메뉴 건너뛰기




Volumn 26, Issue 3, 1988, Pages 443-455

Computerized shop floor scheduling

Author keywords

[No Author keywords available]

Indexed keywords

DATA PROCESSING - MANUFACTURING APPLICATIONS; PRODUCTION CONTROL - MANAGEMENT;

EID: 0023984547     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207548808947875     Document Type: Article
Times cited : (206)

References (10)
  • 3
    • 84952228237 scopus 로고
    • APICS 24th Annual International Conference Proceedings
    • GOLDRATT, E., 1981, The unbalanced plant. APICS 24th Annual International Conference Proceedings.
    • (1981) The Unbalanced Plant
    • Goldratt, E.1
  • 7
    • 84952173685 scopus 로고
    • APICS 28th Annual International Conference Proceedings
    • GOLDRATT, E., 1985, The OPT substitute for cost. APICS 28th Annual International Conference Proceedings.
    • (1985) The OPT Substitute for Cost
    • Goldratt, E.1
  • 9
    • 84952174429 scopus 로고
    • Executive Video Course: Module 2, Programs 5-7. GOLDRATT, E., and Fox, R., The Race (North River Press Inc.)
    • GOLDRATT, E., and Fox, R., 1983, The Just-In-Time system and the OPT rules. Executive Video Course: Module 2, Programs 5-7. GOLDRATT, E., and Fox, R., The Race (North River Press Inc.)
    • (1983) The Just-In-Time System and the OPT Rules
    • Goldratt, E.1    Fox, R.2
  • 10
    • 84952221851 scopus 로고
    • APICS 26th Annual International Conference Proceedings
    • MATURO, M., 1983, The language of OPT. APICS 26th Annual International Conference Proceedings.
    • (1983) The Language of OPT
    • Maturo, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.