J. J. Solberg, “Loading and control policies for a flexible manufacturing system,” Int. J. Product. Res., vol. 19, no. 5, pp. 481-490, 1981.
-
(1981)
Int. J. Product. Res.
, vol.19
, Issue.5
, pp. 481-490
-
-
Stecke, K.E.1
Solberg, J.J.2
-
43
-
-
84941435137
-
Simulation of Hybrid Automation
-
W. J. Trybula and R. G. Ingalls, “Simulation of Hybrid Automation,” General Electric Company, Electronics Automation Application Center, Charlottesville, VA, 1985.
-
(1985)
General Electric Company
-
-
Trybula, W.J.1
Ingalls, R.G.2
-
44
-
-
0022234268
-
Simultaneous lot sizing and sequencing for multistage production systems
-
Dec.
-
P. Afentakis, “Simultaneous lot sizing and sequencing for multistage production systems,” IIE Trans., pp. 327-331, Dec. 1985.
-
(1985)
IIE Trans.
, pp. 327-331
-
-
Afentakis, P.1
-
46
-
-
0001930641
-
Jobshop-like queueing systems
-
Oct.
-
J. R. Jackson, “Jobshop-like queueing systems,” Management Sci., vol. 10, no. 1, pp. 131-142, Oct. 1963.
-
(1963)
Management Sci.
, vol.10
, Issue.1
, pp. 131-142
-
-
Jackson, J.R.1
-
47
-
-
0022034627
-
Lot-sizing and lead-time performance in a manufacturing cell
-
U. S. Karmarkar, S. Kekre, and S. Freeman, “Lot-sizing and lead-time performance in a manufacturing cell,” Interfaces, vol. 15, no. 2, pp. 1-9, 1985.
-
(1985)
Interfaces
, vol.15
, Issue.2
, pp. 1-9
-
-
Karmarkar, U.S.1
Kekre, S.2
Freeman, S.3
-
49
-
-
0022059935
-
The stochastic discrete dynamic lot size problem: An open-loop solution
-
J. B. Lasserre, C. Bes and F. Roubellat, “The stochastic discrete dynamic lot size problem: An open-loop solution,” Oper. Res., vol. 33, no. 3, pp. 684-689, 1985.
-
(1985)
Oper. Res.
, vol.33
, Issue.3
, pp. 684-689
-
-
Lasserre, J.B.1
Bes, C.2
Roubellat, F.3
-
51
-
-
0011715958
-
Operations Management: Production of Goods and Services
-
NJ: Prentice-Hall
-
J. O. McClain and L. J. Thomas, Operations Management: Production of Goods and Services. Englewood Cliffs, NJ: Prentice-Hall, 1985.
-
(1985)
Englewood Cliffs
-
-
McClain, J.O.1
Thomas, L.J.2
-
52
-
-
84941485730
-
An experimental analysis of capacity sensitive lotsizing methodologies
-
Apr.
-
A. S. Raturi and A. V. Hill, “An experimental analysis of capacity sensitive lotsizing methodologies,” working paper. Univ. Minnesota, Minneapolis, Apr. 1986.
-
(1986)
working paper. Univ. Minnesota
-
-
Raturi, A.S.1
Hill, A.V.2
-
53
-
-
0003644137
-
Applied Probability Models with Optimization Applications
-
CA: Holden-Day
-
S. M. Ross, Applied Probability Models with Optimization Applications. San Francisco, CA: Holden-Day, 1970.
-
(1970)
San Francisco
-
-
Ross, S.M.1
-
54
-
-
84941465528
-
Introduction to Stochastic Dynamic Programming. New’
-
S. M. Ross, Introduction to Stochastic Dynamic Programming. New’ York: Academic, 1983.
-
(1983)
York: Academic
-
-
Ross, S.M.1
-
55
-
-
0022681090
-
A heuristic for multiple lot sizing for an order under variable yield
-
Mar.
-
M. Sepehri, E. A. Silver, and C. New, “A heuristic for multiple lot sizing for an order under variable yield,” IIE Trans., pp. 63—69, Mar. 1986.
-
(1986)
IIE Trans.
-
-
Sepehri, M.1
Silver, E.A.2
New, C.3
-
56
-
-
0022097833
-
The optimality of unbalanced workloads and machine group sizes in closed queueing networks of multiserver queues
-
K. E. Stecke and J. J. Solberg, “The optimality of unbalanced workloads and machine group sizes in closed queueing networks of multiserver queues,” Oper. Res., vol. 33, no. 4, pp. 882-910, 1985.
-
(1985)
Oper. Res.
, vol.33
, Issue.4
, pp. 882-910
-
-
Stecke, K.E.1
Solberg, J.J.2
-
57
-
-
0019247722
-
Optimal multi-level lot sizing for requirements Planning systems
-
Dec.
-
E. Steinberg and H. A. Napier, “Optimal multi-level lot sizing for requirements Planning systems,” Management Sci., vol. 26, no. 12, pp. 1258-1263, Dec. 1980.
-
(1980)
Management Sci.
, vol.26
, Issue.12
, pp. 1258-1263
-
-
Steinberg, E.1
Napier, H.A.2
-
58
-
-
0040297319
-
Constrained Inventory rules for production smoothing
-
P. R. Winters, “Constrained Inventory rules for production smoothing,” Management Sci., vol. 8, pp. 470-481, 1962.
-
(1962)
Management Sci.
, vol.8
, pp. 470-481
-
-
Winters, P.R.1
-
59
-
-
0022754510
-
A rule-based system to schedule production
-
July
-
G. Bruno, A. Elia, and P. Laface, “A rule-based system to schedule production,” IEEE Trans. Comput., vol. C-19, no. 7, pp. 32-40, July 1986.
-
(1986)
IEEE Trans. Comput.
, vol.C-19
, Issue.7
, pp. 32-40
-
-
Bruno, G.1
Elia, A.2
Laface, P.3
-
62
-
-
33749682813
-
ISIS: A Constraint-Directed Reasoning Approach to Job Shop Scheduling: System Summary. Pittsburgh
-
The Robotics Institute, CMU-RI-TR-83-8. June
-
M. S. Fox, B. P. Allen, S. F. Smith, and G, A. Strohm. ISIS: A Constraint-Directed Reasoning Approach to Job Shop Scheduling: System Summary. Pittsburgh, PA: Carnegie-Mellon University, The Robotics Institute, CMU-RI-TR-83-8. June 1983.
-
(1983)
PA: Carnegie-Mellon University
-
-
Fox, M.S.1
Allen, B.P.2
Smith, S.F.3
Strohm, G.A.4
-
63
-
-
0022520292
-
Lessons for O.R. from A.I.: A scheduling case study
-
T. J. Grant, “Lessons for O.R. from A.I.: A scheduling case study,” J. Oper. Res. Soc., vol. 37, no. 1, pp. 41-57, 1986.
-
(1986)
J. Oper. Res. Soc.
, vol.37
, Issue.1
, pp. 41-57
-
-
Grant, T.J.1
-
64
-
-
0022024856
-
Artificial intelligence moves into industrial and process control
-
Mar.
-
R. A. Herrod and B. Papas, “Artificial intelligence moves into industrial and process control,” Ind. Process Contr. Mag., pp. 45-60, Mar. 1985.
-
(1985)
Ind. Process Contr. Mag.
, pp. 45-60
-
-
Herrod, R.A.1
Papas, B.2
-
65
-
-
0023455667
-
An architecture for decision making in the factory of the future
-
Dec.
-
R. H. F. Jackson and A. T. Jones, “An architecture for decision making in the factory of the future,” Interfaces, vol. 17, no. 6, pp. 15-28, Nov.-Dec. 1987.
-
(1987)
Interfaces
, vol.17
, Issue.6
, pp. 15-28
-
-
Jackson, R.H.F.1
Jones, A.T.2
-
66
-
-
0023328851
-
Expert systems in production scheduling
-
J. J. Kanet and H. H. Adelsberger, “Expert systems in production scheduling,” Europ. J. Oper. Res., vol. 29, pp. 51-57, 1987.
-
(1987)
Europ. J. Oper. Res.
, vol.29
, pp. 51-57
-
-
Kanet, J.J.1
Adelsberger, H.H.2
-
67
-
-
0005089284
-
Designing expert systems for scheduling of automated manufacturing
-
July
-
A. Kusiak, “Designing expert systems for scheduling of automated manufacturing,” Ind. Eng., pp. 42-46, July 1987.
-
(1987)
Ind. Eng.
, pp. 42-46
-
-
Kusiak, A.1
-
68
-
-
84941452397
-
An investigation of beam search for scheduling
-
Apr.
-
P. S. Ow and T. E. Morton, “An investigation of beam search for scheduling,” working paper, Carnegie-Mellon University. Pittsburgh, PA, Apr. 1985.
-
(1985)
working paper
-
-
Ow, P.S.1
Morton, T.E.2
-
69
-
-
84941428418
-
The GENSCHED project: General scheduling knowledge base system
-
Feb.
-
A. C. Semeco, S. P. Roth, B. D. Williams, and J. Gilmore, “The GENSCHED project: General scheduling knowledge base system,” Final Rep., Georgia Institute of Technology, Atlanta, Feb. 1986.
-
(1986)
Final Rep.
-
-
Semeco, A.C.1
Roth, S.P.2
Williams, B.D.3
Gilmore, J.4
-
70
-
-
33745800693
-
Knowledge-based scheduling in flexible manufacturing systems
-
M. J. Shaw-, “Knowledge-based scheduling in flexible manufacturing systems,” Texas Instruments Tech. J., pp. 54-61. Winter 1987.
-
(1987)
Texas Instruments Tech. J.
, pp. 54-61
-
-
Shaw-, M.J.1
-
71
-
-
0009743850
-
Constructing and maintaining production plans: Investigations into the development of knowledge-based factory scheduling systems
-
S. F. Smith, M. S. Fox, and P. S. Ow, “Constructing and maintaining production plans: Investigations into the development of knowledge-based factory scheduling systems,” AI Mag., vol. 7. no. 4, pp. 45-61, Fall 1986.
-
(1986)
AI Mag.
, vol.7
, Issue.4
, pp. 45-61
-
-
Smith, S.F.1
Fox, M.S.2
Ow, P.S.3
-
72
-
-
0001846478
-
An expert system for scheduling robots in a flexible electroplating, system with dynamically changing workloads
-
March
-
A. Thesen and L. Lei, “An expert system for scheduling robots in a flexible electroplating, system with dynamically changing workloads,” Tech. Rep., Umv. of Wisconsin. Madison. March 20. 1986.
-
(1986)
Tech. Rep.
-
-
Thesen, A.1
Lei, L.2
-
74
-
-
0020750687
-
Planning in time: Windows and durations for activities and goals
-
May
-
S. A. Vere. “Planning in time: Windows and durations for activities and goals,” IEEE Trans. Pattern Anal. Machine Intell., vol. PAMI-5. no. 3. pp. 246-267, May 1983.
-
(1983)
IEEE Trans. Pattern Anal. Machine Intell
, vol.PAMI-5
, Issue.3
, pp. 246-267
-
-
Vere, S.A.1
|