메뉴 건너뛰기




Volumn 1, Issue 4, 1986, Pages 145-151

Fuel resource scheduling - The long-term problem

Author keywords

[No Author keywords available]

Indexed keywords

COST ACCOUNTING; ELECTRIC POWER GENERATION - SCHEDULING; FUELS - OPTIMIZATION; MATHEMATICAL TECHNIQUES - ITERATIVE METHODS;

EID: 0022808412     PISSN: 08858950     EISSN: 15580679     Source Type: Journal    
DOI: 10.1109/TPWRS.1986.4335030     Document Type: Article
Times cited : (19)

References (16)
  • 1
    • 0021455392 scopus 로고
    • Fuel Resource Scheduling, Part I - Overview of an Energy Management Problem
    • July
    • S. Vemuri, et al., “Fuel Resource Scheduling, Part I - Overview of an Energy Management Problem”, IEEE Trans PAS, Vol. 103, No. 7, July 1984, pp. 1542–1548.
    • (1984) IEEE Trans PAS , vol.103 , Issue.7 , pp. 1542
    • Vemuri, S.1
  • 3
    • 0021455307 scopus 로고
    • Fuel Resource Scheduling, Part III - The Short-Term Problem
    • A.B.R. Kumar, et al, “Fuel Resource Scheduling, Part III - The Short-Term Problem”, ibid, pp. 1556–1561.
    • (1561) ibid , pp. 1556
    • Kumar, A.B.R.1
  • 5
    • 84939720133 scopus 로고
    • A Computer Model for the Simulation of Power System Operations
    • Proceedings of the Third Power Systems Computations Conference, June
    • R. R. Booth, “A Computer Model for the Simulation of Power System Operations”, Proceedings of the Third Power Systems Computations Conference, Report O.S. 1, June 1969.
    • (1969) Report O.S. 1
    • Booth, R.R.1
  • 6
    • 0001168877 scopus 로고
    • Establishment of a Mathematical Model Simulating Operation of Thermal Electricity - Generating Units Combined with Pumped Storage Plants
    • H. Baleriaux, E. Jamoulle, and Fr. Linard de Guertechin, “Establishment of a Mathematical Model Simulating Operation of Thermal Electricity - Generating Units Combined with Pumped Storage Plants”, revue E (edition S.R.B.E.), S.A. EBES, Brussels, Belgium, Vol. 5, No. 7, 1967.
    • (1967) revue E (edition S.R.B.E.), S.A. EBES, Brussels, Belgium , vol.5 , Issue.7
    • Baleriaux, H.1    Jamoulle, E.2    de Guertechin, F. L.3
  • 7
    • 0015281960 scopus 로고
    • Power System Simulation Model Based on Probability Analysis
    • January-February
    • R. R. Booth, “Power System Simulation Model Based on Probability Analysis”, IEEE Trans PAS, Vol. 91, No. 1, January-February, 1972, pp. 62–69.
    • (1972) IEEE Trans PAS , vol.91 , Issue.1 , pp. 62-69
    • Booth, R.R.1
  • 8
    • 0015401382 scopus 로고
    • A New Generation Production Cost Program to recognize Forced Outages
    • September-October
    • M. A. Sager, R. J. Ringlee and A. J. Wood, “A New Generation Production Cost Program to recognize Forced Outages”, IEEE Trans PAS, Vol. 91, No. 5, September-October, 1972, pp. 2114–2124.
    • (1972) IEEE Trans PAS , vol.91 , Issue.5 , pp. 2114
    • Sager, M.A.1    Ringlee, R.J.2    Wood, A.J.3
  • 9
    • 0019062868 scopus 로고
    • Expected Energy Production Costs by the Method of Moments
    • September/October
    • N. S. Rau, P. Toy, K. F. Schenk, “Expected Energy Production Costs by the Method of Moments”, IEEE Trans PAS, Vol. 99, September/October, 1980, pp. 1908–1915.
    • (1980) IEEE Trans PAS , vol.99 , pp. 1908
    • Rau, N.S.1    Toy, P.2    Schenk, K.F.3
  • 10
    • 0019066119 scopus 로고
    • Production Costing Using the Cumulant Method of Representing the Equivalent Load Curve
    • September/October
    • J. P. Stremel, et al., “Production Costing Using the Cumulant Method of Representing the Equivalent Load Curve”, IEEE Trans PAS, Vol. 99, September/October, 1980, pp. 1947–1956.
    • (1980) IEEE Trans PAS , vol.99 , pp. 1947
    • Stremel, J.P.1
  • 11
    • 0018040081 scopus 로고
    • Reliability Evaluation in Energy Limited Generating Capacity Studies
    • November-December
    • R. Billinton and P.G. Harrington, “Reliability Evaluation in Energy Limited Generating Capacity Studies”. IEEE Trans PAS, Vol. 97, No. 6, November-December 1978, pp. 2076–2085.
    • (1978) IEEE Trans PAS , vol.97 , Issue.6 , pp. 2076
    • Billinton, R.1    Harrington, P.G.2
  • 12
    • 0020003293 scopus 로고    scopus 로고
    • Analytic Treatment of Hydro Units with Random Energy in Stochastic Production Simulation
    • Presented at the, Philadelphia, Pennsylvania
    • C. Dechamps, Z. A. Yamayee, and M. Chan, “Analytic Treatment of Hydro Units with Random Energy in Stochastic Production Simulation”. Presented at the 1981 IEEE PICA Conference, Philadelphia, Pennsylvania.
    • 1981 IEEE PICA Conference
    • Dechamps, C.1    Yamayee, Z.A.2    Chan, M.3
  • 13
    • 2942704858 scopus 로고
    • Probabilistic Simulation of Multiple Energy Storage Devices for Production Cost Calculations
    • May
    • Brian Manhire, “Probabilistic Simulation of Multiple Energy Storage Devices for Production Cost Calculations”. Electric Power Research Institute, Report No. EA-1411, May 1980.
    • (1980) Electric Power Research Institute, Report No. EA-1411
    • Manhire, B.1
  • 14
    • 84939013850 scopus 로고
    • Probabilistic Simulation with Multiple Energy-Limited Hydroelectric Units
    • Tel-Aviv University, August
    • D. Feiler, and J. Zahavi, “Probabilistic Simulation with Multiple Energy-Limited Hydroelectric Units”. Working Paper No. 653/80, Tel-Aviv University, August 1980.
    • (1980) Working Paper No. 653/80
    • Feiler, D.1    Zahavi, J.2
  • 15
    • 0020193892 scopus 로고
    • A New Technique for Simulating the Operation of Multiple Assigned - Energy Generating Units Suitable for use in Generation System Expansion Planning Models
    • October
    • B. Manhire and R. T. Jenkins, “A New Technique for Simulating the Operation of Multiple Assigned - Energy Generating Units Suitable for use in Generation System Expansion Planning Models”, IEEE Transactions on Power Apparatus and Systems, Vol. PAS-101, N. 10, October 1982, pp. 3861–3869.
    • (1982) IEEE Transactions on Power Apparatus and Systems , vol.101 PAS , Issue.10 , pp. 3861
    • Manhire, B.1    Jenkins, R.T.2
  • 16
    • 84939762650 scopus 로고
    • Long-Term, Mid-Term, and Short-Term Fuel Scheduling
    • Final Report, Electric Power Research Institute, Palo Alto, CA. January
    • G. E. Seymore, “Long-Term, Mid-Term, and Short-Term Fuel Scheduling”, EPRI EL-2630, Volumes 1 & 2, Project 1048–6, Final Report, Electric Power Research Institute, Palo Alto, CA. January 1980.
    • (1980) EPRI EL-2630, Volumes 1 & 2, Project 1048–6
    • Seymore, G.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.