메뉴 건너뛰기




Volumn 7, Issue 5, 1988, Pages 213-217

A scheduling rule for job release in semiconductor fabrication

Author keywords

production scheduling; simulation; stochastic models

Indexed keywords

JOB ANALYSIS; PRODUCTION CONTROL - COMPUTER SIMULATION; SEMICONDUCTOR DEVICE MANUFACTURE - PRODUCTION CONTROL;

EID: 0024102409     PISSN: 01676377     EISSN: None     Source Type: Journal    
DOI: 10.1016/0167-6377(88)90033-8     Document Type: Article
Times cited : (88)

References (13)
  • 1
    • 84909723683 scopus 로고    scopus 로고
    • M. Barry, Private Communication, 1986.
  • 11
    • 84909723680 scopus 로고
    • Computer simulation of semiconductor wafer fabrication
    • Operations Research Center, University of California, Berkeley, CA 94720
    • (1985) Technical Report ORC 86-14
    • Resende1
  • 12
    • 0242297099 scopus 로고
    • Shop floor scheduling of semiconductor wafer manufacturing
    • 2nd edition, Ph.D. Dissertation, Engineering Systems Research Center, University of California, Berkeley, CA 94720
    • (1987) Technical Report ESRC 87-1
    • Resende1
  • 13
    • 84909723678 scopus 로고    scopus 로고
    • L.M. Wein, Private communication, 1986.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.