-
1
-
-
0019029798
-
Online computational scheme for mechanical manipulator
-
June
-
J. Y. S. Luh, M. W. Walker, and R. P. Paul, “Online computational scheme for mechanical manipulator,” Trans. ASME, J. D-vnam. Sysr. Mens. Conrr., vol. 120, pp. 69-76, June 198
-
(1980)
Trans. ASME, J. D-vnam. Sysr. Mens. Conrr.
, vol.120
, pp. 69-76
-
-
Luh, J.Y.S.1
Walker, M.W.2
Paul, R.P.3
-
2
-
-
0018758391
-
Kinematics and kinetic analysis of open-chain linkages utilizing Newton-Euler methods
-
June
-
D. E. Orin, R. B. MaChee, M. Vukobratovic, and G. Hartoch, “Kinematics and kinetic analysis of open-chain linkages utilizing Newton-Euler methods,” Math. Biosci., vol. 43, pp. 107–130, 1979.
-
(1980)
Math. Biosci.
, vol.43
, pp. 107-130
-
-
Orin, D.E.1
MaChee, R.B.2
Vukobratovic, M.3
Hartoch, G.4
-
3
-
-
0019901475
-
Hierarchical control structure using special purpose processor for the control of robot arm
-
June
-
C. S. G. Lee, T. N. Mudge, and J. L. Turney, “Hierarchical control structure using special purpose processor for the control of robot arm,” in Proc. 1982 Conf. Pattern Recog. Image Proc., June 1982, pp. 634–640.
-
(1982)
Proc. 1982 Conf. Pattern Recog. Image Proc.
, pp. 634-640
-
-
Lee, C.S.G.1
Mudge, T.N.2
Turney, J.L.3
-
4
-
-
0022228162
-
A multiprocessor-based controller for control of mechanical manipulators
-
Dec.
-
R. Nigam and C. S. G. Lee, “A multiprocessor-based controller for control of mechanical manipulators,” IEEE J. Robotics Automat., vol. RA-1, no. 4, pp. 173–182, Dec. 1985.
-
(1985)
IEEE J. Robotics Automat.
, vol.RA-1
, Issue.4
, pp. 173-182
-
-
Nigam, R.1
Lee, C.S.G.2
-
5
-
-
0021642036
-
Real-time control of the CMU direct arm II using customized inverse dynamics
-
Dec.
-
T. Kanade, P. K. Khosla, and N. Tanaka, “Real-time control of the CMU direct arm II using customized inverse dynamics, in Proc. IEEE Conf. Decision and Control, Dec. 1984, pp. 1345–1352.
-
(1984)
Proc. IEEE Conf. Decision and Control
, pp. 1345
-
-
Kanade, T.1
Khosla, P.K.2
Tanaka, N.3
-
6
-
-
0022075535
-
Parallelism in manipulator dynamics
-
L. H. Lathrop, “Parallelism in manipulator dynamics,” Int. J. Robotics Res., vol. 4, no. 2, pp. 80–102, Summer 1985.
-
(1985)
Int. J. Robotics Res.
, vol.4
, pp. 80-102
-
-
Lathrop, L.H.1
-
7
-
-
0022754760
-
Efficient parallel algorithm for robot inverse dynamics computation
-
July
-
C. S. G. Lee and P. R. Chang, “Efficient parallel algorithm for robot inverse dynamics computation,” IEEE Trans. Syst. Man Cybern., vol. SMC-16, no. 4, pp. 532–542, July 1986.
-
(1986)
IEEE Trans. Syst. Man Cybern.
, vol.SMC-16
, Issue.4
, pp. 532-542
-
-
Lee, C.S.G.1
Chang, P.R.2
-
8
-
-
0020101696
-
Scheduling of parallel computer for a computer-controlled mechanical manipulator
-
J. Y. S. Luh and C. S. Lin, “Scheduling of parallel computer for a computer-controlled mechanical manipulator,” IEEE Trans. Syst. Man Cybern., vol. SMC-12, pp. 214–234, 1982.
-
(1982)
IEEE Trans. Syst. Man Cybern.
, vol.SMC-12
, pp. 214-234
-
-
Luh, J.Y.S.1
Lin, C.S.2
-
9
-
-
0022074147
-
Parallel processing of robot-arm control computation on a multiprocessor system
-
June
-
H. Kasahara and S. Narita, “Parallel processing of robot-arm control computation on a multiprocessor system,” IEEE J. Robotics Automat., vol. RA-1, no. 2, pp. 104–113, June 1985.
-
(1985)
IEEE J. Robotics Automat.
, vol.RA-1
, Issue.2
, pp. 104-113
-
-
Kasahara, H.1
Narita, S.2
-
10
-
-
0021939230
-
Robot inverse dynamics on a concurrent computation ensemble
-
J. Barhen, “Robot inverse dynamics on a concurrent computation ensemble,” in Proc. 1985 ASME Int. Conf. Computers in Engineering, 1985, vol. 3, pp. 415–429.
-
(1985)
Proc. 1985 ASME Int. Conf. Computers in Engineering
, vol.3
, pp. 415-429
-
-
Barhen, J.1
-
12
-
-
0017924416
-
Complexity of scheduling under precedence constraints
-
Jan.
-
J. K. Lenstra and A. H. G. R. Kan, “Complexity of scheduling under precedence constraints,” Oper. Res., vol. 26, pp. 25–35, Jan. 1978.
-
(1978)
Oper. Res.
, vol.26
, pp. 25-35
-
-
Lenstra, J.K.1
Kan, A.H.G.R.2
-
13
-
-
0017535343
-
Deterministic processor scheduling
-
Sept.
-
M. J. Gonzalez, Jr., “Deterministic processor scheduling,” Computing Surveys, vol. 9, no. 3, pp. 173–204, Sept. 1977.
-
(1977)
Computing Surveys
, vol.9
, Issue.3
, pp. 173-204
-
-
Gonzalez, M.J.1
-
14
-
-
0017925568
-
Performance guarantees for scheduling algorithm
-
Jan.
-
M. R. Garey, R. L. Graham, and D. J. Johnson, “Performance guarantees for scheduling algorithm,” Oper. Res., vol. 26, pp. 3–21, Jan. 1978.
-
(1978)
Oper. Res.
, vol.26
, pp. 3-21
-
-
Garey, M.R.1
Graham, R.L.2
Johnson, D.J.3
-
15
-
-
0015300088
-
Optimal scheduling strategies in a multiprocessor system
-
Feb.
-
C. V. Ramamoorthy, K. M. Chandy, and M. J. Gonzalez, “Optimal scheduling strategies in a multiprocessor system,” IEEE Trans. Comput., vol. C-21, pp. 137–146, Feb. 1972.
-
(1972)
IEEE Trans. Comput.
, vol.C-21
, pp. 137-146
-
-
Ramamoorthy, C.V.1
Chandy, K.M.2
Gonzalez, M.J.3
-
16
-
-
0016313256
-
A comparison of list schedules for parallel processing systems
-
Dec.
-
T. L. Adam, K. M. Chandy, and J. R. Dickson, “A comparison of list schedules for parallel processing systems,” Commun. ACM, vol. 17, pp. 685–690, Dec. 1974.
-
(1974)
Commun. ACM
, vol.17
, pp. 685-690
-
-
Adam, T.L.1
Chandy, K.M.2
Dickson, J.R.3
-
17
-
-
0021529549
-
Practical multiprocessor scheduling algorithms for efficient parallel processing
-
Nov.
-
H. Kasahara and S. Narita, “Practical multiprocessor scheduling algorithms for efficient parallel processing,” IEEE Trans. Comput., vol. C-33, pp. 1023–1029, Nov. 1984.
-
(1984)
IEEE Trans. Comput.
, vol.C-33
, pp. 1023-1029
-
-
Kasahara, H.1
Narita, S.2
-
19
-
-
84941514761
-
Efficient scheduling algorithms of robot inverse dynamics computation on a multiprocessor system
-
July
-
C. L. Chen, C. S. G. Lee, and E. S. H. Hou, “Efficient scheduling algorithms of robot inverse dynamics computation on a multiprocessor system,” School of Electrical Engineering, Purdue University, West Lafayette, IN, Tech. Rep. TR-EE-87-27, July 1987.
-
(1987)
School of Electrical Engineering, Purdue University, West Lafayette, IN, Tech Rep. TR-EE-87-27
-
-
Chen, C.L.1
Lee, C.S.G.2
Hou, E.S.H.3
-
21
-
-
0015651304
-
Bound on the number of processors and time for multiprocessor optimal schedules
-
Aug.
-
E. B. Fernandez and B. Bussell, “Bound on the number of processors and time for multiprocessor optimal schedules,” IEEE Trans. Comput., vol. C-22, pp. 745–751, Aug. 1973.
-
(1973)
IEEE Trans. Comput.
, vol.C-22
, pp. 745-751
-
-
Fernandez, E.B.1
Bussell, B.2
|